1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 70 02.00 10 (November 2008)-Preparing Activity: USACE SupersedingUFGS-33 70 02.00 10 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 70 02.
2、00 10ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND11/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Detail Drawings1.4.2 As-Built Drawings1.5 DELIVERY, STORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 STANDARD PRODUCT2.2 NAMEPLATES2.2.1 General2.
3、2.2 Liquid-Filled Transformer Nameplates2.3 CORROSION PROTECTION2.3.1 Aluminum Materials2.3.2 Ferrous Metal Materials2.3.2.1 Hardware2.3.2.2 Equipment2.3.3 Finishing2.4 CABLES2.4.1 Medium-Voltage Cables2.4.1.1 General2.4.1.2 Ratings2.4.1.3 Conductor Material2.4.1.4 Insulation2.4.1.5 Shielding2.4.1.6
4、 Neutrals2.4.1.7 Jackets2.4.2 Low-Voltage Cables2.4.2.1 Conductor Material2.4.2.2 Insulation2.4.2.3 JacketsSECTION 33 70 02.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.4.2.4 Direct Buried2.4.2.5 In Duct2.5 CABLE JOINTS, TERMINATIONS
5、, AND CONNECTORS2.5.1 Medium-Voltage Cable Joints2.5.2 Medium-Voltage Separable Insulated Connectors2.5.3 Low-Voltage Cable Splices2.5.4 Terminations2.5.4.1 Factory Preformed Type2.5.4.2 Taped Terminations2.6 CONDUIT AND DUCTS2.6.1 Metallic Conduit2.6.2 Nonmetallic Ducts2.6.2.1 Bituminized Fiber Duc
6、t2.6.2.2 Concrete Encased Ducts2.6.2.3 Direct Burial2.6.3 Conduit Sealing Compound2.7 MANHOLES, HANDHOLES, AND PULLBOXES2.8 POLES AND HARDWARE2.9 TRANSFORMERS, SUBSTATIONS, AND SWITCHGEAR2.9.1 Secondary Unit Substation2.9.1.1 Incoming Section2.9.1.2 Transformer Section2.9.1.3 Integral Outgoing Secti
7、on2.9.1.4 Nonintegral (Cable Compartment) Outgoing Section2.9.2 Pad-Mounted Transformers2.9.2.1 High-Voltage Compartments2.9.2.2 Load-Break Switch2.9.2.3 Transformer Tank Sections2.9.2.4 Low-Voltage Cable Compartments2.9.2.5 Accessories2.9.3 Busways2.9.4 Pad-Mounted, Metal-Enclosed, Switchgear2.9.4.
8、1 Ratings at 60 Hz shall be:2.9.4.2 Operators, Devices, and Controls2.9.4.3 Enclosures2.9.5 Pad-Mounted Sectionalizers2.9.5.1 Ratings2.9.5.2 Enclosures2.9.6 Cable Terminating Cabinets2.10 METERING AND PROTECTIVE DEVICES2.10.1 Circuit Breakers, Low-Voltage2.10.1.1 Low-Voltage Power Circuit Breakers2.
