1、*USACE / NAVFAC / AFCESA / NASA UFGS-21 30 00 (April 2008)-Preparing Activity: USACE SupersedingUFGS-21 30 00 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 21 - FIRE SUPPRESSIONSECTION 21 30 00FIRE PUMPS0
2、4/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Fire Protection Specialist1.4.2 Qualifications of Welders1.4.3 Qualifications of Installer1.4.4 Preliminary Test Certification1.4.5 Manufacturers Representative1.5 DELIVERY, STORAGE, AND HANDLING1.6 SEQUEN
3、CING1.6.1 Primary Fire Pump1.6.2 Secondary Fire Pump1.6.3 Pressure Maintenance Pump1.7 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.2 FIRE PUMP2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE2.3.1 General Requirements2.3.2 Alarms2.4 UNDERGROUND PIPING COMPONENTS2.4.1 Pipe and Fittings2.4.2
4、 Fittings and Gaskets2.4.3 Valves and Valve Boxes2.4.4 Gate Valve and Indicator Posts2.4.5 Buried Utility Warning and Identification Tape2.5 ABOVEGROUND PIPING COMPONENTS2.5.1 Pipe Sizes 65 mm 2.5 inches and Larger2.5.1.1 Pipe2.5.1.2 Grooved Mechanical Joints and Fittings2.5.1.3 FlangesSECTION 21 30
5、 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.5.1.4 Gaskets2.5.1.5 Bolts2.5.1.6 Nuts2.5.1.7 Washers2.5.2 Piping Sizes 50 mm 2 inches and Smaller2.5.2.1 Steel Pipe2.5.2.2 Copper Tubing2.5.3 Pipe Hangers and Supports2.5.4 Valves2.5.4.1 Ga
6、te Valves and Control Valves2.5.4.2 Tamper Switch2.5.4.3 Check Valve2.5.4.4 Relief Valve2.5.4.5 Circulating Relief Valve2.5.4.6 Suction Pressure Regulating Valve2.5.5 Hose Valve Manifold Test Header2.5.6 Pipe Sleeves2.5.7 Escutcheon Plates2.6 DISINFECTING MATERIALS2.6.1 Liquid Chlorine2.6.2 Hypochlo
7、rites2.7 ELECTRIC MOTOR DRIVER2.8 DIESEL ENGINE DRIVER2.8.1 Engine Capacity2.8.2 Exhaust System External to Engine2.8.2.1 Steel Pipe and Fittings2.8.2.2 Flanges2.8.2.3 Piping Insulation2.9 FIRE PUMP CONTROLLER2.9.1 Controller for Electric Motor Driven Fire Pump2.9.2 Controller for Diesel Engine Driv
8、en Fire Pump2.10 BATTERIES2.11 PRESSURE SENSING LINE2.12 PRESSURE MAINTENANCE PUMP2.12.1 General2.12.2 Pressure Maintenance Pump Controller2.13 DIESEL FUEL SYSTEM EXTERNAL TO ENGINE2.13.1 Steel pipe2.13.2 Copper Tubing2.13.3 Diesel Fuel Tanks2.13.4 Valves2.14 JOINTS AND FITTINGS FOR COPPER TUBE2.15
9、PUMP BASE PLATE AND PAD2.16 HOSE VALVE MANIFOLD TEST HEADER2.17 FLOW METERPART 3 EXECUTION3.1 EXAMINATION3.2 FIRE PUMP INSTALLATION RELATED SUBMITTALS3.3 INSPECTION BY FIRE PROTECTION SPECIALIST3.4 INSTALLATION REQUIREMENTS3.5 PIPE AND FITTINGS3.5.1 Cleaning of Piping3.5.2 Threaded Connections3.5.3
10、Pipe Hangers and Supports3.5.3.1 Vertical Piping3.5.3.2 Horizontal Piping3.5.4 Underground PipingSECTION 21 30 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.5.5 Grooved Mechanical Joint3.6 ELECTRICAL WORK3.7 PIPE COLOR CODE MARKING3.8 FL
11、USHING3.9 FIELD TESTS3.9.1 Hydrostatic Test3.9.2 Preliminary Tests3.9.3 Navy Formal Inspection and Tests3.9.3.1 Full Water Flow Test3.9.3.2 Correcting Defects3.9.3.3 Documentation of Test3.9.4 Army Final Acceptance Test3.9.4.1 Flow Tests3.9.4.2 Starting Tests3.9.4.3 Battery Changeover3.9.4.4 Alarms3
12、.9.4.5 Miscellaneous3.9.4.6 Alternate Power Source3.9.4.7 Correction of Deficiencies3.9.4.8 Test Documentation3.9.5 Test Equipment3.9.6 As-Built Drawings3.10 DISINFECTION3.10.1 Chlorination3.10.2 Flushing3.10.3 Sample Testing3.11 FIELD TRAINING- End of Section Table of Contents -SECTION 21 30 00 Pag
13、e 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-21 30 00 (April 2008)-Preparing Activity: USACE SupersedingUFGS-21 30 00 (January 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMR
14、L dated March 2008*SECTION 21 30 00FIRE PUMPS04/08*Note: This guide specification covers the requirements for fire pumps.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate inform
15、ation.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including thei
16、r organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Combustion engine drive must be provided, unless electric power is provided from two separate sources. Dual drive pumps are n
17、ot permitted. The primary design references for fire pump installations are NFPA 20 Installation of Centrifugal Fire Pumps, Unified Facilities Criteria (UFC) 3-600-01 Design: Fire Protection Engineering for Facilities and Military Handbook 1008C.The Designer will coordinate this specification sectio
18、n with any applicable contract sprinkler system. The designer will provide a fully designed fire pump installation in all instances, including projects where the sprinkler system will be performance designed. The following information SECTION 21 30 00 Page 4Provided by IHSNot for ResaleNo reproducti
19、on or networking permitted without license from IHS-,-,-will be included in the contract documents as the basis for any installation:(1) All piping, valves, pipe hangers, and equipment including sizes will be indicated.(2) Freeze protection and ventilation for the pump room or pump house.(3) Where a
20、 pump has a diesel-engine-driver, the pump room or pump house will be protected by automatic sprinklers.(4) The location of either the double-check valve or the reduced-pressure-principle backflow preventer where the potable water supply system is at risk of contamination by the fire pump(s). If req
21、uired, backflow preventers will be installed on the discharge side of the pump.(5) The sequence of operation for the pressure maintenance pump, the primary fire pump, and the secondary fire pump.(6) An equipment schedule for the pressure maintenance pump, the primary fire pump, and the secondary fir
22、e pump that includes all pertinent information for the pumps and their respective drivers.(7) Waterflow data including hydraulic flow graph and the location where the hydrant flow test was conducted, the location and size of existing mains and new water supply lines that will serve the fire pump(s)
23、(including all supervisory valves), and the location and size of all risers.(8) Other design considerations: Horizontal fire pumps will be provided only under a positive head and will not be used where a static suction or lift may be involved.Vertical shaft pumps should take suction from a reliable
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS2130002008FIREPUMPS 消防泵 PDF