1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 61 13 (August 2010)-Preparing Activity: USACE SupersedingUFGS-33 61 13 (April 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 61 13PRE-ENGINEERED UNDER
2、GROUND HEAT DISTRIBUTION SYSTEM08/10PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS1.2.1 Heat Distribution System1.2.2 Direct-Buried1.2.3 UHDS Types1.2.3.1 Drainable-Dryable-Testable (DDT) Direct-Buried1.2.3.2 Water Spread Limiting (WSL) Direct-Buried1.2.3.3 Water Spread Limiting Poured-In-Place Insulat
3、ion (PIPI)1.3 SYSTEM DESCRIPTION1.3.1 Scope1.3.2 UHDS Design1.3.3 Cathodic Protection1.3.4 Operating Characteristics1.3.5 Rated Characteristics1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Manufacturer1.5.2 Manufacturers Representative1.5.3 Corrosion Engineer1.5.4 Testing Firm1.5.5 Contract drawings1.6 D
4、ELIVERY, STORAGE, AND HANDLING1.7 SITE CONDITIONSPART 2 PRODUCTS2.1 STANDARD PRODUCTS2.2 FACTORY FABRICATED, DIRECT-BURIED DDT SYSTEMS2.2.1 DDT Steam and High Temperature Hot Water Carrier Pipes2.2.2 DDT Condensate Carrier Pipes2.2.3 DDT Carrier Pipe Insulation2.2.4 Insulation Banding and Scrim2.2.5
5、 CasingSECTION 33 61 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.6 Casing End Plates, Vents, and Drains2.2.7 Air Space2.2.8 Casing Coating2.2.8.1 Fusion-Bonded Epoxy2.2.8.2 Urethane Elastomer2.2.9 Coating of End Plates and Conduit Ex
6、tending into Manholes2.2.10 Carrier Pipe Guides2.2.11 Anchor Plates2.2.12 Field Connection of Casing Sections2.2.13 Manufacturers Identification2.3 FACTORY FABRICATED, DIRECT-BURIED WSL SYSTEM2.3.1 WSL Steam and Carrier Pipes2.3.2 WSL Condensate Carrier Pipes2.3.3 Casing for Steam and Condensate2.3.
7、4 Pipe Coupling, Steam2.3.5 Pipe Coupling, Condensate2.3.6 WSL Carrier Pipe Insulation2.3.6.1 Calcium Silicate for Steam Systems2.3.6.2 Polyurethane Foam for Steam and Condensate Systems2.3.6.3 Insulation Concentricity2.3.6.4 Insulated Fittings2.3.6.5 Coupling Insulation for Steam Systems2.3.6.6 Cou
8、pling Insulation for Condensate2.3.7 Manufacturers Identification2.3.8 End Seals2.3.8.1 End Seals for Steam Service2.3.8.2 End Seals for Condensate Return Service2.3.9 Test of WSL Systems for Steam Service2.3.9.1 Apparatus2.3.9.2 Test Section2.3.9.3 Resistance to Water Damage and Joint Leakage2.3.9.
9、4 Resistance to Mechanical or Structural Damage2.3.9.5 Resistance to Ground Water Infiltration2.3.9.6 Criteria for Satisfactory Results and Reporting2.3.10 Test of WSL Systems for Condensate Return Service2.4 WATER SPREAD LIMITING POURED-IN-PLACE INSULATION (PIPI) SYSTEM2.4.1 PIPI Steam and High Tem
10、perature Hot Water Carrier Pipes2.4.2 PIPI Condensate Carrier Pipes2.4.3 PIPI Carrier Pipe Insulation2.4.4 Poured-in-Place Insulation - Physical Properties2.4.5 Poured-in-Place Insulation - Thermal Properties2.4.6 Poured-in-Place Insulation - Electrical Properties2.4.7 PIPI System Piping Anchors, Su
11、pports, and Guides2.4.8 PIPI Envelope Penetrations2.5 PIPE INSULATION TYPE AND MINIMUM THICKNESS2.6 HEAT DISTRIBUTION PIPING2.6.1 Steam and High Temperature Hot Water Pipe2.6.1.1 Condensate Pipe2.6.1.2 Joints2.6.2 Fittings2.6.2.1 Butt-Welded2.6.2.2 Socket-Welded2.7 EXPANSION LOOPS AND BENDSPART 3 EX
12、ECUTION3.1 PREPARATION3.1.1 Job Conditions3.1.2 Interruption of Existing ServiceSECTION 33 61 13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1.3 Grading3.1.4 Connecting to Existing Work3.1.5 Coordination3.1.6 Variations3.2 DEMOLITION3.2.1
13、 Demolition Procedures3.2.2 Asbestos Removal3.3 PIPE, PIPING JOINTS AND FITTINGS3.3.1 Joint Preparation3.3.2 Direction Changes3.4 WELDING3.4.1 Qualification of Welders3.4.2 Examining Welders3.4.3 Examination Results3.4.4 Beveling3.4.5 Alignment3.4.6 Erection3.4.7 Defective Welds3.4.8 Electrodes3.4.9
14、 Radiographic Testing3.5 HEAT DISTRIBUTION SYSTEM INSTALLATION3.5.1 Verification of Final Elevations3.5.2 Excavation, Trenching, and Backfilling3.5.3 UHDS Manufacturers Representative Responsibilities3.5.4 UHDS Manufacturers Representative Reports3.5.5 Protection3.5.6 Defective Material3.5.7 Cathodi
15、c Protection Installation3.6 TESTS3.6.1 Holiday Testing of Direct-buried System Steel Casings3.6.2 Pneumatic, Hydrostatic and Operational Tests3.6.2.1 Pneumatic Test3.6.2.2 Hydrostatic Test3.6.2.3 Operational Test3.6.3 Deficiencies3.7 VALVE MANHOLES3.8 BURIED UTILITY WARNING AND IDENTIFICATION3.8.1
16、Plastic Marking Tape3.8.2 Markers for Underground Piping3.9 THERMAL PERFORMANCE TESTING3.9.1 Equipment3.9.1.1 Casing Temperature Measurement3.9.1.2 Carrier Pipe Temperature Measurement3.9.1.3 Terminals3.9.2 Thermal Performance Test- End of Section Table of Contents -SECTION 33 61 13 Page 3Provided b
17、y IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 61 13 (August 2010)-Preparing Activity: USACE SupersedingUFGS-33 61 13 (April 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2
18、010*SECTION 33 61 13PRE-ENGINEERED UNDERGROUND HEAT DISTRIBUTION SYSTEM08/10*NOTE: This guide specification covers the requirements for an insulated underground heat distribution system (UHDS) and/or condensate return system of the pre-engineered type as covered in TM-5-810-17 “Heating and Cooling D
19、istribution Systems“, for steam and high temperature hot water up to 230 degrees C (450 degrees F).Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove informati
20、on and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designa
21、tion and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Notes are to the Government designer or design Architect/Engineer firm and will not be seen by the Contractor or its subContractors. The designer w
22、ill carefully review all Notes; when submitting the “draft“ specification for review, Notes will remain intact.This specification requires coordination with other design disciplines (examples: cathodic protection, SECTION 33 61 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking perm
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3361132010PREENGINEEREDUNDERGROUNDHEATDISTRIBUTIONSYSTEMPDF

链接地址:http://www.mydoc123.com/p-449776.html