AGA GEOP T-1-1989 GEOP Series Pipelines Planning and Economics Book 1 Vol II (XY8903)《GEOP系列 第II卷第1册管道 规划和经济XY8903》.pdf
《AGA GEOP T-1-1989 GEOP Series Pipelines Planning and Economics Book 1 Vol II (XY8903)《GEOP系列 第II卷第1册管道 规划和经济XY8903》.pdf》由会员分享,可在线阅读,更多相关《AGA GEOP T-1-1989 GEOP Series Pipelines Planning and Economics Book 1 Vol II (XY8903)《GEOP系列 第II卷第1册管道 规划和经济XY8903》.pdf(387页珍藏版)》请在麦多课文档分享上搜索。
1、GEOP Gas Engineering and Operating Practices A Series by the Operating Section The American Gas Association Volume II TRANSMISSION Book T-1 Pipelines/Planning and Economics The American Gas Association Arlington, Virginia Legal Notice The Gas Engineering and Operating Practices Series was prepared b
2、y the American Gas Association (A.G.A.), its member companies and other individuals and groups with an interest in the natural gas industry. Neither A.G.A., its member companies, employees, nor any person acting on their behalf: a. Makes any warranty or representation, express or implied, with respe
3、ct to the accuracy, completeness, or usefulness of the information contained in this series, or that the use of any apparatus method, or process disclosed in this series may not infringe privately owned rights; or b. Assumes any liability with respect to the use of, or for damages or personal injuri
4、es resulting from the use of any information, apparatus method, or process disclosed in this series, or for violation of any federal, state or municipal regulation with which it may conflict. c. Reference to trade names or specific commercial products, methods, commodities or services in this series
5、 does not represent or constitute an endorsement, recommendation or favoring by A.G.A. or any other person of the specific commercial product, commodity or service. d. Nothing contained in this series is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, o
6、r use in connection with any method, apparatus, or product covered by letters patent, nor as insuring anyone against liability for infringement of letters patent. Copyright 1989 by the American Gas Association, A.G.A. All rights reserved. Library of Congress Catalog Card Number: 8570460 ISBN 0872570
7、045 A.G.A. Catalog Number XY8903 1M12.8915075 Printed in the United States of America CONTENTS FIGURES AND TABLES . xv PREFACE xix ACKNOWLEDGEMENTS xxiii PART 1. PIPELINES CHAPTER 1. LOCATION OF TRANSMISSION LINE 1 Scope . 1 History . 1 Project Justification . 3 Route Selection . 3 Obstacles to Pipe
8、line Construction . 4 Crossings 5 Corridor Concept 5 Air Quality Considerations . 5 New Methods of Route Selection 6 Archaeological Records . 6 Aerial Reconnaissance 7 Locating Pipelines Near Other Structures . 7 Developing Guidelines . 8 Public Relations . 8 Public Concerns 9 Acquisition of Easemen
9、ts 10 iii iv PIPELINES/PLANNING AND ECONOMICS Options 10 Compensation . 10 CHAPTER 2. DESIGN OF NATURAL GAS TRANSMISSION LINES . 11 Scope . 11 General Steady-Flow Equation 11 Reynolds Number 13 The Friction-Transmission Factor . 13 General Types of Equations in Use 16 Spitzglass Equation 16 Weymouth
10、 Equation . 17 Panhandle Equations . 17 Rhodes Equation . 18 A.G.A. Equations 18 Two-Phase Flow . 19 Slip/Liquid Holdup . 20 Two-Phase Flow Patterns 20 Design Procedure . 21 Friction Component 21 Elevation Component . 22 Acceleration Component 22 Use of Single-Phase Gas Flow Equations in Two-Phase F
11、low . 22 Multiphase Flow Models . 23 Dukler Correlation 23 Flannigans Correlation 28 Beggs and Brill Correlation 30 APPENDIX I. DERIVATION OF THE GENERAL STEADY-FLOW EQUATION . 34 CHAPTER 3. THE DESIGN OF PIPELINE FACILITIES 39 Scope . 39 Pipeline Drafting Symbols 39 General Provisions 48 Pipeline D
12、esign Factors 48 Temperature Derating 49 Longitudinal Joint Factors . 50 Sour Gas Facilities 50 Type of Pipe for Sour Gas Service 50 Inhibitors . 50 Calculations . 51 CONTENTS V Extrusions 51 Extrusion Calculation Nomenclature . 55 Branch Reinforcing 64 Pad Reinforced Branch Connection Calculation 6
