ARMY UFGS-34 41 26 00 10-2009 ACCESS CONTROL POINT CONTROL SYSTEM《访问控制点控制系统》.pdf
《ARMY UFGS-34 41 26 00 10-2009 ACCESS CONTROL POINT CONTROL SYSTEM《访问控制点控制系统》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-34 41 26 00 10-2009 ACCESS CONTROL POINT CONTROL SYSTEM《访问控制点控制系统》.pdf(65页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS 34 41 26.00 10 (February 2009)-Preparing Activity: USACE SupersedingUFGS 34 41 26.00 10 (April 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2009*SECTION TABLE OF CONTENTSDIVISION 34 - TRANSPORTATIONSECTION 34 41
2、26.00 10ACCESS CONTROL POINT CONTROL SYSTEM02/09PART 1 GENERAL1.1 REFERENCES1.2 ACRONYM LIST1.3 SYSTEM DESCRIPTION1.3.1 Design Strategy1.3.1.1 Detection1.3.1.2 Deploy the Barrier1.3.1.3 Delay1.3.2 Over-speed and Wrong-Way Sensors1.3.2.1 Point Over Speed1.3.2.2 Continuous Over Speed Detection - One Z
3、one1.3.2.3 Continuous Over Speed Detection - Two Zones1.3.2.4 Wrong Way Detection1.3.3 Active Vehicle Barrier Safety System1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Project Manager Qualifications1.5.2 Installation Superintendent Qualifications1.5.3 QC Representative Qualifications1.5.4 Technical Spec
4、ialists Qualifications1.5.5 Line Supervision1.5.5.1 General1.5.5.2 Data Transmission System (DTS)1.6 DELIVERY OF TECHNICAL DATA AND COMPUTER SOFTWARE1.6.1 Group I Technical Data Package1.6.2 Group II Technical Data Package1.6.3 Group III Technical Data Package1.6.4 Group IV Technical Data Package1.6
5、.4.1 Active Vehicle Barrier Controls1.6.4.2 Over-speed and Wrong-way detection1.6.4.3 Traffic Control Plan for the Maintenance of Traffic During Construction1.6.4.4 Traffic Control Plan During Active Vehicle Barrier Maintenance1.6.4.5 Application SoftwareSECTION 34 41 26.00 10 Page 1Provided by IHSN
6、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.6.4.6 Software Manual1.6.4.7 Hardware Manual1.6.4.8 Functional Design Manual1.6.4.9 Maintenance Manual1.6.4.10 Training Documentation1.6.4.11 Data Entry1.6.5 Group V Technical Data Package1.6.5.1 Group IV Manuals1.6.
7、5.2 Final System Drawings1.7 WARRANTY1.8 MAINTENANCE AND SERVICE1.8.1 Description of Work1.8.2 Service Personnel1.8.3 Schedule of Work1.8.3.1 Minor Inspections1.8.3.2 Major Inspections1.8.3.3 Scheduled Work1.8.4 Emergency Service1.8.5 Operation1.8.6 Records and Logs1.8.7 Work Requests1.8.8 System Mo
8、difications1.8.9 SoftwarePART 2 PRODUCTS2.1 MATERIALS2.1.1 Materials and Equipment2.1.2 Field Enclosures2.1.2.1 Interior Sensors2.1.2.2 Exterior Sensors2.1.2.3 Interior Electronics2.1.2.4 Exterior Electronics2.1.2.5 Corrosion Resistant2.1.3 Nameplates2.1.4 Tamper Switches2.1.5 Locks and Key-Lock Swi
9、tches2.1.5.1 Locks2.1.5.2 Key-Lock-Operated Switches2.1.5.3 Construction Locks2.1.6 System Components2.1.6.1 Modularity2.1.6.2 Maintainability2.1.6.3 Interchangeability2.1.6.4 Product Safety2.1.7 Controls and Designations2.1.8 System Integration2.1.9 Environmental Conditions2.1.9.1 Interior Conditio
10、ns2.1.9.2 Exterior Conditions2.2 ACTIVE VEHICLE BARRIER CONTROL SYSTEM (AVBCS)2.2.1 General Requirements2.2.2 AVBCS Processor2.2.3 Timing Requirements2.2.4 Conflict Monitor2.2.5 Configuration2.2.6 Communications2.3 TRAFFIC CONTROLLER UNIT (TCU) PROCESSING AND CONTROL SOFTWARE2.3.1 GeneralSECTION 34
