ARMY MIL-P-63316-1979 PRIMER BATTERY ELECTRIC PARTS FOR AND LOADING ASSEMBLING AND PACKING《引物用电池电子零件及其装药 组装和包装》.pdf
《ARMY MIL-P-63316-1979 PRIMER BATTERY ELECTRIC PARTS FOR AND LOADING ASSEMBLING AND PACKING《引物用电池电子零件及其装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63316-1979 PRIMER BATTERY ELECTRIC PARTS FOR AND LOADING ASSEMBLING AND PACKING《引物用电池电子零件及其装药 组装和包装》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-b33Lb 13 W 3377906 0348037 3 MIL-P-63316 (AR) 24 July 1979 MILITARY SPECIFICATION PRIMER, BATTERY, ELECTRIC PARTS FOR, AND LOADING, ASSEMBLING AND PACKING This specification is approved for use by the U. S. Army Armament Research and Development Command, and is available for use by all Departm
2、ents and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers the parts for, and the loading, assembling and packing for one type of primer designated as Primer, Battery, Electric. 2. APPLICABLE DOCUMENTS 2.1 The follawing documents of the issue in effect on data of invitati
3、on for bids or request for proposal, form a part of this specification to the extent specified herein. -. SPZ IFICATIONS FEDERAL PPP-B-621 - Boxes, Wood, Nailed and Lock Corner MILITARY MIL-P-14232 - Parts, Equipment and Tools for Army Materiel, Packaging and Packing of MIL-A-48078 - Ammunition, Sta
4、ndard Quality Assurance Provisions, General Specification for B . FSC: 1345 THIS DOCUMENT CONTAINS PAGES. hnefici commenta (mommead.tionrr, addition rtl 9 , Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Q) a O k LI u ai rl w cv N *v -3 k 8 t O U N
5、r- m m clp oy, O v) v W O O a al ai a Q) d O 2; 5 2 F: a x a k O O k ? LI I 01 rl Q) k O O a w O al - u F: al a .rl 3 w rl dI SO Q) L. O m P 3 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-P-63316 13 m 7779706 0348097 b m i i d Lr O rl h u
6、o ri ? k k O O pi k O e, o d e, a rl P w I 18 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-63316 13 H 3397706 03q8055 5 M MIL-P-63316 (AR) 4.4.3 Testing. Testing is described in the First Article and Quality Conformance Inspection tables. 4
7、.4.4 Inspection equipment. The inspection equipment required to perform the examinations and tests prescribed in this specification is identified, either directly or by reference, in the “Paragraph Reference/Inspection Method“ column of the First Article or Quality Conformance Inspection tables here
8、in. The contractor shall submit inspection equipment designs to the Government for approval in accordance with the terms of the contract. See Section 6 of MIL-A-48078 and 6.3 her e in. 4.4.5 Function test equipment. The test fixture and procedure for subjecting the electric battery primer to no-fire
9、 and all-fire output tests, as evidenced by diameter expansion of witness sleeve and inenting of witness plate shall be that described in 4.4.5.1. 4.4.5.1 Battery primer function fixture. The test fixture and procedure shall be as specified on Dwg.s 9275627, 9275629, 9275630, 9275631, 9275632, and 9
10、275633 with the following modifications: a. The diameter of the point or indenting diameter of Support Pin, Dwg. 9275663, shall be changed from .045“ - .003“ to 0.55“ 2 .001“. 4.5 b. The material for the Witness Sleeve, Dwg. 9275630, shall be copper-zinc lead alloy rod, alloy 356, temper-half hard,
11、to meet a hardness equivalent to Rockwell A40-55 when measured on the outside diameter. C. Primer, Dwg. 9275621, is replaced by Primer, wg. 9292624. Test methods and procedures. 4.5.1 Materials, components and processes. Compliance with all requirements of Section 3 of this specification shall be as
12、certained by current and continuing examination of inspection an test ata to determine that all components (parts, subassemblies, and materials) have been inspection ana tested and found to comply with their respective drawing and specification requirements, and that all specified manufacturing proc
13、esses have been followed. 19 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-6331b 13 7777706 03Li05b 7 E MIL-P-63316 (AR) 4.5.2 Moisture content of barium nitrate. The moisture content of barium nitrate shall be determined at the time of load
14、ing. The method shall be in accordance with MIL-STD-650, Method 101.5. be selected from that quantity to be used to produce a primer lot and shall meet requirements of the applicable drawing. content fails to comply with specified requirement of 3.3.1, the batch shall be rejected. The sample shall I
15、f the moisture 4.5.3 Moisture content of lead azide. The moisture content of lead azide shall be determined as specified in 4.5.2, except that a two gram sample shall be used and the dish covered with a sheet of polytetrafluoroethylene. The sample shall be selected from that quantity to be used to p
16、roduce a primer lot and shall meet the requirements of the applicable drawing. If the moistdure content fails to compIy with specified requirement of 3.3.2, the batch shall be rejected. 4.5.4 Functioning tests - Sensitivity and output. The battery primer samples selected from each inspection lot sha
17、ll be assembled to the applicable test fixture (see 4.4.5.1) and subjected to a no-fire test follcued by an all-fire output test. 4.5.4.1 No-fire test (70 + 10F). The battery primers shall be conditioned at 70 + 10F for two (2) hours minimum (min.) prior to function test. The-battery primers shall b
18、e assembled to the applicable test fixture (see 4.4.5.1) and subjected to a constant 10 ma current for 10 seconds min. to determine conformance with 3.4.1.1. Any primer which fails to comply with the applicable requirement shall be classed defective. (Non-destructive test). 4.5.4.2 All-fire output t
19、est (70 + 10F). Following the No-fire test of 4.5.4.1, the battery prTmers shall be fired by applying the energy from a 100 microfarad capacitor charged to 1.6 volts max. Observation shall be made for failure to comply with requirements specified in 3.4.1.2. requirements on the first attempt, it sha
20、ll be classed defective. (Destructive test). Ifany battery primer fails to meet the output 4.5.5 Environmental tests. 20 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- . MIL-P-63316 13 7779706 0348057 9 1 t MIL-P-63316 (AR) 4.5.5.1 Insulation resis
21、tance, thermal shock, vibration and function. tests in the following sequence: The battery primer sample shall be subjected to the required a. b. C. d. e. f. g. h. Measure insulation resistance between the two shunted electrodes and cup in accordance with 4.5.8. Condition for two (2) hours min. at m
22、inus 60 - 5OF. Remove from cold chamber and within 20 seconds transfer to a hot chamber at 155O + 5OF. Condition for two (2) hours min. at 155 + SF and 20% max. relative humidity. Remove from hot chamber. Vibrate for 15 minutes, minimum in a sweep covering a frequence range of 25-500-25 cycles per s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP633161979PRIMERBATTERYELECTRICPARTSFORANDLOADINGASSEMBLINGANDPACKING 引物 用电 电子零件 及其 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446791.html