ARMY MIL-DTL-50512 A-2010 MINE APERS PRACTICE M68 ASSEMBLING AND PACKING《M68型练习用杀伤性地雷的组装和包装》.pdf
《ARMY MIL-DTL-50512 A-2010 MINE APERS PRACTICE M68 ASSEMBLING AND PACKING《M68型练习用杀伤性地雷的组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-50512 A-2010 MINE APERS PRACTICE M68 ASSEMBLING AND PACKING《M68型练习用杀伤性地雷的组装和包装》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-DTL-50512A 1 February 2010 SUPERSEDING MIL-M-50512 (MU) 29 February 1972 DETAIL SPECIFICATION MINE, APERS, PRACTICE, M68 ASSEMBLING AND PACKING This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification prescribes
2、the requirements and identifies the verification procedures for the Mine, APERS, Practice, M68. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3 or 4 of this specification. This section does not include documents cited in other sections of this sp
3、ecification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3, or 4 of this specification, whether or not the
4、y are listed. 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or
5、 contract. AMSC N/A FSC 1345 DISRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. INCH-POUNDComments, suggestions, or questions on this document should be addressed to: Commander, U.S. Army ARDEC, ATTN: RDAR-QES-E, Picatinny Arsenal, New Jersey 07806-5000 or e-mailed to a
6、rdecstdznconus.army.mil. Since contact information can change, you may want to verify the currency of this information using ASSIST Online database at http:/assist.daps.dla.mil. Inactive for new design after 19 August 1997 Provided by IHSNot for ResaleNo reproduction or networking permitted without
7、license from IHS-,-,-MIL-DTL-50512A 2 DEPARTMENT OF DEFENSE STANDARDS MIL-STD-1916 - DoD Preferred Methods for Acceptance of Product MIL-STD-1168 - Ammunition Lot numbering and Ammunition Data Card (Copies of these documents are available online at http:/assist.daps.dla.mil or from the Standardizati
8、on Documents Order Desk, 700 Robbins Avenue, Bldg. 4D, Philadelphia, PA 19111-5094.) 2.2.2 Other Government documents, drawings and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specifi
9、ed, the issues of these documents are those cited in the solicitation or contract. U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) DRAWINGS 9251503 - Mine, APERS, Practice, M68 8800900 - Packing and marking for Box, Wirebound for Mine, APERS, M18A1 w/Accessories or Mine, APER
10、S, Practice, M68 or MCCM, M5 w/Accessories 8800901 - Packing and Marking for Box, Fiberboard for Mine, APERS, M18A1 or Mine, APERS, Practice, M68 or MCCM w/Accessories, M5 or M5A1 (Copies of these drawings are available from U.S. Army ARDEC, ATTN: RDAR-EIS-PE, Picatinny, NJ 07806-5000, or email pica
11、.Drawing.Requestconus.army.mil.) 2.3 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and the references cited, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws
12、 and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample of the Practice Mine Assembly shall be subjected to first article inspection in accordance with 4.3. 3.2 Conformance inspection. A sample shall be subjected to confor
13、mance inspection in accordance with section 4.4. 3.3 Assemblies. The assemblies shall comply with all requirements specified on Dwg. 9251503. 3.4 Ammunition lot numbering. Ammunition lot numbers shall be assigned in accordance with MIL-STD-1168. Provided by IHSNot for ResaleNo reproduction or networ
14、king permitted without license from IHS-,-,-MIL-DTL-50512A 3 3.5 Workmanship. All mines and accessories shall be free of burrs, sharp edges, cracks, dirt, grease, rips, rust and other foreign matter. Colors shall be uniform. All required markings shall be neat and sharply defined. All packing compon
15、ents shall be dry. 4. VERIFICATION TABLE I. Requirement / Verification cross reference matrix Methods of Verification Classes of Verification 1 Analysis A First Article 2 Demonstration B Conformance 3 Examination 4 Test Section 3 Requirements Description Verification Method Verification Class Sectio
16、n 4 Verification Method 1 2 3 4 A B 3.1 First article inspection X X 4.3 3.2 Conformance inspection X X X 4.4 3.3 Assemblies X X X 4.4.2.1 through 4.4.2.5 3.4 Ammunition lot numbering X X X 4.5.1 3.5 Workmanship X X X 4.5.2 4.1 Classification of inspection. The verification requirements specified he
17、rein are classified as follows: a. First article inspection (see paragraph 4.3) b. Conformance Inspection (see paragraph 4.4) 4.2 Inspection conditions. Unless otherwise specified, all inspections shall be performed in accordance with the test conditions specified herein. 4.3 First article. When spe
18、cified, a sample of the training assembly and subcomponents shall be subjected to first article inspection in accordance with Table II. 4.3.1 First article quantity. The first article sample shall consist of the following items in sample quantities as indicated in Table II. 4.3.2 First article rejec
19、tion. If any assembly, component or test specimen fails to comply with requirements, the first article sample shall be rejected. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-50512A 4 TABLE II. First article tests and inspection. Examinatio
20、n or Test No. of Sample Units Requirement Paragraph Paragraph Reference/ Inspection Method MINE, APERS, PRACTICE M68 (Dwg. 9251503) Examination of defects 12 3.3 4.4.2.1 Carton, prior to sealing (Dwg. 8800901) Examination of defects 12 3.3 4.4.2.2 Carton, sealed (Dwg. 8800901) Examination of defects
21、 12 3.3 4.4.2.3 Bag, packing (Dwg. 8800900) Examination of defects 12 3.3 4.4.2.4 Wood packing box (Dwg. 8800900) Examination of defects 12 3.3 4.4.2.5 4.4 Conformance inspection. 4.4.1 Lot formation. Lot formation shall be in accordance with MIL-STD-1916. In addition, each inspection lot of M68 ass
22、emblies shall be produced with components complying with the following constraints: 4.4.1.1 Part no. 9251503-1. a. M33 practice mine from not more than one lot interfix number from one manufacturer. b. M7 bandoleer from not more than one lot interfix number from one manufacturer. c. M10 practice bla
23、sting cap assembly from not more than one lot interfix number from one manufacturer. d. M57 firing device assembly from not more than one lot interfix number from one manufacturer. e. M40 electrical test set assembly from not more than one lot interfix number from one manufacturer. 4.4.1.2 Part no.
24、9251503-2. a. M33 practice mine from not more than one lot interfix number from one manufacturer. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-50512A 5 b. M7 bandoleer from not more than one lot interfix number from one manufacturer. c. Mi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL50512A2010MINEAPERSPRACTICEM68ASSEMBLINGANDPACKINGM68 习用 杀伤性 地雷 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-444349.html