1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 61 00 (April 2008)-Preparing Activity: USACE SupersedingUFGS-33 61 00 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 61 00PREFABRICATED UNDERGR
2、OUND HEATING/COOLING DISTRIBUTION SYSTEM04/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.5 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 STANDARD PRODUCTS2.2 PIPING AND CASING MATERIALS2.2.1 General2.2.2 Piping2.2.2.1 Steel Pipe2.2.2.2 Copper Tubing2.2.
3、2.3 Reinforced Thermosetting Resin Pipe (RTRP)2.2.2.4 Polyvinyl Chloride (PVC) Pipe2.2.2.5 Joints and Fittings for Copper Tubing2.2.3 Casings2.2.3.1 Polyvinyl Chloride (PVC) Casing2.2.3.2 Polyethylene (PE) Casing2.2.3.3 Reinforced Thermosetting Resin Pipe (RTRP) Casing2.3 PIPING CONNECTIONS2.3.1 Ste
4、el Pipe2.3.2 Copper Pipe2.3.3 Plastic Pipe2.3.3.1 General2.3.3.2 Polyvinyl Chloride (PVC)2.3.3.3 Reinforced Thermosetting Resin Plastic (RTRP)2.4 END SEALS2.4.1 General2.4.2 Types2.4.3 Casing and End Seal Testing and Certification2.5 INSULATION2.5.1 Factory Applied InsulationSECTION 33 61 00 Page 1P
5、rovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.5.2 Field Applied Insulation2.6 CONCRETE VALVE MANHOLES2.7 PIPING AND EQUIPMENT IN VALVE MANHOLES2.8 TREATED WATERPART 3 EXECUTION3.1 EXAMINATION3.2 INSTALLATION3.3 PIPING SYSTEMS3.3.1 Buried Insulated
6、 Systems3.3.2 Buried Uninsulated Systems3.4 VALVE MANHOLES AND PIPING EQUIPMENT IN VALVE MANHOLES3.5 THRUST BLOCKS3.6 INSTALLATION OF PIPING SYSTEMS3.6.1 Pitching of Horizontal Piping3.6.2 Open Ends3.6.3 Cutting Prefabricated Piping Sections3.6.4 Joints3.6.4.1 Welded Joints3.6.4.2 Threaded Joints3.6
7、.4.3 Grooved Mechanical Joints3.6.4.4 Brazed Joints3.6.4.5 Nonmetallic Pipe Joints3.6.5 Expansion Loops3.6.6 Anchors3.6.7 Field Casing Closures3.6.8 Underground Warning Tape3.6.9 Markers for Underground Piping3.7 EARTHWORK3.8 ELECTRICAL WORK3.9 TESTING3.9.1 Metallic Pipe Welds3.9.2 Carrier Pipe Clea
8、ning and Testing3.9.2.1 Cleaning Carrier Pipe3.9.2.2 Hydrostatic Pressure Cycling and Tests3.9.2.3 Operational Test3.9.2.4 Final Hydrostatic Test- End of Section Table of Contents -SECTION 33 61 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-
9、,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 61 00 (April 2008)-Preparing Activity: USACE SupersedingUFGS-33 61 00 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION 33 61 00PREFABRICATED UNDERGROUND HEATING/COOLING DISTRIBUTION SYSTEM04/08*
10、NOTE: This guide specification covers the requirements for prefabricated underground distribution system for chilled water, low temperature hot water (less than 95 degrees C (200 degrees F) or dual temperature water.Edit this guide specification for project specific requirements by adding, deleting,
11、 or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to
12、the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Provide one or two sump pumps
13、in valve manholes. Units should discharge by buried piping to the nearest storm sewer if possible. Where not economical to discharge to a storm sewer, pumps are to discharge above grade. Plan discharge locations carefully so water will not be discharged over valve manhole tops, sidewalks, etc. Check
14、 available NPSH versus required NPSH for pump selected. Coordinate power requirements with electrical designer and provide tell-tale light above ground to indicate sump pump failure. Drawing will show the following:SECTION 33 61 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking per
15、mitted without license from IHS-,-,-(a) a dedicated circuit(b) lockable switches and circuit breakers that can both be locked “ON“(c) permanent labels at key positions indicated on the drawings so that personnel can understand that the circuit should be left “ON“.The label shall be on a corrosion re
16、sistant metal plate and shall read as follows: “THIS CIRCUIT SUPPLIES POWER TO THE ELECTRIC SUMP PUMPS IN THE UNDERGROUND HEAT DISTRIBUTION SYSTEM. THIS CIRCUIT MUST BE “ON“ AT ALL TIMES, OTHERWISE EXTENSIVE DAMAGE WILL OCCUR TO THE UNDERGROUND HEAT DISTRIBUTION SYSTEM AND PREMATURE FAILURE WILL OCC
17、UR“.Where plastic chilled water piping is interconnected with heating system changeover valves, ensure that design includes means to preclude damage to plastic chilled water piping. This can be accomplished either by using changeover valves that ensure tight shut-off or by using enough metal piping
18、on chilled water side of changeover valve to prevent damage to plastic chilled water piping.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this pa
19、ragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the iss
20、ue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are r
21、eferred to within the text by the basic designation only.AMERICAN WATER WORKS ASSOCIATION (AWWA)AWWA C606 (2006) Grooved and Shouldered JointsSECTION 33 61 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASME INTERNATIONAL (ASME)ASME B1.20.1
22、 (1983; R 2006) Pipe Threads, General Purpose (Inch)ASME B16.11 (2005) Forged Fittings, Socket-Welding and ThreadedASME B16.18 (2001; R 2005) Cast Copper Alloy Solder Joint Pressure FittingsASME B16.22 (2001; R 2005) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure FittingsASME B16
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3361002008PREFABRICATEDUNDERGROUNDHEATINGCOOLINGDISTRIBUTIONSYSTEM 预制 地下 供热 供冷输配 系统 PDF

链接地址:http://www.mydoc123.com/p-449775.html