ARMY UFGS-34 11 00-2008 RAILROAD TRACK AND ACCESSORIES《铁轨及附件》.pdf
《ARMY UFGS-34 11 00-2008 RAILROAD TRACK AND ACCESSORIES《铁轨及附件》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-34 11 00-2008 RAILROAD TRACK AND ACCESSORIES《铁轨及附件》.pdf(102页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-34 11 00 (April 2008)-Preparing Activity: USACE SupersedingUFGS-34 11 00 (January 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 34 - TRANSPORTATIONSECTION 34 11 00RAILROAD TRAC
2、K AND ACCESSORIES04/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Rail1.1.1.1 Out-of-Face Rail Replacement1.1.1.2 Spot Rail Replacement1.1.2 Joint Bars1.1.3 Compromise Joints1.1.4 Turnouts1.1.4.1 New Turnouts1.1.4.2 Turnout Repair1.1.5 Track Crossing1.1.6 Crossties and Switch Ties1.1.7 Geotextiles1.1.8 Balla
3、st, Out-of-Face Surface and Aligning1.1.9 Subballast1.1.10 Bridge Work1.1.10.1 Lump Sum Payment1.1.10.2 Track over Ballasted-deck Bridges1.1.11 Track Spikes1.1.12 Track Bolt Assemblies1.1.13 Tie Plates1.1.14 Rail Anchors1.1.15 Insulated Joints1.1.16 New Bumpers1.1.17 New Wheelstops1.1.18 Salvaged Bu
4、mpers and Wheelstops1.1.19 Install Bumpers1.1.20 Install Wheelstops1.1.21 Cushion Head for Bumper1.1.22 Fastenings1.1.23 Inner Guard Rail1.1.24 Adjusted gage Rods1.1.25 New gage Rods1.1.26 Salvaged gage Rods1.1.27 Installed Salvaged gage RodsSECTION 34 11 00 Page 1Provided by IHSNot for ResaleNo rep
5、roduction or networking permitted without license from IHS-,-,-1.1.28 New Derails1.1.29 Installed Derails1.1.30 Rail Welding1.1.30.1 Rail Welding Thermite1.1.30.2 Rail Welding Electric Arc1.1.31 Rail Joint Gap Adjustment1.1.32 Rail Joint Repair1.1.33 Respiking1.1.34 Rail Cropping1.1.35 Tighten Bolts
6、1.1.36 Bolt Assembly Replacement1.1.37 Track Construction1.1.38 Track Removal and Salvage1.1.39 Track Removal and Scrap1.1.40 Turnout Removal and Salvage1.1.41 Straight Rail Turnout1.1.42 Rail Bonds1.1.43 Rail Grounds1.1.44 Removal of Existing Crossing Surfaces1.1.45 Salvage of Grade Crossing Panel1
7、.1.46 Track Removal and Track Construction Through Crossings1.1.47 Grade Crossing Surface Installation1.1.48 Subdrains1.1.49 Conduit1.1.50 Cleaning Flangeways1.1.51 Ultrasonic Testing of Rail1.1.52 Electric Arc Welding1.2 REFERENCES1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Track Construction1.4.2 Wel
8、ding1.5 DELIVERY, STORAGE, AND HANDLING1.5.1 Materials and Samples1.5.2 Geotextiles1.6 PROJECT/SITE CONDITIONS1.6.1 Temporary Work1.6.2 Traffic Control1.6.3 Welding1.6.4 License Agreement1.6.4.1 Provisions and Requirements1.6.4.2 Insurance Policy RequirementsPART 2 PRODUCTS2.1 BALLAST2.2 SUBBALLAST2
9、.3 GEOTEXTILE2.3.1 Physical Property Requirements2.3.2 Dimensional Requirements2.4 JOINT BARS2.4.1 New Joint Bars2.4.2 Used Joint Bars2.4.3 Compromise Joint Bars2.4.3.1 New Compromise Joint Bars2.4.3.2 Used Compromise Joint Bars2.5 GREASE2.6 OIL FOR CORROSION PROTECTION2.7 RAILSECTION 34 11 00 Page
10、2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.7.1 New Jointed Rail2.7.1.1 General Requirements2.7.1.2 New Industrial Grade Rail2.7.2 Used Jointed Rail2.7.2.1 Relief Rail2.7.2.2 Relay Rail2.7.3 Welded Rail2.8 TIE PLATES2.8.1 General2.8.2 Used Tie
11、 Plates2.9 WOOD TIES2.9.1 Crossties2.9.2 Switch Ties2.9.3 Bridge Ties2.9.3.1 Ballasted-Deck Bridge Ties2.9.3.2 Open-Deck Bridge Ties2.9.4 Tie Plugs2.9.5 Anti-splitting Devices2.10 BRIDGE TIMBERS2.11 BRIDGE LUMBER2.12 BRIDGE PILES2.13 ENGINEERED POLYMER COMPOSITE TIES2.13.1 Crossties2.13.2 Switch Tie
