ARMY UFGS-46 51 00 00 10-2011 AIR AND GAS DIFFUSION EQUIPMENT.pdf
《ARMY UFGS-46 51 00 00 10-2011 AIR AND GAS DIFFUSION EQUIPMENT.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-46 51 00 00 10-2011 AIR AND GAS DIFFUSION EQUIPMENT.pdf(32页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-46 51 00.00 10 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 42 13.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 46 - WATER AND WASTEWATER EQUIPMENT
2、SECTION 46 51 00.00 10AIR AND GAS DIFFUSION EQUIPMENT02/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 QUALIFICATIONS1.4 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT REQUIREMENTS2.1.1 Standard Products2.1.2 Nameplates2.1.3 Special Tools2.1.4 Factory Painting2.2 MATERIAL
3、S AND EQUIPMENT2.2.1 Ductile Iron Pipe and Fittings2.2.2 Steel Pipe and Fittings2.2.3 Polyvinyl Chloride (PVC) Pipe and Fittings2.2.4 Stainless Steel Tubing and Fittings2.2.4.1 Stainless Steel Tubing2.2.4.2 Stainless Steel Tubing Fittings2.2.4.3 Stainless Steel Tubing Joints2.2.5 Pipe Hangers and Su
4、pports2.2.6 Valves2.2.6.1 Butterfly Valves2.2.6.2 Gate Valves2.2.6.3 Globe Valves2.2.6.4 Relief and Unloading Valves2.2.6.5 Check Valves2.2.7 Expansion Couplings2.3 AIR-SUPPLY EQUIPMENT2.3.1 Centrifugal Blowers2.3.1.1 Performance and Design Requirements2.3.1.2 Casing2.3.1.3 Impellers2.3.1.4 Diffuser
5、sSECTION 46 51 00.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.3.1.5 Shaft2.3.1.6 Shaft Seals2.3.1.7 Internal Seals2.3.1.8 Bearings2.3.1.9 Pressure Oil Lubrication System2.3.1.10 Splash Oil Lubrication System2.3.1.11 Inlet Guide Vane
6、s2.3.1.12 Centrifugal Blower Speed Increasing Gears2.3.2 Positive Displacement Blowers2.3.2.1 Performance and Design Requirements2.3.2.2 Casing2.3.2.3 Impeller and Shaft2.3.2.4 Timing Gears2.3.2.5 Bearings2.3.2.6 Seals2.3.2.7 Lubrication2.3.3 Drive Connection2.3.4 Motors2.3.5 Power Factor Capacitors
7、2.3.6 Blower - Motor Base2.3.7 Concrete Foundation2.3.8 Filters2.3.9 Accessories2.3.9.1 Silencers2.3.9.2 Acoustical Insulation2.3.9.3 Gauges2.3.9.4 Thermometers2.3.9.5 Temporary Screens2.3.9.6 Inlet and Discharge Elbows2.3.9.7 Expansion Couplings2.3.10 Manual Control System2.3.11 Automatic Control a
8、nd Monitoring System2.3.11.1 Panel Construction2.3.11.2 Automatic Control2.3.11.3 Indicators2.3.11.4 Blower Protective Devices2.3.11.5 Vibration Monitoring2.3.11.6 Control Logic2.4 AIR DISTRIBUTION SYSTEM2.4.1 Air Main2.4.2 Removable Header Air Distribution System2.4.2.1 Air Supply Riser Assembly2.4
9、.2.2 Air Supply Lateral Assembly2.4.2.3 Removable Header Assembly2.4.2.4 Supports and Guides2.4.3 Rotary or Swing Header Air Distribution System2.4.3.1 Air Supply Assembly2.4.3.2 Rotary or Swing Header Assembly2.4.3.3 Supports and Guides2.4.4 Fixed Header Air Distribution System2.4.4.1 Drop Leg Asse
10、mbly2.4.4.2 Fixed Headers2.4.4.3 Support System2.4.5 Lagoon Air Distribution System2.4.5.1 Fixed Air Distribution Headers2.4.5.2 Supports2.4.5.3 Airlift Purge System2.4.5.4 Gas Cleaning System2.5 DIFFUSERSSECTION 46 51 00.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitt
11、ed without license from IHS-,-,-2.5.1 Diffuser Performance2.5.2 Porous Diffusers2.5.2.1 Porous Ceramic Discs2.5.2.2 Porous Membrane Tubes with Supports2.5.2.3 Porous Cloth Media with Plastic Tube Liner2.5.3 Non-Porous Diffusers2.5.3.1 Nozzle-Type Diffusers2.5.3.2 Orifice-Type Diffusers2.5.3.3 Valved
12、 Orifice Diffusers2.5.4 Lagoon Aeration Diffuser Tubing2.5.5 Spare Diffusers2.6 HOIST2.7 METERING AND INSTRUMENTATIONPART 3 EXECUTION3.1 EXAMINATION3.2 EQUIPMENT INSTALLATION3.2.1 Blower Installation3.2.2 Air Distribution System Installation3.2.3 Diffuser Installation3.3 WELDING3.4 FRAMED INSTRUCTIO
13、NS3.5 FIELD TESTING3.5.1 Blower Test3.5.2 Piping System Test3.5.3 Diffuser Test3.6 PAINTING3.7 MANUFACTURERS SERVICES3.8 FIELD TRAINING- End of Section Table of Contents -SECTION 46 51 00.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*U
14、SACE / NAVFAC / AFCESA / NASA UFGS-46 51 00.00 10 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 42 13.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 46 51 00.00 10AIR AND GAS DIFFUSION EQUIPMENT02/11*NOTE: This g
15、uide specification covers the requirements for air supply and diffusion equipment for sewage treatment plants.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide s
16、pecification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions an
17、d recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by
18、basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizar
19、ds Check Reference feature to update the issue dates.SECTION 46 51 00.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-References not used in the text will automatically be deleted from this section of the project specification when you ch
20、oose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)ABMA 11 (1990) Load Rat
21、ings and Fatigue Life for Roller BearingsABMA 9 (1990; R 2008) Load Ratings and Fatigue Life for Ball BearingsAMERICAN GEAR MANUFACTURERS ASSOCIATION (AGMA)ANSI/AGMA 6011 (2003I; R 2008) Specifications for High Speed Helical Gear UnitsAMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING E
22、NGINEERS (ASHRAE)ASHRAE 52.2 (2007; Addenda B 2008; Errata 2009, Errata 2010; INT 2010) Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle SizeAMERICAN WATER WORKS ASSOCIATION (AWWA)AWWA C110/A21.10 (2008) Ductile-Iron and Gray-Iron Fittings for WaterAWWA C
23、111/A21.11 (2007) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and FittingsAWWA C115/A21.15 (2005) Flanged Ductile-Iron Pipe With Ductile-Iron or Gray-Iron Threaded FlangesAWWA C151/A21.51 (2009) Ductile-Iron Pipe, Centrifugally Cast, for WaterAWWA C200 (2005) Steel Water Pipe - 6 In. (150 mm
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS46510000102011AIRANDGASDIFFUSIONEQUIPMENTPDF

链接地址:http://www.mydoc123.com/p-449796.html