1、 MIL-DTL-50911B 7 January 2011 SUPERCEDING MIL-P-50911A (AR) 19 March 1983 DETAIL SPECIFICATION PRIMING ASSEMBLY FOR DEMOLITION CHARGE ASSEMBLY: M183 PARTS FOR AND LOADING, ASSEMBLING AND PACKING This specification is approved for use by all Departments and Agencies of the Department of Defense. 1.
2、SCOPE 1.1 Scope. This specification prescribes the requirements and identifies the verification methods for the Priming Assembly for Demolition Charge Assembly: M183 Parts For and Loading, Assembling and Packing. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified
3、 in sections 3 or 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they
4、must meet all specified requirements of documents cited in sections 3 or 4 of this specification, whether or not they are listed. AMSC N/A FSC 1375 Distribution Statement A. Approved for public release; distribution is unlimited. INCH-POUND Comments, suggestions, or questions on this document should
5、 be addressed to: Commander, U.S. Army ARDEC, ATTN: RDAR-QES-E, Picatinny Arsenal, New Jersey 07806-5000 or e-mailed to ardecstdznconus.army.mil. Since contact information can change, you may want to verify the currency of this information using ASSIST Online database at https:/assist.daps.dla.mil.
6、Reactive after 7 January 2011 and may be use for new design and existing design and acquisition Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-50911B 2 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following s
7、pecifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-DTL-17124 - Cord, Detonating DEPARTMENT OF DEFENSE
8、STANDARDS MIL-STD-1916 - DOD Preferred Methods for Acceptance of Product MIL-STD-1168 - Ammunition Lot Numbering and Ammunition Data Card (Copies of these documents are available online at https:/assist.daps.dla.mil/ or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, P
9、hiladelphia, PA 19111-5094.) 2.2.2 Other Government documents, drawings and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the
10、 solicitation or contract. US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) DRAWINGS 8861109 - Clip, Cord, Detonating, M1 8861119 - Booster, Assembly 8861120 - Cup Booster 8861134 - Fuse, Detonating 9219074 - Priming Assembly (Copies of these drawings are available from U.S. Arm
11、y ARDEC, ATTN: RDAR-EIS-PE, Picatinny, NJ 07806-5000, or email pica.drawing.requestconus.army.mil.) 2.3 Non-Government publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the s
12、olicitation or contract. ASTM INTERNATIONAL ASTM A36/A36M - Standard Specification for Carbon Structural Steel (Copies of these documents are available from http:/www.astm.org or ASTM International, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.) Provided by IHSNot for ResaleNo reproductio
13、n or networking permitted without license from IHS-,-,-MIL-DTL-50911B 3 2.4 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and the references cited, the text of this document takes precedence. Nothing in this docume
14、nt, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample of the Priming Assembly shall be subjected to first article inspection in accordance with 4.3. 3.2 Conformance inspection. A sa
15、mple of the Priming Assembly shall be subjected to conformance inspection in accordance with 4.4. 3.3 Priming assembly. The priming assembly shall be in accordance with drawing 9219074. 3.4 Detonating fuse. Each lot of the detonating fuse shall be in accordance with MIL-DTL-17124. 3.5 Weight of char
16、ge. The weight of the booster charge shall be in accordance with drawing 8861119. 3.6 Output. Both boosters of one individual priming assembly shall initiate the M112 demolition charge by resulting in cutting through or indenting steel witness plates. 3.7 Ammunition lot numbering. Ammunition lot num
17、bers shall be assigned in accordance with MIL-STD-1168. 3.8 Workmanship. Al1 parts and assemblies shall be free of burrs, sharp edges, cracks, dirt, and other foreign matter. The booster cups shall not be cracked, bulged, scratched or deformed. Charges shall be free of breaks, cracks and other defec
18、ts. Colors shall be uniform. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. All required markings shall be neat and sharply defined. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,
19、-,-MIL-DTL-50911B 4 4. VERIFICATION TABLE I. Requirement/Verification cross reference matrix Methods of verification Classes of verification 1 Analysis A First Article 2 Demonstration B Conformance 3 Examination 4 Test Section 3 Requirements Description Verification Method Verification Class Section
20、 4 Verification Method 1 2 3 4 A B 3.1 First article X X X 4.3 3.2 Conformance inspection X X X 4.4 3.3 Priming assembly X X X 4.4.2.1 through 4.4.2.4 3.4 Detonating fuse X X X X X X 4.4.2.4 3.5 Weight of charge X X X 4.4.2.3, 4.5.2 3.6 Output X X X 4.5.3 3.7 Ammunition lot number X X X 4.5.4 3.8 Wo
21、rkmanship X X X 4.4.2.1 through 4.4.2.4, 4.5.5 4.1 Classification of inspection. The inspection requirements specified herein are classified as follows: a. First article inspection (see paragraph 4.3) b. Conformance inspection (see paragraph 4.4) 4.2 Inspection conditions. Unless otherwise specified
22、, all inspection shall be performed in accordance with the test conditions specified in 4.5. 4.3 First article. When specified, a sample of the priming assembly and subcomponents shall be subjected to first article inspection in accordance with Table II. 4.3.1 First article quantity. The first artic
23、le sample shall consist of the following items in sample quantities as indicated in Table II. 4.3.2 First article rejection. If any assembly, component or test specimen fails to comply with requirements, the first article sample shall be rejected (see 6.7). Provided by IHSNot for ResaleNo reproducti
24、on or networking permitted without license from IHS-,-,-MIL-DTL-50911B 5 TABLE II. First article tests and inspection. Examination or Test Drawing Number Sample Size Requirement Paragraph Verification M1 detonating cord clip Examination of Defects 8861109 10 3.3 4.4.2.1 Booster cup Examination of De
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL50911B2011PRIMINGASSEMBLYFORDEMOLITIONCHARGEASSEMBLYM183PARTSFORANDLOADINGASSEMBLINGANDPACKINGPDF

链接地址:http://www.mydoc123.com/p-444351.html