1、*USACE / NAVFAC / AFCESA / NASA UFGS-21 13 18.00 10 (May 2009)-Preparing Activity: USACE SupersedingUFGS-21 13 18.00 10 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION TABLE OF CONTENTSDIVISION 21 - FIRE SUPPRESSIONSECTION 21 13 18
2、.00 10PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION05/09PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Hydraulic Design1.2.1.1 Hose Demand1.2.1.2 Basis for Calculations1.2.2 Sprinkler Coverage1.2.3 Control System1.2.3.1 Power Supply1.2.3.2 Circuit Requirements1.2.4 System Operatio
3、nal Features1.2.4.1 System Actuation1.2.4.2 Alarm Functions1.2.4.3 Supervisory Functions1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Fire Protection Specialist1.4.2 Installer Qualifications1.4.3 Shop Drawings1.5 DELIVERY, STORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 STANDARD PRODUCTS2.2 NA
4、MEPLATES2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE2.4 UNDERGROUND PIPING SYSTEMS2.4.1 Pipe2.4.2 Fittings and Gaskets2.4.3 Gate Valve and Indicator Posts2.5 ABOVEGROUND PIPING COMPONENTS2.5.1 Steel Pipe2.5.2 Fittings for Non-Grooved Steel Pipe2.5.3 Grooved Mechanical Joints and FittingsSECTION 21 1
5、3 18.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.5.4 Flanges2.5.4.1 Bolts2.5.4.2 Nuts2.5.4.3 Washers2.5.5 Pipe Hangers2.5.6 Valves2.5.6.1 Control Valve and Gate Valve2.5.6.2 Check Valves2.6 AUTOMATIC WATER CONTROL VALVE (DELUGE VALV
6、E)2.7 SUPERVISORY AIR SYSTEM2.7.1 Air Compressor2.7.2 Air Pressure Maintenance Device2.7.3 Air Supply Piping System2.7.4 Low Air Pressure Switch2.8 WATER MOTOR ALARM ASSEMBLY2.9 FIRE DEPARTMENT CONNECTION2.10 SPRINKLERS2.10.1 Pendent Sprinkler2.10.2 Upright Sprinkler2.10.3 Corrosion Resistant Sprink
7、ler2.11 DISINFECTING MATERIALS2.11.1 Liquid Chlorine2.11.2 Hypochlorites2.12 ACCESSORIES2.12.1 Sprinkler Cabinet2.12.2 Pendent Sprinkler Escutcheon2.12.3 Pipe Escutcheon2.12.4 Sprinkler Guard2.12.5 Identification Sign2.13 DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLY2.14 CONTROL PANEL2.14.1 Zone A
8、nnunciator2.14.2 System Zoning2.14.3 Primary Power Supply2.14.4 Emergency Power Supply2.14.4.1 Storage Batteries2.14.4.2 Battery Charger2.15 ALARM INITIATING DEVICES2.15.1 Heat Detectors2.15.1.1 Rate Compensation Detector2.15.1.2 Fixed-Temperature and Rate-of-Rise Heat Detector2.15.1.3 Fixed-Tempera
9、ture Heat Detector2.15.2 Manual Actuation Station2.15.3 Sprinkler Pressure Alarm Switch2.15.4 Waterflow Alarm2.15.5 Valve Supervisory (Tamper) Switch2.16 NOTIFICATION APPLIANCES2.16.1 Alarm Bell2.16.2 Alarm Horn2.17 WIRINGPART 3 EXECUTION3.1 EXAMINATION3.2 EARTHWORK3.3 INSTALLATION REQUIREMENTS3.4 I
10、NSPECTION BY FIRE PROTECTION SPECIALIST3.5 ABOVEGROUND PIPING INSTALLATION3.5.1 Protection of Piping Against Earthquake DamageSECTION 21 13 18.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.5.2 Piping in Exposed Areas3.5.3 Piping in Fi
11、nished Areas3.5.4 Pendent Sprinklers Locations3.5.5 Upright Sprinklers3.5.6 Pendent Sprinklers Locations3.5.7 Pipe Joints3.5.8 Reducers3.5.9 Pipe Penetrations3.5.10 Escutcheons3.5.11 Inspectors Test Connection3.5.12 Drains3.5.13 Installation of Fire Department Connection3.5.14 Identification Signs3.
12、6 UNDERGROUND PIPING INSTALLATION3.7 ELECTRICAL WORK3.7.1 Overcurrent and Surge Protection3.7.2 Grounding3.7.3 Wiring3.7.4 Control Panel3.7.5 Detectors3.7.6 Manual Actuation Stations3.7.7 Notification Appliances3.8 DISINFECTION3.9 PIPE COLOR CODE MARKING3.10 PRELIMINARY TESTS3.10.1 Underground Pipin
13、g3.10.2 Hydrostatic Testing3.10.3 Aboveground Piping3.10.3.1 Hydrostatic Testing3.10.3.2 Air Pressure Test3.10.3.3 Backflow Prevention Assembly Forward Flow Test3.10.4 Detection and Control System Tests3.10.5 Automatic Water Control Valve Test3.11 FINAL ACCEPTANCE TESTS3.11.1 Control System Test3.11
14、.2 Trip-tests of Automatic Water Control Valves3.11.3 Tests of Supervisory Air System3.12 ONSITE TRAINING- End of Section Table of Contents -SECTION 21 13 18.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA
15、UFGS-21 13 18.00 10 (May 2009)-Preparing Activity: USACE SupersedingUFGS-21 13 18.00 10 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION 21 13 18.00 10PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION05/09*NOTE: This guide spe
16、cification covers the requirements for preaction and deluge fire protection sprinkler systems.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information an
17、d requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation
18、and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Because preaction systems are more costly, less reliable, and require more maintenance than wet-pipe systems, they should be used only where justified b
19、y occupancy conditions. Deluge systems are “open head“ systems which discharge all sprinklers upon system actuation. The use of deluge systems should be limited to special hazard situations.The Designer will edit this specification section for either a performance-designed system or a fully designed
20、 system as applicable.This specification section is primarily intended for SECTION 21 13 18.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-performance designed systems, i.e. systems where the size, layout, and support of branch lines and
21、 cross mains, and the layout of sprinkler heads will be designed by the Contractor.The Designer will provide the following information in the contract documents for performance designed systems. This information will be in accordance with Military Handbook 1008C.(1) Show the layout and size of all p
22、iping and equipment from the point of connection to the water supply, to the sprinkler cross mains. The contract drawings must include a detailed sprinkler riser diagram. Water velocity in the piping should not exceed 6 m/s (20 ft/s).(2) Show location and size of service mains, interior feed mains,
23、control valves, sprinkler risers, drain lines, sectional valves, and inspectors test valves and switches on the drawings.(3) Specify waterflow data including hydrant flow results, including the location where the hydrant flow test was conducted, the location and size of existing mains and new water
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS21131800102009PREACTIONANDDELUGESPRINKLERSYSTEMSFIREPROTECTION 消防 预作 玉林 喷水 灭火 系统 PDF

链接地址:http://www.mydoc123.com/p-449636.html