ARMY MIL-P-63315-1979 PRESSURE CARTRIDGE PARTS FOR AND LOADING ASSEMBLING AND PACKING《压力弹药筒用零件及其装药 组装和包装》.pdf
《ARMY MIL-P-63315-1979 PRESSURE CARTRIDGE PARTS FOR AND LOADING ASSEMBLING AND PACKING《压力弹药筒用零件及其装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63315-1979 PRESSURE CARTRIDGE PARTS FOR AND LOADING ASSEMBLING AND PACKING《压力弹药筒用零件及其装药 组装和包装》.pdf(25页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-63315 (AR) 24 July 1979 MI LI TARY SPEC IF1 CAT ION PRESSURE CARTRIDGE PARTS FOR AND LOADING, ASSEMBLING AND PACKING This specification is approved for use by the U.S. Army Armament Research and Development Command, and is available for use by all Departments and Agencies of the Department of
2、Defence. 1. SCOPE 1.1 This specification covers the inspection of the parts, loading, assembling and packing for one type of electrically initiated pressure cartridge. 2. APPLICABLE WCUMENTS 2.1 Issues of documents. The following documents of the issue in effect on date of invitation for bids or req
3、uest for proposal form a part of this specification to the extent specified herein. SPECIFICATIONS FEDERAL PPP-B-621 Box, Wood, Nailed and Lock Corner MIL- S-45743 M I L I TARY Soldering, Manual Type, High Reliability, El ectri cal and El ectroni c Equi pment MIL-B-117 Bags, Sleeves and Tubing - Int
4、erior - Packaging MIL-P-14232 Parts, Equipment and Tools for Army Materiel, Packaging of MIL-A-48078 . Ammunition Standard Quality Assurance Provisions, General Specification for THIS DOCUMENT CONTAINS PAGES. I FSC: 1345 Beneficid commenta (reCOmm6ndrUons, additions, deletions) and any pertinent dat
5、a which may be of uw in improving this document should be addressed to: Commander, US Amy Armament Research and Development Command, Attn. DRDARQA, Dover, New Jersey 07801 by riaing the mifaddressed Standudiution Document Improvement fiaposal (DD Form 1426) appearing at the end of this document or b
6、y letter. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-b3315 13 W 9999906 0348010 5 W MIL-P-63315 (AR) STANDARDS MILITARY MIL-STD- 10 5 Sampling Procedures and Tables for MIL-STD- 12 9 Marking for Shipment and Storage MIL-STD-20 2 Test Metho
7、ds for Electronic and MIL-STD.650 Ekplosive, Sampling, Inspection Testing Inspection by Attributes Elec tr ical Component Parts DRAWINGS (See 6.4) US ARMY ARMAMENT RESEARCH AND DEVELOPEMENT COMMAND 9292613 Pressure Cartridge (Copies of specifications, standards, drawings, and publications required b
8、y suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer .I 2.2 Other publications. The following documents form a part of this specification to the extent specified herein. Unless otherwise indicated, the
9、issue in effect on the date of invitation for bids or request for proposal shall apply. CODE OF FEDERAL REGULATIONS TITLE 49 - Transportation, Parts 100-199 (The Code of Federal Regulations is available from the Superintendent of Documenks, U.S. Government Printing Office, Washington, D.C. 20402. Or
10、ders should specify, “49 CFR 100-199 (latest revision) I). 3. REQUIRPIENTS 3.1 Material. Materials shall be in accordance with the applicable drawings and specifictions, 3.2 Parts and assemblies. The parts and assemblies shall comply with all requirements specified on Drawing (Dwg.) 9292613, all ass
11、ociated drawings and with all requirements specified in applicable specifications and standards. 3.3 Moisture content of intermediate charge (calcium chromate and amorphous boron powder). The moisture content of the calcium chromate - boron powder intermediate charge at the loading station at the ti
12、me of loading shall not exceed 0.50 percent. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- -MIL-P-63315 33 9 7779706 O348033 7 MIL-P-63315 (AR) 3.4 Functioning output pressure/time test. The pressure cartridge shall function on the first attempt
13、 and shall produce a pressure of 450 psig minimum (min) for a the duration of 75 milliseconds (ms), when fired in a T-bomb with an internal volume of 0.049 cubic inches (in3). The time to peak pressure shall be 50 ms maximum (max) after application of the ignition pulse and the peak pressure shall b
14、e 2400 psig max (see fig 1). The cartridge shall function when temperature conditioned as specified in 4.5.8, 3.5 Insulation resistance. 3.5.1 Insulation resistance of pressure cartridqe assembly. The insulation resistance between the shorted (twisted) electrodes and the case shall be 50 megohms min
15、. at 325 volts direct current (vdc) when tested as specified in 4.5.4. 3.5.2 Insulation resistance, thermal shock and vibration and function. The pressure cartridge shall comply with the insulation resistance requirements of 3.5.1, and shall function on the first attempt when tested as specified in
16、4.5.5. 3.6 First article inspection. This specification contains technical provisions for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the con trac t. 3.7 Workmanship. All parts and assemblies shall be fabricated, and a
17、ssembled in a thorough, workmanlike manner. burrs, chips, sharp edges, cracks, surface defects, dirt, grease, rust, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. Exterior surface coa
18、tings shall be continuous; however, a few light scratches not exposing base material may be permitted. All required markings shall be neat and sharply defined. They shall be free of 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for Inspection and Standard Quality Assurance Provisions. Unless ot
19、herwise specified herein or in the. contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this de ta il spec if ica tion. 4.2 Classification of inspections. The following types of inspection shall be conducted on this item: a. First Article Inspection b. Quality Conforman
20、ce Inspection 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. MIL-P-b3315 13 W 777770b 03YB012 7 - -_II. _I_ . MIGP-63315 (AR) * 4.3 First article inspection. - -4.3.1 Submission. The contractor shall submit a first article sample as designated b
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP633151979PRESSURECARTRIDGEPARTSFORANDLOADINGASSEMBLINGANDPACKING 压力 弹药 零件 及其 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446786.html