13、4 Solution . 64 Roles for Weld reinforcing . 69 Concrete Coating Thickness and Weight Spacing 70 Negative Buoyancy 70 Concrete Set-On and Bolt-On Weights . 77 Natural Sags, Side Bends, and Overbends Minimum Bending Radius 82 Field BendsMinimum Bending Radius Calculations 85 Pipe Manufacturing Proces
14、s . 85 Seamless Line Pipe . 86 High-Frequency Electric Resistance Welded Line Pipe . 86 High-Frequency Electric-Resistance-Welded Line Pipe . 86 Submerged Arc-Welded Longitudinal and Spiral Seam Line Pipe 86 Standard Pipe Specifications . 91 Supplementary Pipe Specifications . 91 Pipe Coatings . 91
15、Pipeline Valves . 92 Ball Valves . 92 Gate Valves 93 Plug Valves . 93 Check Valves 94 Globe Valves . 94 Butterfly Valves . 94 Valve Operators 95 Manual Valve Operators . 95 Wrench Operators 95 Gear Operators . 95 Power Assisted Valve Operators . 95 Controls for Power Assisted Valve Operators 96 Main
16、 Line Valve Settings . 96 Blow Offs 96 Crossovers 98 Bypasses . 98 Liquid Removal Facilities . 99 Slug Catcher . 99 Line Drips 103 Scraper Traps . 104 Launching Traps 104 vi PIPELINES/PLANNING AND ECONOMICS Receiving Traps 106 On-Stream Pigging, Station Bypass . 107 Pipeline Fittings 107 Elbows . 10
17、8 Tees . 109 Extruded Header 109 Reducers . 110 Flanges 110 Crossings 112 Highway and Railroad Crossings 112 Slick-Bore Crossings 112 Open Cut Crossings . 114 Cased Crossings . 114 River and Stream Crossings 116 Submerged Crossings . 116 Bored Crossings 117 Aerial Crossings . 117 Bank Stabilization
18、. 117 Meter Stations 117 Pressure Limiting Stations 118 Regulator Stations 119 Branch Connections 119 Storage Facilities 120 Offshore Risers . 122 CHAPTER 4. PIPELINE REPAIR-ON SHORE . 127 Scope . 127 Operating Considerations . 127 Types of Damage 128 Gouge or Groove . 128 Dents 128 Laminations . 12
19、8 Hard Spots . 129 Arc Burn . 129 Wrinkle Bends . 129 Corrosion Pitting . 130 Cracks . 130 Weld Defects 131 Leaks 131 Methods of Repair 131 Prevention of Damage . 131 Prohibited Repair 132 Temporary Repair 132 CONTENTS vii Reduced Operating Pressure . 132 Bolt-On Split Sleeve . 132 Permanent Repair
20、. 133 Grinding 133 Cylindrical Cut-Outs . 134 Full Encirclement Welded Split Sleeve 135 Full Encirclement Bolt-On Split Sleeve 136 Collar Leak Clamp . 136 Bolt-On Leak Clamp 136 Welded Patch 137 Leak Repair Safety 137 Emergency Leak Repair Plan 137 Leak Classification . 137 Employee Safety . 138 Tes
21、ting of Repairs . 139 Air, Gas, or Liquid Test . 139 Nondestructive Testing of Welds . 139 Testing of Cylindrical Cut-Outs 140 Testing of Mechanical Repairs 140 CHAPTER 5. PIPELINE CONSTRUCTION 141 Scope . 141 Contracts 143 Firm Bid or Fixed Price . 143 Time-and-Material or Cost-Plus 143 Cost Plus F
22、ixed-Fee With Bonus/Penalty Provisions 144 Safety 144 Right-of-Way Safety . 145 Off Right-of-Way Safety . 146 Offshore Safety . 146 Barge Safety . 147 Survey Boat Safety . 147 Platform Safety 148 Surveys . 148 Route Selection . 148 Ground Surveys 150 Preliminary Onshore Survey 150 Preliminary Offsho
23、re Survey . 152 Horizontal Control 152 Vertical Control 153 Construction Survey . 153 As-Built Survey 154 viii PIPELINES/PLANNING AND ECONOMICS Construction Procedures . 155 Onshore Right of Way Clearing 155 Grading . 155 Stringing . 156 Ditching 157 Welding . 158 Weld Inspection 159 Field Coating 1
24、60 Lowering . 161 Tie-In . 162 Backfilling . 162 Cleaning 163 Hydrostatic Testing 163 Dewatering . 165 Sizing 165 Purging and Loading . 166 Clean-Up of Right of Way 166 Job Closure . 167 Crossings 167 Bored Crossings 167 Cased Crossings 168 Slick Bored (Noncased) Crossings . 168 Open Cut Crossings 1
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AGAGEOPT11989GEOPSERIESPIPELINESPLANNINGANDECONOMICSBOOK1VOLIIXY8903GEOP 系列 II 管道 规划 经济 XY8903PDF

链接地址:http://www.mydoc123.com/p-421893.html