9、10.1.2 Molded-Case Circuit Breakers2.10.2 Fuses, Medium-Voltage, Including Current-Limiting2.10.2.1 Construction2.10.2.2 Ratings2.10.2.3 E-Rated, Current-Limiting Power Fuses2.10.2.4 C-Rated, Current-Limiting Power Fuses2.10.3 Fuses, Low-Voltage, Including Current-Limiting2.10.3.1 Cartridge Fuses2.1
10、0.3.2 Transformer Circuit Fuses2.10.4 Instrument Transformers2.10.4.1 General2.10.4.2 Current Transformers2.10.4.3 Current Transformers for Power Transformers2.10.4.4 Current Transformers for Metal-Enclosed Switchgear2.10.4.5 Current Transformers for Kwh and Demand Metering (Low-Voltage)2.10.4.6 Vol
11、tage TransformersSECTION 33 70 02.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.10.5 Watthour Meters2.10.6 Protective Relaying2.10.6.1 General2.10.6.2 Construction2.10.6.3 Ratings2.11 SURGE ARRESTERS2.12 GROUNDING AND BONDING2.12.1 Dr
12、iven Ground Rods2.12.2 Grounding Conductors2.13 CONCRETE AND REINFORCEMENT2.14 PADLOCKS2.15 CABLE FIREPROOFING SYSTEMS2.15.1 Fireproof Coating2.15.2 Fireproofing Tape2.15.3 Plastic Tape2.16 LIQUID DIELECTRICS2.17 FACTORY TESTS2.18 FENCING2.19 COORDINATED POWER SYSTEM PROTECTION2.19.1 Scope of Analys
13、es2.19.2 Determination of Facts2.19.3 Single Line Diagram2.19.4 Fault Current Analysis2.19.4.1 Method2.19.4.2 Data2.19.5 Coordination Study2.19.6 Study ReportPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION REQUIREMENTS3.2.1 Conformance to Codes3.2.2 Disposal of Liquid Dielectrics3.3 CABLE AND BUSWAY
14、 INSTALLATION3.3.1 Cable Installation Plan and Procedure3.3.1.1 Cable Inspection3.3.1.2 Duct Cleaning3.3.1.3 Duct Lubrication3.3.1.4 Cable Installation3.3.1.5 Cable Installation Plan3.3.2 Duct Line3.3.3 Direct-Burial3.3.3.1 Trenching3.3.3.2 Cable Burial3.3.3.3 Other Requirements3.3.3.4 Cable Joints
15、or Splices3.3.3.5 Cable Markers3.3.4 Insect and Rodent Damage3.3.5 Electric Manholes3.3.6 Busway Installation3.4 CABLE JOINTS3.5 FIREPROOFING3.5.1 Tape Method3.5.2 Sprayable Method3.6 DUCT LINES3.6.1 Requirements3.6.2 Treatment3.6.3 Concrete EncasementSECTION 33 70 02.00 10 Page 3Provided by IHSNot
16、for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.6.4 Nonencased Direct-Burial3.6.5 Installation of Couplings3.6.5.1 Bituminized-Fiber Ducts3.6.5.2 Plastic Duct3.6.6 Duct Line Markers3.7 MANHOLES, HANDHOLES, AND PULLBOXES3.7.1 General3.7.2 Electric Manholes3.7.3 Commun
17、ications Manholes3.7.4 Handholes3.7.5 Pullboxes3.7.6 Ground Rods3.8 PAD-MOUNTED EQUIPMENT INSTALLATION3.8.1 Concrete Pads3.8.1.1 Construction3.8.1.2 Concrete and Reinforcement3.8.1.3 Sealing3.8.2 Padlocks3.8.3 Fencing3.9 CONNECTIONS BETWEEN AERIAL AND UNDERGROUND SYSTEMS3.10 CONNECTIONS TO BUILDINGS
18、3.11 GROUNDING3.11.1 Grounding Electrodes3.11.2 Grounding and Bonding Connections3.11.3 Grounding and Bonding Conductors3.11.4 Surge Arrester Grounding3.11.5 Manhole, Handhole, or Concrete Pullbox Grounding3.11.6 Metal Splice Case Grounding3.11.7 Riser Pole Grounding3.12 FIELD TESTING3.12.1 General3
19、.12.2 Safety3.12.3 Ground-Resistance Tests3.12.4 Ground-Mat Connection Inspection3.12.5 Medium-Voltage Cable Test3.12.6 Low-Voltage Cable Test3.12.7 Liquid-Filled Transformer Tests3.12.8 Dry-Type Transformer Tests3.12.9 Circuit Breaker Tests3.12.10 Power Circuit Breaker Tests3.12.11 Protective Relay
20、s3.12.12 Pre-Energization Services3.12.13 Operating Tests3.13 MANUFACTURERS FIELD SERVICE3.13.1 Onsite Training3.13.2 Installation Engineer3.14 ACCEPTANCE- End of Section Table of Contents -SECTION 33 70 02.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without lice
21、nse from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 70 02.00 10 (November 2008)-Preparing Activity: USACE SupersedingUFGS-33 70 02.00 10 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 33 70 02.00 10ELECTRICAL DISTRIBUTION SY
22、STEM, UNDERGROUND11/08*NOTE: This guide specification covers the requirements for underground electrical distribution systems.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate i
23、nformation.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS33700200102008ELECTRICALDISTRIBUTIONSYSTEMUNDERGROUND 地下 配电 系统 PDF

链接地址:http://www.mydoc123.com/p-449777.html