ARMY MIL-C-46261-1960 CARTRIDGE 81MM TP M362A1 LOADING ASSEMBLING AND PACKING《M362A1型81MM硫代嘌呤炮弹的装载 组装和包装》.pdf
《ARMY MIL-C-46261-1960 CARTRIDGE 81MM TP M362A1 LOADING ASSEMBLING AND PACKING《M362A1型81MM硫代嘌呤炮弹的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-46261-1960 CARTRIDGE 81MM TP M362A1 LOADING ASSEMBLING AND PACKING《M362A1型81MM硫代嘌呤炮弹的装载 组装和包装》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-46261 Ord) 17 Aunust 19 bo MILITARY SPECIFICATION CARTRIDGE, 8UM, TP, H362A1 LOADING, ASSEMBLING AND PACKING le SCOPE 1.1 This specification covers the loading, assembling and packing for one type of target practice cartridge designated ar M362A1, for use with the 8lMM Mortar. 2. APPLICABLE DO
2、CUMENTS 2*1 The following documents of the iasue in effect on date of invitation for bids foh a part of this specification to the extent rpecified herein. SPECIFICATIONS MILITARY MIL-G-2550 - General Specification for Ammunition Except Small Am8 AiPnxnitiOn. STANDARDS MILITARY MIL-STD-105 - Sampling
3、 Procedure8 and Tables -for Inrpectioa 1 MIL-STD0109 Inspection Terms and Definitions. by Attributes. DRAWINGS OB1113MCE CORPS 6839666 - Cartridge, TP, M36Ul W/he M524 (Tl86rll) 7549031 - Container, Ammunition, Fiber, 13252, for 8lMM 7549032 for 81MM Mortar Assembly. Wrtar Ammunition. Assembly, Deta
4、ils and Packing. Box, Packing, Amunition, for 8I“Morar AiPrnunition and Fiber Containur H252. Details and Paaklng, hsembly, Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PUBLICATIONS ORDNANCE CORPS 0-608-11 - Procedures and Tables for Continuous Sa
5、mpling by Attributes. IEL-(see 6.3) - Index of Inspection Equipment Lists, (Copies of specifications, standards, drawings and publications required by contractors in connection with specific procurement functions should be obtained from the proeuring activity or as directed by the contracting office
6、s) . 30 REQUIREMENTS 2.3. Material.-Materials ahail be in accordance with apglicabl drawbgs and specifications. 3,2 Cartrid aa.-The cartridge shall comply with all require- ments specdrawing (dwg.) 8839446, and with all requirement specified in applicable specifications. 3.3 Proving Frsund testenThe
7、 cartridge shall comply with the f0llQwhg requirements when tested as specified in 4oL010 3.311 Failure to firee-Tbe cartridge shall not fail to fbe. shall be no premature burst. cartridge shall function upon ampact e 3*3.4 RanRe.-No cartrid 8 han 80 percent of %he averagg horhmratal range. 3.4 Work
8、manshi . 304eld shall be free of chips, dirt grea8eo rust and sther fogign matter, to the parts nor shall the parots be contaminated by the cleaning agent s. loading eontractor on my components furnished to him painted and marksd when SU to perorm any of the impections set forth in the specifi- eeti
9、ons are deemd necessary to assure that .a vices conform to prescribed requirements, speotion shall be performed in accordance with Referenco - MO9 in order to define the terms fcation and other specifications referenced in any of , -. e tiovernment covering the supplies procured- under urrent writte
10、n deswip.tfon of the system shall 5211s specixicatlon and shall perform ail inspections required by * LI. - - L .sposition of non-conforminn ription will be considered acceptable me provisions of 403 and 4.4 (except proving ground tests), and ced herein, The contractor shall not I provides the quali
11、ty assurance required by 4.L- ,AL- 2- - - - - nspection station nor the method of in- approved quality assurance procedure. I to whether certain procedures of the con- spemioxz IXsted in this specification provided that an equivalent - . - of, and obtain approval for, any change to that affects the
12、degree of assurance required or other documents referenced herein. - _-_ :ta-At the time the completed lot or product. is submitted to -t%ivernment - for acceptance the con- _- - tight have an effect on the-quality of the n-n-n+ -h-il zalld to the attention of the contrnc.t.nr immortd - - - -_ dl9 r
