1、*USACE / NAVFAC / AFCESA / NASA UFGS-21 13 17.00 10 (May 2009)-Preparing Activity: USACE SupersedingUFGS-21 13 17.00 10 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION TABLE OF CONTENTSDIVISION 21 - FIRE SUPPRESSIONSECTION 21 13 17
2、.00 10DRY PIPE SPRINKLER SYSTEM, FIRE PROTECTION05/09PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Hydraulic Design1.2.1.1 Hose Demand1.2.1.2 Basis for Calculations1.2.2 Sprinkler Coverage1.2.3 System Volume Limitations1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Fire Protection Specialist1.4.
3、2 Installer Qualifications1.4.3 Shop Drawings1.5 DELIVERY, STORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 STANDARD PRODUCTS2.2 NAMEPLATES2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE2.4 UNDERGROUND PIPING COMPONENTS2.4.1 Pipe2.4.2 Fittings and Gaskets2.4.3 Gate Valve and Indicator Post2.5
4、 ABOVEGROUND PIPING COMPONENTS2.5.1 Steel Pipe2.5.2 Fittings for Non-Grooved Steel Pipe2.5.3 Grooved Mechanical Joints and Fittings2.5.4 Flanges2.5.4.1 Bolts2.5.4.2 Nuts2.5.4.3 Washers2.5.5 Pipe Hangers2.5.6 ValvesSECTION 21 13 17.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networkin
5、g permitted without license from IHS-,-,-2.5.6.1 Control Valve and Gate Valve2.5.6.2 Check Valve2.6 DRY PIPE VALVE ASSEMBLY2.7 SUPERVISORY AIR SYSTEM2.7.1 Air Compressor2.7.2 Air Pressure Maintenance Device2.7.3 Air Supply Piping System2.7.4 Low Air Pressure Alarm Device2.8 WATERFLOW ALARM2.9 ALARM
6、INITIATING AND SUPERVISORY DEVICES2.9.1 Sprinkler Pressure (Waterflow) Alarm Switch2.9.2 Low Air Pressure Supervisory Switch2.9.3 Valve Supervisory (Tamper) Switch2.10 FIRE DEPARTMENT CONNECTION2.11 SPRINKLERS2.11.1 Pendent Sprinkler2.11.2 Upright Sprinkler2.11.3 Corrosion Resistant Sprinkler2.12 DI
7、SINFECTING MATERIALS2.12.1 Liquid Chlorine2.12.2 Hypochlorites2.13 ACCESSORIES2.13.1 Sprinkler Cabinet2.13.2 Pendent Sprinkler Escutcheon2.13.3 Pipe Escutcheon2.13.4 Sprinkler Guard2.13.5 Identification Sign2.14 DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLYPART 3 EXECUTION3.1 EXAMINATION3.2 EARTHW
8、ORK3.3 INSTALLATION REQUIREMENTS3.4 INSPECTION BY FIRE PROTECTION SPECIALIST3.5 ABOVEGROUND PIPING INSTALLATION3.5.1 Protection of Piping Against Earthquake Damage3.5.2 Piping in Exposed Areas3.5.3 Piping in Finished Areas3.5.4 Pendent Sprinklers Locations3.5.5 Upright Sprinklers3.5.6 Pipe Joints3.5
9、.7 Reducers3.5.8 Pipe Penetrations3.5.9 Escutcheons3.5.10 Inspectors Test Connection3.5.11 Drains3.5.12 Installation of Fire Department Connection3.5.13 Identification Signs3.6 UNDERGROUND PIPING INSTALLATION3.7 ELECTRICAL WORK3.8 DISINFECTION3.9 PIPE COLOR CODE MARKING3.10 PRELIMINARY TESTS3.10.1 U
10、nderground Piping3.10.1.1 Flushing3.10.1.2 Hydrostatic Testing3.10.2 Aboveground Piping3.10.2.1 Hydrostatic TestingSECTION 21 13 17.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.10.2.2 Air Pressure Test3.10.2.3 Backflow Prevention Ass
11、embly Forward Flow Test3.10.3 Testing of Alarm Devices3.10.4 Trip Tests of Dry Pipe Valves3.10.5 Main Drain Flow Test3.11 FINAL ACCEPTANCE TEST3.12 ONSITE TRAINING- End of Section Table of Contents -SECTION 21 13 17.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted wit
12、hout license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-21 13 17.00 10 (May 2009)-Preparing Activity: USACE SupersedingUFGS-21 13 17.00 10 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION 21 13 17.00 10DRY PIPE SPRINKLER SYST
13、EM, FIRE PROTECTION05/09*NOTE: This guide specification covers the requirements for dry pipe fire protection sprinkler systems.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate
14、information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, includin
15、g their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Because dry systems are slower in operation, are less reliable, and require considerable and critical maintenance, they
16、 should be limited in application and used only in areas subject to freezing. Areas that are not subject to freezing should be protected with wet pipe sprinkler systems.The Designer will edit this specification section for either a performance-designed system or a fully designed system as applicable
17、.This specification section is primarily intended for performance designed systems, i.e. systems where the size, layout, and support of branch lines and cross SECTION 21 13 17.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-mains, and the
18、 layout of sprinkler heads will be designed by the Contractor.The Designer will provide the following information in the contract documents for performance designed systems. This information will be in accordance with Military Handbook 1008C.(1) Show the layout and size of all piping and equipment f
19、rom the point of connection to the water supply, to the sprinkler cross mains. The contract drawings must include a detailed sprinkler riser diagram. Water velocity in the piping should not exceed 6 m/s (20 ft/s).(2) Show location and size of service mains, interior feed mains, control valves, sprin
20、kler risers, drain lines, sectional valves, and inspectors test valves and switches on the drawings.(3) Specify waterflow data including hydrant flow results, including the location where the hydrant flow test was conducted, the location and size of existing mains and new water supply lines that wil
21、l serve the sprinkler system (including all supervisory valves), and the location and size of all risers.(4) Highlight or clearly indicate the area(s) to be protected by sprinklers on the drawings.(5) Specify waterflow requirements including the design density, design area, the hose stream demand (i
22、ncluding location of the hose stream demand), the duration of supply, and sprinkler spacing and area of coverage in this section.(6) Show the location of the backflow preventer (including provisions for a drain and access for maintenance) where the potable water supply system is at risk of contamina
23、tion by the sprinkler system on the drawings.(7) Show all provisions necessary for forward flow testing of the backflow preventer at system demand as required by NFPA 13 on the drawings. Indicate location of all components and required items including test ports for pressure measurements both upstre
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS21131700102009DRYPIPESPRINKLERSYSTEMFIREPROTECTION 消防 用干式 喷水 灭火 系统 PDF

链接地址:http://www.mydoc123.com/p-449635.html