ARMY MIL-L-60339-1965 LINER ASSEMBLY OUTER FOR CARTRIDGE 106MM M346A1《M346A1型106MM炮弹的衬垫组件外层》.pdf
《ARMY MIL-L-60339-1965 LINER ASSEMBLY OUTER FOR CARTRIDGE 106MM M346A1《M346A1型106MM炮弹的衬垫组件外层》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-L-60339-1965 LINER ASSEMBLY OUTER FOR CARTRIDGE 106MM M346A1《M346A1型106MM炮弹的衬垫组件外层》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、-. MIL-L-60337 13 = 7779706 0337788 4 W MIL-L-60339 ru) 6 MAY 1%5 MILITARY SPECIFICATION LINIER ASSEMBLY OUTER, FOR CARTRIDGE 106MM, M3P6Al 1. SCOPE STANDARDS MILITARY 1.1 This specification covers the liner a- MIL-STD-105 - Sampling Procedures and Tables for In- spection by AWb- utes (ABC-STD- 106)
2、. sembly for Cartridge, 106MM, M346A1. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue MIL-sTD-109 -Quality Asaurance in effect on date of invitation for bids or re- quest for proposal, form a part of this speci- fication to the extent specified herein. term d hbi- -,_-._-i ., . . :
3、 . . AiOIlt3. 5 ._ .- .- - SPECIFICATIONS .- . : . , . *. - -_ . .-Le -i -. . . - . - I I% . -,-.W. .:. I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-bo337 13 m 97999Ob 0337789 b m =- . _- .I. . . i. (Gopies of specifications, standards, dr
4、awings and pubications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer,) 3, REQUIREMENTS 3.1 Material Materials shall be in accord- ance with applicable drawings and specifica- tions. 3.2
5、 Parts. Parts shall comply with all re- quirements specified on Drawing (dwg.) 8837341, and with all requirements specified in applicable specifications. 3.3 Workmanship. All manufacturing and processing operations shall be performed in a thorough, workmanlike manner. All parts shall be free of cuts
6、, holes, tears, cracks, splits, excessive flash, dirt, grease or other foreign matter. 4. QUALITY ASSURANCE PROVISIONS 4.1 General quality assurance provisions. Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection require- me
7、nts as specified herein. Except as other- wise specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the Government. The Govern- ment reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed nece
8、ssary to assure supplies and services conform to prescribed requirements. Reference shall be made to MIL-STD-109 in order to define terms used herein. The provisions of MIE -4-2550 shall apply. 4.1.1 Submission of product. At the time the completed lot of product is submitted to the Government for a
9、cceptance the contrac- tor shall supply the following information accompanied by a certificate which attests 2 that the information provided is correct and applicable to the product being submitted : (a) A statement that the lot complies with all of the quality assurance provisions specified within
10、this specification. (b) Number of units of product inspect- ed. (c) Results obtained, by defect code, for all inspection performed. (d) Drawing, specification number and date, together with an identifica- tion and date of changes. (e) Certificates of compliance on all ma- terial purchased by the con
11、tract- or when such material is con- - trolled by Government specifica- tions referenced in any of the contractual documents. (f) Number of items in the lot. (g) Date submitted. The certificate shall be signed by a respon- sible agent of the certifying organization. The initial certificate submitted
12、 shall be sub- stantiated by evidence of the agents author- ity to bind his principal. Substantiation of the agents authority will not be required with subsequent certficates unless, during the course of the contract, this authority is vested in another agent of the certifying or- ganization. 4.1.2
13、Government verifcatwn. Using the contractors written- quality assurance pro- cedure, this detail specification, the applic- able drawings and other contractual docu- ments as a guide, the Government inspector shall verify at unscheduled intervals all qual- ity assurance operations performed by the c
14、ontractor. Verification will be performed to Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-L-60339 13 977970b 0337770 2 W the extent necessary to assure compliance with the contractual requirements. Severity of Government inspection of individ
15、ual char- acteristics will be directly related to the seriousness of the classification assigned. In no instance will a characteristic classified “critical” be accepted solely on the basis of the contractors records. .L - . _. 4.2 Initial production inspection 4.2.1 Prior to the start of regular pro
16、duc- tion, the contractor shall submit an initial production sample to a Government ap- proved facility as designated by the con- tracting officer (see 6.4) for evaluation in accordance with the provisions of 4.2.2. The initial production sample shall consist of 25 bodies and 25 bases, and 25 assemb
17、lies which have been produced by the contractor or furnished by a supplier and which have been manufactured using the same production processes, procedures and equipment which . will be used in fulfilling the contract. All mold cavities shall be proportionally repre- sented, molded components shall
18、be identi- fied as to mold and cavity numbers. All ma- terials shall be obtained from the same source of supply as will be used in regular production. The sample shall be accompanied by certificates of analysis for materials. An initial production sample, or portion thereof, as directed by the contr
19、acting officer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days, or whenever a change occurs in manu- f acturing process, material used, drawing, specification or source of supply as to sig- nificantly affect product uniformity as de- termined by the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILL603391965LINERASSEMBLYOUTERFORCARTRIDGE106MMM346A1M346A1 106 MM 炮弹 衬垫 组件 外层 PDF

链接地址:http://www.mydoc123.com/p-445645.html