11、41 26.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.3.2 Load and Adjust Software2.3.3 Display Information2.3.4 TCU Utility Programming2.3.5 Command Software2.3.6 Command Input and Errors2.3.7 Special Functions2.3.8 System Access Contr
12、ol2.3.9 Alarms2.3.10 Report Generator2.3.11 Periodic Automatic Report2.3.12 ACP Processing and Control Database2.3.13 Database Definition Process2.3.14 Historical Data Storage and Retrieval2.3.15 Security Management2.4 GATEHOUSE CONTROL CONSOLE (GCC)2.5 ALARM DISPLAY IN THE GCC2.6 SEQUENCE OF EVENTS
13、 RECORDER2.7 ALARM PANELS AT THE GUARD BOOTHS2.8 GUARD BOOTH AND OVERWATCH POSITION CONTROL PANELS2.9 CCTV SYSTEM2.10 UNINTERRUPTABLE POWER SUPPLIES (UPS)2.11 OVER SPEED, WRONG-WAY, AND VEHICLE PRESENCE DETECTORS2.11.1 Photoelectric Type2.11.2 Induction Loops2.11.3 Radar2.11.4 Video Detection2.12 BA
14、LANCED MAGNETIC SWITCH (BMS)2.12.1 BMS Subassemblies2.12.2 Housing2.12.3 Remote Test2.12.4 Access/Secure2.13 DURESS ALARMS2.13.1 Foot-rail2.13.2 Push-button2.13.3 Wireless2.14 ACTUATED TRAFFIC ARMS2.14.1 Traffic Arm Assembly2.14.2 Presence Detection Safety System Only2.15 TRAFFIC SIGNALS2.16 WARNING
15、 BEACONS2.17 TRAFFIC SIGNAL SUPPORTS2.18 ACTIVE VEHICLE BARRIERS2.19 SIGNS AND PAVEMENT MARKINGS2.20 WIRE AND CABLE2.20.1 Above Ground Sensor Wiring2.20.2 Direct Burial Sensor Wiring2.20.3 Cable Construction2.21 POWER LINE SURGE PROTECTION2.21.1 Sensor Device Wiring and Communication Circuit Surge P
16、rotection2.21.2 Power Line Conditioners2.22 FACTORY ACCEPTANCE TEST2.22.1 General2.22.2 Test Plan2.22.3 Test2.22.4 Test ReportPART 3 EXECUTION3.1 EXAMINATIONSECTION 34 41 26.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2 INSTALLATION
17、3.2.1 Oversight3.2.2 Installation Schedule3.2.3 Wiring3.2.4 Grounding3.2.5 Enclosure Penetrations3.2.6 Cold Galvanizing3.2.7 Other Requirements3.2.8 Incidental Infrastructure3.3 CONTRACTOR FIELD TEST3.4 COMMISSIONING3.4.1 General3.4.2 Commissioning Team Leader3.4.3 Commissioning Team3.4.4 Training3.
18、4.4.1 General Requirements3.4.4.2 Guards Training3.4.4.3 Maintenance Personnel Training3.4.4.4 System Manager Training3.4.5 Performance Verification Test (PVT)3.4.5.1 Test Plan3.4.5.2 Test Equipment3.4.5.3 Test3.4.5.4 Test Report3.4.5.5 Opposite Season Test3.4.6 Endurance Test3.4.6.1 General3.4.6.2
19、Phase I Testing3.4.6.3 Phase II Assessment3.4.6.4 Phase III Testing3.4.6.5 Phase IV Assessment3.4.7 Commissioning Report3.5 APPENDICES- End of Section Table of Contents -SECTION 34 41 26.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*US
20、ACE / NAVFAC / AFCESA / NASA UFGS 34 41 26.00 10 (February 2009)-Preparing Activity: USACE SupersedingUFGS 34 41 26.00 10 (April 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2009*SECTION 34 41 26.00 10ACCESS CONTROL POINT CONTROL SYSTEM02/09*NOTE: T
21、his specification covers the requirements for the design of an access control point control system.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove informati
22、on and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS34412600102009ACCESSCONTROLPOINTCONTROLSYSTEM 访问 控制 控制系统 PDF

链接地址:http://www.mydoc123.com/p-449779.html