ARMY UFGS-46 07 53 16-2011 PACKAGED WASTEWATER TREATMENT EQUIPMENT BIOCHEMICAL.pdf
《ARMY UFGS-46 07 53 16-2011 PACKAGED WASTEWATER TREATMENT EQUIPMENT BIOCHEMICAL.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-46 07 53 16-2011 PACKAGED WASTEWATER TREATMENT EQUIPMENT BIOCHEMICAL.pdf(30页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-46 07 53.16 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 41 13 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 46 - WATER AND WASTEWATER EQUIPMENTSECTION
2、 46 07 53.16PACKAGED WASTEWATER TREATMENT EQUIPMENT, BIOCHEMICAL02/11PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Extended Aeration Plant Design1.2.1.1 Aeration Zone1.2.1.2 Sludge-Settling Zone1.2.1.3 Sludge-Holding Zone1.2.1.4 Chlorination Zone1.2.2 Contact Stabilization Plant Design1.2.
3、2.1 Contact Zone1.2.2.2 Sludge-Settling Zone1.2.2.3 Reaeration Zone1.2.2.4 Sludge-Holding Zone1.2.2.5 Chlorination Zone1.3 SUBMITTALS1.4 QUALIFICATIONS1.5 DELIVERY, STORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT REQUIREMENTS2.1.1 Standard Products2.1.2 Nameplates2
4、.1.3 Special Tools2.2 MATERIALS2.2.1 Steel Plates, Shapes, and Bars2.2.2 Ductile Iron Pipe2.2.2.1 Flanged Ductile Iron Pipe2.2.2.2 Joints2.2.2.3 Fittings for Ductile Iron Pipe2.2.3 Steel Pipe2.2.3.1 Flanged Joints2.2.3.2 Slip Joints2.2.3.3 Mechanical JointsSECTION 46 07 53.16 Page 1Provided by IHSNo
5、t for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.3.4 Welded Joints2.2.3.5 Fittings for Steel Pipe2.2.4 Galvanized Steel Pipe and Fittings2.2.5 Polyvinyl Chloride (PVC) Pipe and Fittings2.2.5.1 Push-On Joints2.2.5.2 Solvent Cement2.2.6 Pipe Hangers and Supports2.2.
6、7 Valves2.2.7.1 Angle, Check, and Globe Valves2.2.7.2 Gate Valves2.2.7.3 Plug Valves2.2.8 Joint Compound2.2.9 Joint Tape2.2.10 Bolts and Nuts2.3 EQUIPMENT2.3.1 Electric Motors2.3.2 Motor Controls2.3.3 Protection from Moving Parts2.4 SEWAGE SHREDDER2.4.1 Performance and Design Requirements2.4.2 Scree
7、ning and Cutting Mechanism2.4.3 Motor and Mounting2.4.4 Controls2.4.5 By-Pass Bar Screen2.5 BLOWERS2.5.1 Performance and Design Requirements2.5.1.1 Capacity2.5.1.2 Impellers2.5.1.3 Discharge2.5.2 Drive2.5.3 Controls2.5.4 Air Pressure Gauges2.5.5 Pressure Relief Valve2.5.6 Air Filter-Silencer2.5.7 Mo
8、unting2.5.8 Enclosure2.6 AIR-DIFFUSION EQUIPMENT2.6.1 Performance and Design Requirements2.6.2 Piping and Valves2.6.3 Diffusers2.7 SLUDGE AND SCUM RECIRCULATION EQUIPMENT2.7.1 Piping and Valves2.7.2 Air Lift Pumps2.7.3 Mechanical Sludge Collector2.8 FROTH CONTROL SYSTEM2.8.1 Froth Spray Pump2.8.2 Pi
9、ping and Valves2.8.3 Froth Spray Nozzles2.9 GAS CHLORINATION SYSTEM2.9.1 Gas Chlorinator2.9.1.1 Vacuum Regulator2.9.1.2 Flow Meter2.9.1.3 Flow Proportioning Valve2.9.1.4 Proportioner2.9.1.5 Ejector2.9.2 Booster Pump2.9.3 Diffuser2.9.4 Chlorinator Enclosure2.9.5 Piping and ValvesSECTION 46 07 53.16 P
10、age 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.9.6 Cylinder Scale2.9.7 Gas Mask2.10 CALCIUM HYPOCHLORITE CHLORINATION SYSTEM2.10.1 Chemical Solution Tank2.10.2 Metering Pump2.10.3 Diffuser2.10.4 Chlorinator Enclosure2.10.5 Piping and Valves2.
11、11 SEWAGE PUMPS2.11.1 Pumps2.11.2 Controls2.11.3 Pumping Structures2.12 FLOW METERING AND CONTROL2.12.1 Flow Metering2.12.1.1 Float Operation2.12.1.2 Ultrasonic Measuring2.12.2 Flow Control2.13 ACCESS WALKWAYS, PLATFORMS, AND HANDRAILS2.14 LUBRICATIONPART 3 EXECUTION3.1 EXAMINATION3.2 TREATMENT PLAN
12、T CONSTRUCTION3.2.1 Pipe and Valve Installation3.2.1.1 Flanged Joints3.2.1.2 Screw Joints3.2.1.3 Push-On Joints for PVC Pipe3.2.1.4 Solvent-Weld Joints for PVC Pipe3.2.1.5 Valves3.2.2 Equipment Installation3.2.3 Electrical Work3.3 FRAMED INSTRUCTIONS3.4 TREATMENT PLANT INSTALLATION3.4.1 Preparation3
13、.4.2 Installation3.4.3 Testing and Adjusting3.5 WELDING3.5.1 Procedures3.5.2 Testing3.5.2.1 Non-Destructive Testing3.5.2.2 Correction of Defective Welds3.6 PAINTING3.6.1 Preparation and Application3.6.2 Coating Testing3.6.3 Coating Repair3.7 MANUFACTURERS SERVICES3.8 FIELD TRAINING- End of Section T
14、able of Contents -SECTION 46 07 53.16 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-46 07 53.16 (February 2011)-Preparing Activity: USACE SupersedingUFGS-44 41 13 (October 2007)UNIFIED FACILITIES GUIDE SPE
15、CIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 46 07 53.16PACKAGED WASTEWATER TREATMENT EQUIPMENT, BIOCHEMICAL02/11*NOTE: This guide specification covers the requirements for prefabricated biochemical wastewater treatment plants up to 380,000 L per day (100,000 gpd) capaci
16、ty.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items,
17、choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change
18、 Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the R
19、eference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update SECTION 46 07 53.16 Page 4Provided by IHSNot for ResaleNo reproduction
20、 or networking permitted without license from IHS-,-,-the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this s
21、pecification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN PETROLEUM INSTITUTE (API)API Spec 6D (2008; Errata 2008; Errata 2008; Errata 2009; Addendum 2009; Errata 2010) Specification for Pipeline ValvesAMERICAN WATER WORKS ASSOCIAT
22、ION (AWWA)AWWA C110/A21.10 (2008) Ductile-Iron and Gray-Iron Fittings for WaterAWWA C111/A21.11 (2007) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and FittingsAWWA C115/A21.15 (2005) Flanged Ductile-Iron Pipe With Ductile-Iron or Gray-Iron Threaded FlangesAWWA C151/A21.51 (2009) Ductile-Iron
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS460753162011PACKAGEDWASTEWATERTREATMENTEQUIPMENTBIOCHEMICALPDF

链接地址:http://www.mydoc123.com/p-449791.html