1、*USACE / NAVFAC / AFCESA / NASA UFGS-46 24 16 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 42 26 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 46 - WATER AND WASTEWATER EQUIPMENTSECTION 46 2
2、4 16COMMINUTORS02/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 MANUFACTURERS SERVICES1.4 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 STANDARD PRODUCTS2.2 NAMEPLATES2.3 PROTECTION FROM MOVING PARTS2.4 MATERIALS2.4.1 Cast Iron2.4.2 Bearings2.4.3 Aluminum Alloy2.4.4 Miscellaneous Metal2.5 ELEC
3、TRIC MOTOR AND CONTROLLER2.6 COMMINUTOR2.6.1 Rotating Drum Type2.6.2 Rotating Disc or Conical Type2.6.3 Oscillating Type2.7 MOTOR CONTROLLER2.8 DESIGN2.9 GEAR MOTOR2.10 GEAR MOTOR MOUNTING2.11 HYDRAULIC DRIVE2.12 CUTTING ELEMENTS2.13 BEARINGS2.14 LUBRICATION2.15 ANCHORAGE2.15.1 Installation Within a
4、 Channel2.15.2 Installation Within a PipelinePART 3 EXECUTIONSECTION 46 24 16 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1 EXAMINATION3.2 INSTALLATION3.3 ELECTRICAL WORK3.4 PAINTING3.5 SPECIAL TOOLS3.6 FRAMED INSTRUCTIONS3.7 FIELD TESTS3
5、.7.1 Scheduling3.7.2 Tests3.8 TRAINING- End of Section Table of Contents -SECTION 46 24 16 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-46 24 16 (February 2011)-Preparing Activity: USACE SupersedingUFGS-4
6、4 42 26 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 46 24 16COMMINUTORS02/11*NOTE: This guide specification covers the requirements for comminutor for use in sewage treatment plants normally handling domestic sewage.Adhere to UFC
7、1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable
8、 items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*P
9、ART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards
10、Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.SECTION 46 24 16 Page 3Provided by IHSNot for ResaleNo reproduction or
11、networking permitted without license from IHS-,-,-References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the
12、extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN BEARING MANUFACTURERS ASSOCIATION (ABMA)ABMA 11 (1990) Load Ratings and Fatigue Life for Roller BearingsABMA 9 (1990; R 2008) Load Ratings and Fatigue Life for Ball BearingsASTM INTERNATIONAL (
13、ASTM)ASTM A153/A153M (2009) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel HardwareASTM A48/A48M (2003; R 2008) Standard Specification for Gray Iron CastingsASTM B 108/B 108M (2008) Standard Specification for Aluminum-Alloy Permanent Mold CastingsASTM F 593 (2002; R 2008) Stainl
14、ess Steel Bolts, Hex Cap Screws, and StudsNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA ICS 2 (2000; R 2005; Errata 2008) Standard for Controllers, Contactors, and Overload Relays Rated 600 VNEMA MG 1 (2009) Motors and Generators1.2 SUBMITTALS*NOTE: Review submittal description (SD) defin
15、itions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approv
16、al. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.SECTION 46 24 16 Page
17、 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority.
18、 Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typ
19、ically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are
20、for Contractor Quality Control approval.information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsCommi
21、nutor; G; G, _Drawings indicating clearances required for maintenance and operation, containing complete wiring and schematic diagrams, equipment layout and anchorage, and any other details required to demonstrate that the system has been coordinated and will properly function as a unit.SD-03 Produc
22、t DataSpare PartsSpare parts data for each different item of materials and equipment specified, after approval of the drawings and not later than _ months prior to the date of beneficial occupancy . Include in the data a complete list of parts and supplies with current unit prices and source of supp
23、ly.Materials and EquipmentA complete list of equipment and materials, including manufacturers descriptive and technical literature, catalog cuts, and installation instructions.Framed InstructionsProposed diagrams, instructions, and other sheets, prior to posting.SD-06 Test ReportsSECTION 46 24 16 Pa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS4624162011COMMINUTORSPDF