12、s2.13.3 Ballasted-Deck Bridge Ties2.13.4 Tie Plugs2.14 STEEL TIES2.15 CONCRETE TIES2.16 TURNOUTS AND TRACK CROSSINGS2.16.1 Rail and Joint Bars2.16.2 Maximum Wear Used Rails Installed in Turnouts2.16.3 Frogs, Switches, Guardrails and Appurtenances2.16.3.1 Switches2.16.3.2 Frogs2.16.3.3 New or Replace
13、ment Guard Rails2.16.3.4 Hook Plates2.16.3.5 Switch Stands2.16.4 Track Crossings2.16.5 Rail Braces2.17 GRADE CROSSINGS2.17.1 Crossing Material or Surface2.17.2 Rail2.17.3 Ties2.17.4 Track Materials2.17.5 Threaded Fasteners and Screw Spikes2.17.6 Pipe for Subdrains2.17.7 Cable Conduit2.18 MISCELLANEO
14、US TRACK MATERIALS2.18.1 Spikes2.18.1.1 Track Spikes2.18.1.2 Bridge Spikes2.18.2 Bolts, Nuts, and Spring Washers2.18.2.1 Bolts and Nuts2.18.2.2 Spring Washers2.18.3 Rail Anchors2.18.3.1 New Installation2.18.3.2 Salvaged Rail Anchors2.18.3.3 Rail Clips and Fasteners2.18.4 Insulated JointsSECTION 34 1
15、1 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.18.5 Bumping Posts, Cushion Heads and Wheelstops2.18.5.1 Bumping Posts2.18.5.2 Cushion Heads2.18.5.3 Wheelstops2.18.6 Used Bumping Posts and Wheelstops2.18.7 Inner Guard Rail2.18.8 Gage Rod
16、s2.18.8.1 New Gage Rods2.18.8.2 Used Gage Rods2.18.9 Derails2.18.9.1 New Derails2.18.9.2 Used Derails2.19 SALVAGED MATERIALS2.19.1 Dunnage2.19.2 Marking Paint2.19.3 Salvaging Rail2.19.4 Joint Bars2.19.5 Tie Plates2.20 RAIL BONDING AND GROUNDING2.20.1 Rail Bonds2.20.2 Grounding Rods2.20.3 Ground Conn
17、ection Cables2.20.4 Electrical Connecting Hardware2.21 WELDING2.21.1 Rail Welding Kits2.21.2 ElectrodesPART 3 EXECUTION3.1 REMOVAL, SALVAGE, AND DISPOSITION OF MATERIALS3.1.1 Materials To Be Salvaged3.1.2 Methods and Procedures3.1.3 Inventory of Track Materials3.1.4 Inspection and Reconditioning of
18、Used Track Materials3.1.4.1 Cleaning By Hand or Mechanical Means3.1.4.2 Visual Examination of Rails3.1.4.3 Visual Examination of Joint Bars3.1.4.4 Visual Examination of Gage Rods3.1.4.5 Visual Examination of Tie Plates and Rail Anchors3.1.4.6 Gage Rods3.1.4.7 Grade Crossing Materials3.1.5 Transport
19、and Stack Excess and Salvaged Materials3.1.5.1 Material Not Used In Track Repair3.1.5.2 Stacking of Rails3.1.5.3 Stacking of Joint Bars, Gage Rods, and Tie Plates3.1.5.4 Containers3.1.5.5 Stacking of Special Trackwork Materials3.1.6 Material to be Scrapped3.2 PLACEMENT OF BALLAST AND SUBBALLAST3.2.1
20、 Subballast3.2.1.1 Subballast Placement3.2.1.2 Subballast Compaction3.2.2 Ballast3.2.2.1 Ballast Placement3.2.2.2 Ballast Distribution3.2.2.3 Ballast Below Ties3.3 TRACK CONSTRUCTION AND OUT-OF-FACE RELAY3.3.1 Roadbed Preparation3.3.2 Geotextile for Track ConstructionSECTION 34 11 00 Page 4Provided
21、by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3.3 Unloading the Materials3.3.4 Ties3.3.5 Tie Plates3.3.6 Rail3.3.6.1 Laying Rail3.3.6.2 Joints3.3.6.3 Expansion Allowance3.3.6.4 Cutting Rail3.3.6.5 Matching Rails3.3.6.6 Rail Replacement3.3.6.7 Out-of-Face
22、Rail Relay3.3.6.8 Spot Rail Replacement3.3.7 Joint Bars3.3.8 Spiking3.3.8.1 Spiking Procedures3.3.8.2 Number of Spikes3.3.9 Tie Plugs3.3.10 Rail Anchor Placement3.3.11 Inner Guard Rails3.3.12 Derails3.3.13 Superelevation3.3.14 Preliminary Surfacing3.3.14.1 Lifts3.3.14.2 Tamping3.3.14.3 Replacement o
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3411002008RAILROADTRACKANDACCESSORIES 铁轨 附件 PDF

链接地址:http://www.mydoc123.com/p-449778.html