ARMY MIL-DTL-50523 A-2011 CHARGE DEMOLITION - M112 PARTS FOR LOADING ASSEMBLING AND PACKING.pdf
《ARMY MIL-DTL-50523 A-2011 CHARGE DEMOLITION - M112 PARTS FOR LOADING ASSEMBLING AND PACKING.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-50523 A-2011 CHARGE DEMOLITION - M112 PARTS FOR LOADING ASSEMBLING AND PACKING.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-DTL-50523A 2 August 2011 SUPERSEDING MIL-C-50523(AR) 8 May 1970 DETAIL SPECIFICATION CHARGE, DEMOLITION - M112 PARTS FOR LOADING, ASSEMBLING AND PACKING This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification co
2、vers the parts for one type of demolition charge designated as charge, demolition - M112 parts for loading, assembling and packing. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specification. This section does not include documen
3、ts in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all requirements documents cited in sections 3 and 4 of this specification,
4、whether or not they are listed. 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in t
5、he solicitation or contract. Comments, suggestions, or questions on this document should be addressed to: Commander, US Army ARDEC, Attn: RDAR-QES-E, Picatinny Arsenal, New Jersey 07806-5000 or emailed to ardecstdznconus.army.mil. Since contact information can change, you may want to verify the curr
6、ency of this address information using the ASSIST Online database at https:/assist.daps.dla.mil. AMSC N/A FSC 1375 DISTRIBUTION STATEMENT A. Approved for public release, distribution is unlimited. INCH-POUND Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IH
7、S-,-,-MIL-DTL-50523A 2 DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-DTL-117 - Bags, Heat Sealable DEPARTMENT OF DEFENSE STANDARDS MIL-STD-1168 - Ammunition Lot Numbering and Ammunition Data Card MIL-STD-1916 - DOD Preferred Method for Acceptance of Product MIL-STD-2073-1 - Standard Practice for Military
8、 Packaging (Copies of these documents are available online at https:/assist.daps.dla.mil/quicksearch or from the Standardization Documents Order Desk, 700 Robbins Avenue, Bldg. 4D, Philadelphia, PA 19111-5094) 2.2.2 Other Government documents, drawings and publications. The following other Governmen
9、t documents, drawings and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation. US ARMY ARMAMENT RESEARCH, DEVELOPMENT, AND ENGINEERING CENTER (ARDEC) DRAWINGS 8876127 - Box, Wirebound,
10、 Packing, Ammunition for Charge, Demolition, M112 9204248 - Charge, Demolition, M112 (Copies of these drawings are available online at pica.drawing.requestconus.army.mil or from US Army ARDEC, ATTN: RDAR-EIS-PE, Picatinny Arsenal, NJ 07806-5000). 2.3 Non-Government publications. The following docume
11、nts form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. ASTM INTERNATIONAL ASTM A36/A36M - Standard Specification for Carbon Structural Steel (Copies of the above document can be obtai
12、ned from the ASTM headquarters, 100 Barr Harbor Drive, West Conshohocken, PA 19428 or online at www.astm.org.) 2.4 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and the references cited herein, the text of this doc
13、ument takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-50523A 3 3. REQUIREMENTS 3.1 Required inspect
14、ions. 3.1.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection in accordance with 4.3. 3.1.2 Conformance. A sample shall be subject to conformance inspection in accordance with 4.4. 3.2 M112 demolition charge, components and assemblies. 3.2.1 Demolition
15、charge. The demolition charge shall conform to drawing 9204248. 3.2.1.1 Physical properties. Each individual charge will have a force resistance to the penetrameter of not less than 2.0 pounds and not greater than 8.0 pounds when tested. 3.2.1.2 Specific gravity. The specific gravity of the charge s
16、hall be not less than 1.50. 3.2.1.3 Energy output. The demolition charge shall cut a 1.0 inch thick steel witness plate, ASTM A36 grade 1018, completely into two separate sections. 3.2.1.4 Ability to cut and mold the charge. The charge shall not break, crumble, or otherwise lose its shape when cut o
17、r handled. 3.2.2 Wirebound box. The wirebound box shall conform to drawing 8876127. 3.2.2.1 Heat seal of barrier bag. The barrier bag heat seal shall exhibit no separation for the duration of 5 minutes. 3.3 Ammunition lot number. Ammunition lot numbers shall be assigned in accordance with MIL-STD-11
18、68. 3.4 Workmanship. Parts and assemblies shall be free of cracks, tears, voids, burrs, chips, dirt, grease, rust corrosion of packaging and metal clip-tie, and other foreign material that may adversely affect appearance or be injurious to personnel handling the item. The demolition charges shall be
19、 clean and free of holes with the exception of those due to force gage physical property testing of the penetrameter when performed in accordance with 4.5.1. The cleaning method used shall not be injurious to any part or assembly nor shall the cleaning agent contaminate them. All required markings s
20、hall be neat, separated and sharply defined. All packing materials must be dry at time of packing. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-50523A 4 4. VERIFICATION TABLE I. Requirement/verification cross reference. 4.1 Classification
21、of inspections. The inspection requirements specified herein are classified as follows: a. Physical configuration audit (see paragraph 4.2) b. First article (see paragraph 4.3) c. Conformance (see paragraph 4.4) 4.2 Physical configuration audit (PCA). When specified, a sample shall be submitted to P
22、hysical Configuration Audit (PCA). 4.2.1 PCA quantity. The PCA shall consist of 100% verification of all requirements of drawings 13021902 and all of their components, assemblies, subassemblies, materials and components. Not less than five (5) samples of each component, etc. for all requirements sha
23、ll be verified. 4.2.2 PCA rejection. If any item of the sample fails to comply with the PCA requirements, the sample shall be rejected. Method of verification Classes of verification 1 Analysis 2 Demonstration 3 Examination 4 Test A First article B Conformance Section 3 Requirement Description Verif
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL50523A2011CHARGEDEMOLITIONM112PARTSFORLOADINGASSEMBLINGANDPACKINGPDF

链接地址:http://www.mydoc123.com/p-444350.html