ARMY UFGS-46 53 62-2011 CONTINUOUS LOOP REACTOR WASTEWATER TREATMENT SYSTEM.pdf
《ARMY UFGS-46 53 62-2011 CONTINUOUS LOOP REACTOR WASTEWATER TREATMENT SYSTEM.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-46 53 62-2011 CONTINUOUS LOOP REACTOR WASTEWATER TREATMENT SYSTEM.pdf(35页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-46 53 62 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 42 59 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 46 - WATER AND WASTEWATER EQUIPMENTSECTION 46 5
2、3 62CONTINUOUS LOOP REACTOR WASTEWATER TREATMENT SYSTEM02/11PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Design Requirements1.2.2 Mixing Parameters1.2.3 Aeration Parameters1.3 SUBMITTALS1.4 OPERATING AND MAINTENANCE INSTRUCTIONS1.5 DELIVERY, STORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2
3、PRODUCTS2.1 MANUFACTURED UNITS2.1.1 Standard Products2.1.2 Nameplates2.1.3 Protection of Moving Parts2.2 MATERIALS2.2.1 Steel Plates, Shapes and Bars2.2.2 Pipe2.2.2.1 Steel Pipe2.2.2.2 Ductile-Iron Pipe2.2.2.3 Polyvinyl Chloride (PVC) Pipe and Fittings2.2.3 Pipe Hangers and Supports2.2.4 Valves2.2.4
4、.1 Gate Valves2.2.4.2 Plug Valves2.2.4.3 Check Valves2.2.5 Joint Compound2.2.6 Joint Tape2.3 DISC AND ROTOR AERATORS2.3.1 Aeration Mechanism2.3.1.1 Disc Assembly2.3.1.2 Rotor Assembly2.3.1.3 Velocity BafflesSECTION 46 53 62 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted w
5、ithout license from IHS-,-,-2.3.1.4 Splash Plates2.3.1.5 Disc and Rotor Immersion Requirements2.3.1.6 Shafts and Bearings2.3.1.7 Protective Covering2.3.2 Drive System2.3.2.1 Reducer2.3.2.2 Housing2.3.2.3 Rating2.3.2.4 Bearings2.3.2.5 Lubrication2.3.2.6 Couplings2.3.3 Mounting2.4 LOW SPEED SURFACE AE
6、RATORS2.4.1 Impeller Shaft2.4.2 Impeller2.4.3 Drive System2.4.3.1 Reducer2.4.3.2 Housing2.4.3.3 Rating2.4.3.4 Bearings2.4.3.5 Lubrication2.4.3.6 Couplings2.4.4 Mounting2.4.5 Protective Covering2.5 SUBMERGED TURBINE DRAFT TUBE AERATORS2.5.1 Impeller Shaft2.5.2 Impeller2.5.3 Drive System2.5.3.1 Reduce
7、r2.5.3.2 Housing2.5.3.3 Rating2.5.3.4 Bearings2.5.3.5 Lubrication2.5.3.6 Couplings2.5.4 Draft Tube2.5.5 Mounting2.5.6 Air Supply Equipment2.6 JET AERATION2.6.1 Submerged Jets2.6.2 Recirculation Pumps2.6.2.1 Vertical Propeller Pump2.6.2.2 Submersible Centrifugal Pumps2.6.2.3 Self-Priming Centrifugal
8、Pumps2.6.2.4 Vertical Turbine Pumps2.6.2.5 Pump Suction Screens2.6.3 Blowers2.7 DIFFUSED AERATION/SLOW SPEED MIXER SYSTEM2.7.1 Diffused Aeration System2.7.2 Slow Speed Mixer (With Submersible Electric Motor)2.7.2.1 Mixer Propeller2.7.2.2 Drive System2.7.2.3 Shafts and Seals2.7.2.4 Mounting2.7.3 Slow
9、 Speed Mixer (With Hydraulic Motors)2.7.3.1 Mixer Propeller2.7.3.2 Drive System2.7.3.3 Mounting2.8 LUBRICATION REQUIREMENTS2.9 ELECTRIC MOTORSSECTION 46 53 62 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.9.1 Frame2.9.2 Design2.9.3 Enclosur
10、e2.9.4 Terminal Boxes2.9.5 Bearings2.9.6 Windings2.9.7 Motor Characteristics2.9.8 Motor Controls2.10 SPECIAL TOOLSPART 3 EXECUTION3.1 EXAMINATION3.2 TREATMENT SYSTEM INSTALLATION3.2.1 Welding3.2.2 Pipe and Valve Installation3.2.2.1 Flanged Joints3.2.2.2 Screwed Joints3.2.2.3 Push-On Joints for PVC P
11、ipe3.2.2.4 Solvent-Weld Joints for PVC Pipe3.2.2.5 Valves3.2.3 Equipment Installation3.2.4 Electrical Work3.3 PAINTING3.3.1 Preparation and Application3.3.2 Coating Examination3.3.3 Coating Repair3.4 FRAMED INSTRUCTIONS3.5 FIELD TESTS AND INSPECTIONS3.5.1 Basin Leakage Test3.5.2 Operating Tests3.5.3
12、 Velocity Test3.5.4 Standard Oxygen Transfer Efficiency Test (S.O.T.E.)3.5.5 Reporting Test Results3.6 MANUFACTURERS SERVICES3.6.1 Supervise Installation, Adjustment, and Testing3.6.2 Field Training- End of Section Table of Contents -SECTION 46 53 62 Page 3Provided by IHSNot for ResaleNo reproductio
13、n or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-46 53 62 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 42 59 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 46 53 62CONTINUOUS
14、 LOOP REACTOR WASTEWATER TREATMENT SYSTEM02/11*NOTE: This guide specification covers the requirements for continuous loop reactor wastewater treatment system.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new p
15、roject specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or n
16、ot brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification.
17、The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the
18、 Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.SECTION 46 53 62 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-References not used in the text will automatically be deleted from this sectio
19、n of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN BEARING MANUFACTURERS
20、 ASSOCIATION (ABMA)ABMA 11 (1990) Load Ratings and Fatigue Life for Roller BearingsABMA 9 (1990; R 2008) Load Ratings and Fatigue Life for Ball BearingsAMERICAN GEAR MANUFACTURERS ASSOCIATION (AGMA)ANSI/AGMA 6013 (2006A) Standard for Industrial Enclosed Gear DrivesANSI/AGMA 6113 (2006A) Standard for
21、 Industrial Enclosed Gear Drives (Metric Edition)AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)ASCE 2-06 (2007) Measurement of Oxygen Transfer in Clean WaterAMERICAN WATER WORKS ASSOCIATION (AWWA)AWWA C110/A21.10 (2008) Ductile-Iron and Gray-Iron Fittings for WaterAWWA C111/A21.11 (2007) Rubber-Gasket J
22、oints for Ductile-Iron Pressure Pipe and FittingsAWWA C115/A21.15 (2005) Flanged Ductile-Iron Pipe With Ductile-Iron or Gray-Iron Threaded FlangesAWWA C151/A21.51 (2009) Ductile-Iron Pipe, Centrifugally Cast, for WaterAWWA C200 (2005) Steel Water Pipe - 6 In. (150 mm) and LargerAWWA C500 (2009) Meta
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS4653622011CONTINUOUSLOOPREACTORWASTEWATERTREATMENTSYSTEMPDF

链接地址:http://www.mydoc123.com/p-449797.html