ARMY UFGS-21 13 13 00 10-2009 WET PIPE SPRINKLER SYSTEM FIRE PROTECTION《消防用湿式喷水灭火系统》.pdf
《ARMY UFGS-21 13 13 00 10-2009 WET PIPE SPRINKLER SYSTEM FIRE PROTECTION《消防用湿式喷水灭火系统》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-21 13 13 00 10-2009 WET PIPE SPRINKLER SYSTEM FIRE PROTECTION《消防用湿式喷水灭火系统》.pdf(32页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-21 13 13.00 10 (May 2009)-Preparing Activity: USACE SupersedingUFGS-21 13 13.00 10 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION TABLE OF CONTENTSDIVISION 21 - FIRE SUPPRESSIONSECTION 21 13 13.
2、00 10WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION05/09PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Hydraulic Design1.2.1.1 Hose Demand1.2.1.2 Basis for Calculations1.2.1.3 Hydraulic Calculations1.2.2 Sprinkler Coverage1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Fire Protection Specialist1.4.2
3、Sprinkler System Installer1.4.3 Shop Drawings1.5 DELIVERY, STORAGE, AND HANDLING1.6 EXTRA MATERIALSPART 2 PRODUCTS2.1 STANDARD PRODUCTS2.2 NAMEPLATES2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE2.4 UNDERGROUND PIPING COMPONENTS2.4.1 Pipe2.4.2 Fittings and Gaskets2.4.3 Gate Valve and Indicator Posts2.
4、5 ABOVEGROUND PIPING COMPONENTS2.5.1 Steel Piping Components2.5.1.1 Steel Pipe2.5.1.2 Fittings for Non-Grooved Steel Pipe2.5.1.3 Grooved Mechanical Joints and Fittings2.5.1.4 Flanges2.5.1.5 Bolts, Nut, and Washers2.5.2 Copper Tube Components2.5.2.1 Copper Tube2.5.2.2 Copper Fittings and JointsSECTIO
5、N 21 13 13.00 10 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.5.3 Plastic Piping Components2.5.3.1 Plastic Pipe2.5.3.2 Plastic Fittings2.5.4 Pipe Hangers2.5.5 Valves2.5.5.1 Control Valve and Gate Valve2.5.5.2 Check Valve2.5.5.3 Hose Valve2
6、.6 ALARM CHECK VALVE ASSEMBLY2.7 WATERFLOW ALARM2.8 ALARM INITIATING AND SUPERVISORY DEVICES2.8.1 Sprinkler Waterflow Indicator Switch, Vane Type2.8.2 Sprinkler Pressure (Waterflow) Alarm Switch2.8.3 Valve Supervisory (Tamper) Switch2.9 FIRE DEPARTMENT CONNECTION2.10 SPRINKLERS2.10.1 Concealed Sprin
7、kler2.10.2 Recessed Sprinkler2.10.3 Flush Sprinkler2.10.4 Pendent Sprinkler2.10.5 Upright Sprinkler2.10.6 Sidewall Sprinkler2.10.7 Residential Sprinkler2.10.8 Intermediate Level Rack Sprinkler2.10.9 Corrosion Resistant Sprinkler2.10.10 Dry Sprinkler Assembly2.11 DISINFECTING MATERIALS2.11.1 Liquid C
8、hlorine2.11.2 Hypochlorites2.12 ACCESSORIES2.12.1 Sprinkler Cabinet2.12.2 Pendent Sprinkler Escutcheon2.12.3 Pipe Escutcheon2.12.4 Sprinkler Guard2.12.5 Identification Sign2.13 FIRE HOSE REEL ASSEMBLY2.14 DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLYPART 3 EXECUTION3.1 FIELD MEASUREMENTS3.2 INSTAL
9、LATION REQUIREMENTS3.3 INSPECTION BY FIRE PROTECTION SPECIALIST3.4 ABOVEGROUND PIPING INSTALLATION3.4.1 Protection of Piping Against Earthquake Damage3.4.2 Piping in Exposed Areas3.4.3 Piping in Finished Areas3.4.4 Pendent Sprinklers3.4.5 Upright Sprinklers3.4.6 Pipe Joints3.4.7 Reducers3.4.8 Pipe P
10、enetrations3.4.9 Escutcheons3.4.10 Inspectors Test Connection3.4.11 Drains3.4.12 Installation of Fire Department Connection3.4.13 Identification Signs3.5 UNDERGROUND PIPING INSTALLATION3.6 EARTHWORKSECTION 21 13 13.00 10 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted with
11、out license from IHS-,-,-3.7 ELECTRICAL WORK3.8 DISINFECTION3.9 PIPE COLOR CODE MARKING3.10 PRELIMINARY TESTS3.10.1 Underground Piping3.10.1.1 Flushing3.10.1.2 Hydrostatic Testing3.10.2 Aboveground Piping3.10.2.1 Hydrostatic Testing3.10.2.2 Backflow Prevention Assembly Forward Flow Test3.10.3 Testin
12、g of Alarm Devices3.10.4 Main Drain Flow Test3.11 FINAL ACCEPTANCE TEST3.12 ONSITE TRAINING- End of Section Table of Contents -SECTION 21 13 13.00 10 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-21 13 13.
13、00 10 (May 2009)-Preparing Activity: USACE SupersedingUFGS-21 13 13.00 10 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION 21 13 13.00 10WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION05/09*NOTE: This guide specification covers the requir
14、ements for wet pipe fire protection sprinkler systems.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respectiv
15、e project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet
16、.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: The Designer will edit this section for either a performance-designed system or a fully designed system as applicable.This section is primarily intended for performance designed systems, i.e.,
17、 systems where the size, layout, and support of branch lines and cross mains, and the layout of sprinkler heads will be designed by the Contractor.The Designer will provide the following information in the contract documents for performance designed systems. This information will be in accordance wi
18、th Military Handbook 1008C.SECTION 21 13 13.00 10 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(1) Show the layout and size of all piping and equipment from the point of connection to the water supply, to the sprinkler cross mains. The contr
19、act drawings must include a detailed sprinkler riser diagram. Water velocity in the piping should not exceed 6 m/s (20 ft/s).(2) Show location and size of service mains, interior feed mains, control valves, sprinkler risers, drain lines, sectional valves, and inspectors test valves and switches on t
20、he drawings.(3) Specify waterflow data including hydrant flow results, including the location where the hydrant flow test was conducted, the location and size of existing mains and new water supply lines that will serve the sprinkler system (including all supervisory valves), and the location and si
21、ze of all risers.(4) Highlight or clearly indicate the area(s) to be protected by sprinklers on the drawings.(5) Specify waterflow requirements including the design density, design area, the hose stream demand (including location of the hose stream demand), the duration of supply, and sprinkler spac
22、ing and area of coverage in this section.(6) Show the location of the backflow preventer (including provisions for a drain and access for maintenance) where the potable water supply system is at risk of contamination by the sprinkler system on the drawings.(7) Show all provisions necessary for forwa
23、rd flow testing of the backflow preventer at system demand, as required by NFPA 13 on the drawings. Indicate location of all components and required items, including test ports, for pressure measurements both upstream and downstream of the backflow preventer, a drain to the building exterior, and ap
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS21131300102009WETPIPESPRINKLERSYSTEMFIREPROTECTION 消防 用湿式 喷水 灭火 系统 PDF

链接地址:http://www.mydoc123.com/p-449634.html