ARMY UFGS-14 24 00-2010 HYDRAULIC ELEVATORS.pdf
《ARMY UFGS-14 24 00-2010 HYDRAULIC ELEVATORS.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-14 24 00-2010 HYDRAULIC ELEVATORS.pdf(33页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-14 24 00 (August 2010)-Preparing Activity: USACE SupersedingUFGS-14 24 00 (February 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 14 - CONVEYING EQUIPMENTSECTION 14 24 00HYDRAUL
2、IC ELEVATORS08/10PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.2.1 Miscellaneous Requirements1.2.2 Provisions for Earthquake Protection1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Elevator Specialist1.4.2 Elevator Inspector1.4.3 Welders Qualifications1.4.4 Detail Drawings1.5 SCHEDULING1.6 WARRANTY
3、1.7 MAINTENANCE AND REPAIR ACTION PLAN1.7.1 Maintenance and Diagnostic Tools1.7.2 Keys for Elevator Key SwitchesPART 2 PRODUCTS2.1 PASSENGER ELEVATORS2.1.1 Basic Requirements2.1.2 Cab Enclosures and Door Finishes2.2 FREIGHT ELEVATORS2.2.1 Basic Requirements2.2.2 Cab Enclosures and Door Frame Finishe
4、s2.3 SPECIAL OPERATION AND CONTROL2.3.1 Firefighters Service2.3.2 Smoke Detectors2.3.3 Fire Sprinklers2.3.4 Top-of-Car Operating Device2.3.5 Hoistway Access Switches2.3.6 Independent Service2.3.7 Elevator Operation2.3.7.1 Single, Two-Stop, Automatic Operation2.3.7.2 Selective Collective Automatic Op
5、erationSECTION 14 24 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.3.7.3 Duplex Selective Collective Automatic Operations2.3.7.4 Group Automatic Operation2.3.8 Parking Switch2.3.9 Hospital Emergency Commandeering Service2.4 ELEVATOR DRIV
6、E SYSTEM2.4.1 Hydraulic Pump Unit2.4.1.1 Pump Motor2.4.2 Hydraulic Controls and Equipment2.4.2.1 Hydraulic Control Valve2.4.2.2 Hydraulic Overspeed Safety Valve2.4.2.3 Hydraulic Oil Scavenger Pump2.4.3 Hydraulic Piping and Accessories2.4.3.1 Containment of Hydraulic Oil Supply Line2.4.4 Hydraulic El
7、evator Type2.4.4.1 Cylinder-Plunger (Jack) Unit2.4.5 Cylinder Well System2.4.5.1 Well Casing2.4.5.2 PVC or HDPE Cylinder Liner2.4.5.3 Cylinder Installation2.4.5.4 Pressure Test of PVC Liner/Cylinder Assembly2.4.5.5 Cylinder Liner Water and Oil Sensor System2.4.5.6 Seal Top of Well Casing2.5 CONTROL
8、EQUIPMENT2.5.1 Motor Control Equipment2.5.1.1 Electrical Isolation Protection2.5.2 Logic Control Equipment2.5.2.1 On-Board Diagnostic Panel2.5.2.2 External Port2.5.2.3 Maintenance and Diagnostic Software2.5.2.4 Acceptable Controller Suppliers2.6 OPERATING PANELS, SIGNAL FIXTURES, AND COMMUNICATIONS
9、CABINETS2.6.1 Capacity and Data Plates2.6.2 Car and Hall Buttons2.6.3 Hall Station Door Operating Buttons2.6.4 Passenger Car-Operating Panel2.7 PASSENGER CONTROLS2.7.1 Passenger Car-Operating Panel2.7.1.1 Service Controls2.7.1.2 Certificate Window2.7.2 Freight Car-Operating Panel2.7.2.1 Passenger Co
10、ntrols2.7.2.2 Service Controls2.7.2.3 Certificate Window2.7.3 Semi-Selective Door Operation2.7.4 Full-Selective Door Operation2.7.5 Switches and Devices2.7.6 In-Car Position and Direction Indicator and Signal2.7.6.1 In-Car Position Indicator and Signal2.7.6.2 In-Car Direction Indicator and Signal2.7