13、eport such instances, FailuFe of the contrnnt.nr t.n I - r- - inti1 correeeion has- been made or until conformance t- =Av. :riteria has been demonstrated, a - - - - ?roeese which the contractor will use- in fulfilling tha ,-nn+-n+ Lo a Government-approved facility designated by the c _.- Ifficer. Th
14、e PreDroduction Juantitv shall he eiihmi +.+-A n-4 ,.- *a 0 a-w YUIIVL abu, ontracti nu - - - - -u1 -“d all the complete rund (end item) reairements sanei fi na nr . -=- rrruy*vi ;hese inspections-the 40 cartridges shall be forwarded to i nent proving ground for ballistic testing in accnrdan- he bal
15、listic sample, -A- - , I-* _- md the contractor- shall- take the necessary correctiv submit a new preproduction quantity, orportion there-, _. y the contracting officer. The contractor shall continue nit new or supplemental quantities as necessary, until suck a quantity successfUly parses the impect
16、ion specified or lotherwise directed by tho procuring activity, 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-by ne manuzacturer in one unchanged process, in accordance with the same drawing, same drawing revision, sam specification, and same spe
17、c3icaLion revision. Drawing, specification, and procesa changes no-, affecting safety, performance, or fit, as determined by the Government, shall not necessitate changing the lot munber. Each lot shall contain: a, Metal parta or metal parts assembli.es of one interfix lo+, number from one manufactu
18、rer. bo Loaded ignition cartridges of one interfix lot from one manufacturer, C, Fin assemblies of one interfix lot number from one manufacturer, do Loaded primers of one interfix lot number from one manufacturer , e, Propellant increaents made from not more than one lot of propellant from one manuf
19、acturer, fe Loaded fuzes of one interfix lot number from one mu- - l+,je2 Examination,-Sampling plans arid procedures for . the I. fol- shall be 100 percent;, Conthuous sampling plans in accordance with Handbook ORD-M608-11 may be used if approved by the procuring activity Also, at the option of the
20、 procuring activity, AQLts and sampling plans may be applied to the individual characteristics listed using percent for each minor defect. formance of the insections listed shall be in accordance with 4.3.4. an AQL of 0025 percent for each major defect and an AQL of Om40 I Equipment necessary for th
21、e per- Categories Defe- Method of inmection Critical: None defined I Ma Sor: None defined Minor: AQL 1.0 percent I 201, Foreign matter in shell cavity (see 3.4) Vimal 202, Interior protective coating with bare Spot ommmommmom.m,.moooooomoomomommoom Vimal ; . . . . Provided by IHSNot for ResaleNo rep
22、roduction or networking permitted without license from IHS-,-,-4,3.2,2 .1 of dwpo 88394462. Categories Defects Method of inspection CAtfcal: Nane defined6 3: a3 or : Minor; AQL 2.5 percent Shel loading assembly (see dwg. 8839447 covering a AQL 0.25 percent 101, ,Weight improper eebO.oo.bOoee Balance
23、 201, Total length, maxim (max.) Gage 202, Depth of fuze cavity, max, OOOO Gage 203, Protective coating wich bare spot e Visual 20h0 Marking misleading or unidentifiable Viaual 205, Evidence of poor workmanrship (see 3.4) .e Visual k030203 Assembly (see dwRo 88394461. Categories Defects Method of in
24、spection Critical: I., 20 3. 40 Major: 101 o 102 o 1030: Brimer above flush with rear face of fin relief OOOOOoO.Oo.oo. Fuze safety wire missing or improperly secured .OOOOoOOO.OooOOooo.o. Ignition cartridge dssing or inverted Warning label missing or illegible AQL 0.40 percent Fin assembly loose .O
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC462611960CARTRIDGE81MMTPM362A1LOADINGASSEMBLINGANDPACKINGM362A1 81 MM 嘌呤 炮弹 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-441481.html