ARMY MIL-P-63297-1978 PRIMER STAB PA515《PA515式针刺火帽》.pdf
《ARMY MIL-P-63297-1978 PRIMER STAB PA515《PA515式针刺火帽》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-63297-1978 PRIMER STAB PA515《PA515式针刺火帽》.pdf(26页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-63297 (AR) 14 December 1978 MILITARY SPEC I FICATION PRIMER, STAB, PA515 This specification is approved for use by the US Army Armament Research and Development Command, and is available of Defense. for use by all Departments and Agencies of the Department 1. SCOPE - 1.1 This specification con
2、tains requirements not covered by the drawings and provides quality assurance provisions for the PA515 Stab Primer. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids-or request for proposals, form a part of this specification to the extent spec
3、ified herein. SPECIFICATIONS FEDERAL QQ-A-2 5 O Aluminum - Alloy Plate and Sheet, General Specification for MILITARY , MIL-E-5272 Environmental Testing, Aeronautical and associated equipment, General Specifica- tion for Beneficial comments (recommendations, additions, deletions) and any pertinent da
4、ta which may be of use in improving this document should be addressed to: Commander US Army Armament Research and Development Command, Attn. DRDAR-QA, Dover, New Jersey 07801 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this documen
5、t or by letter. FSC: =-THIS DOCUMENT CONTAINS 26 PAGES. ,- Licensed by Information Handling Services2 Licensed by Information Handling ServicesMIL-P-63277 13 7777906 0347Y23 O U MIL-P-63 29 7 (AR) 3. REQUIREMENTS 3.1 General Requirements 3.1.1 Construction Materials and Composition - Construc- tion,
6、 materials and composition of the primer shall comply with this specification and applicable specificationsland drawings (See 2.1). 3.2 Detail Requirements 3.2.1 Function and Energy Output - The primers shall function satisfactorily as evidenced by a depression in the aluminum block within the limit
7、s of .O30 to .O56 centimeter (.O12 to .O22 inch) when tested as specified in 4.5.2. The primer must function on the first attempt. The two ounce steel ball shall be dropped from a height of four inches, measured from the top of the firing pin to the bottom of the ball. 3.2.2 Moisture Content 3.2.2.1
8、 Lead Azide: The moisture content of the lead azide at the loading station at the time of loading the primers shall not exceed 0.30 percent when determined-as specified in 4.5.3. mixture at the loading station at the time of loading the primer shall not exceed 0.30 percent when determined as specifi
9、ed in 4.5.3. 3.2.2.2 Primer Mixture: The moisture content of the primer 3.3 Workmanship: The manufacturer shall employ proced- ures which provide controls that preclude conditions which may adversely affect the safety or reliability of the primer (i.e. contamination, damage in handling, etc.). 3.4 F
10、irst Article Inspection: This specification contains provisions tor first article inspection. Reauirements for the submission of first article sampies by the contractor shall be as specified in the contract. 3 Licensed by Information Handling ServicesMIL-P-63277 13 9 7799706 0347434 2 E MIL-P-63297
11、(AR) 3.5, Data Requirements: The contractor shall generate data in accordance with the requirements of the data item de- scription cited in 4.5.4 (See 6.3). 4. OUALITY-ASSUFWNCE-PROVISIONS 4.1 Responsibility For Inspection and Standard Quality Acsurance-?ravisions: Unless otherwise specified herein
12、or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification-of.Inspectionc: The following types of inspection shall b e conducted on the item: a. First Article Inspection (See 4,3) b. Quality Conformance Inspection (see 4.
13、4) 4.3 First-Article Inspection 4.3.1 Submission: The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. The first article shall consist of 125 primers obtained by sampling as described in 4.4.2.1. The sample
14、s shall be obtained from a production lot which has been produced by the contractor usin the same production processes, procedures and equipment as wi 1 be used in fulfilling the contract. All materials shall be ob- tained from the same sources of supply as will be used in regu- lar production, Tabl
15、e 1 specitied herein. 4.3.2 Inspections to be Performed: See MIL-A-48078 and 4.3.3 Rejection: See MIL-A-48078. 4 Licensed by Information Handling ServicesMIL-P-63297 13 W 7997906 03Y7415 4 - i I ! ! ! - - I- V) rl ln 2 . Q Ki u Co ti . k .rl ti !t 2OC. Swirl for 30 seconds, then apply suction. Repea
16、t this procedure two times, making a total of three extractions. Using an eye dropper, transfer to the crucible enough alcohol to thoroughly wet the sample and wash the crucible walls. Aspirate until the odor of alcohol is no longer detectable and dry the crucible in an oven for 30 minutes at 60 + 5
17、OC. Cool in a desiccator and weigh. Record this weight as Weight B. Reserve the crucible and residue for the basic lead styphnate determination. Correct for the percentage of basic lead styphnate in the water extract as follows: Transfer the filtrate and washings quantitatively to a 100 ml. calibrat
18、ed volumetric flask, washing the beaker thoroughly with distilled water and dilute to the mark. Using a calibrated pipette, transfer a 10 ml, aliquot of this solu- tion to a second 100 ml. calibrated volumetric flask and dilute to the mark with distilled water. Transfer a portion of this solution to
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP632971978PRIMERSTABPA515PA515 针刺 PDF

链接地址:http://www.mydoc123.com/p-446767.html