11、.7 Landing Position and Direction Indicator and Signal2.7.7.1 Landing Position Indicator and Signal2.7.7.2 Landing Direction Indicator and Signal2.8 HOISTWAY AND CAR EQUIPMENT2.8.1 Guide Rails and Fastenings2.8.2 Car Buffers2.8.3 Pit Equipment2.8.3.1 Pit “STOP“ Switch2.8.3.2 Ladders2.8.3.3 Lighting
12、of PitsSECTION 14 24 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.9 TERMINAL STOPPING DEVICES2.9.1 Wiring and Traveling Cables2.9.2 Emergency Signaling Device2.10 PASSENGER CAR AND HOISTWAY DOOR ACCESSORIES2.11 PASSENGER ELEVATOR GUIDES
13、, FRAME, PLATFORM, AND ENCLOSURE2.11.1 Roller Guides2.11.2 Car Enclosure, Car Door, and Car Illumination2.11.2.1 Return Panels, Entrance Columns, Cove Base, and Transom2.11.2.2 Car Top2.11.2.3 Car Door2.11.2.4 Car Entrance Sill2.11.2.5 Carpet2.12 PASSENGER ELEVATOR HOISTWAY DOORS AND ENTRANCES2.12.1
14、 Hoistway Entrance Frames2.12.2 Hoistway Entrance Sills2.12.3 Hoistway Entrance Doors2.12.4 Entrance Fascias and Dust Covers2.12.5 Hoistway Ventilation2.13 FREIGHT ELEVATOR GUIDE SHOES, PLATFORM, AND ENCLOSURE2.13.1 Roller Guides2.13.2 Car Enclosure2.14 FREIGHT ELEVATOR HOISTWAY DOORS AND ENTRANCES2
15、.14.1 Door Panel2.14.2 Door Operation2.15 HANDICAPPED AND MEDICAL SERVICES ACCESS2.15.1 Provision For Handicapped2.15.2 Emergency Medical Service2.16 EMERGENCY POWER OPERATIONPART 3 EXECUTION3.1 INSTALLATION3.1.1 Traveling Cables3.1.2 Automatic Shutoff Valve3.1.3 Structural Members3.1.4 Safety Guard
16、s3.1.5 Other Requirements3.2 FIELD QUALITY CONTROL3.2.1 Testing Materials and Instruments3.2.2 Field Tests3.2.2.1 Endurance Tests3.2.2.2 Automatic Shutoff Valve Tests3.2.2.3 Speed Tests3.2.2.4 Leveling Tests3.2.2.5 Pressure Tests3.2.2.6 Insulation Resistance Tests3.2.2.7 Temperature Rise Tests3.2.2.
17、8 Motor Ampere Tests3.3 OPERATION AND MAINTENANCE TRAINING- End of Section Table of Contents -SECTION 14 24 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-14 24 00 (August 2010)-Preparing Activity: USACE
18、 SupersedingUFGS-14 24 00 (February 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION 14 24 00HYDRAULIC ELEVATORS08/10*NOTE: This guide specification covers the requirements for hydraulic passenger and freight elevators.Edit this guide specific
19、ation for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on thi
20、s guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Reques
21、t (CCR).*PART 1 GENERAL*NOTE: For NAVFAC projects, any editing of non-bracketed paragraphs in this specification must be approved through the NAVFAC Elevator Program.The designer will incorporate the following features into the design and will show in the drawings as applicable.1. Complete design of
22、 the hoistways, pits, machine rooms including all structural requirements, sizing, access, fire-resistant rating, ventilation, waterproofing and drainage.SECTION 14 24 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2. Proper size of opening
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS1424002010HYDRAULICELEVATORSPDF
