ABS 61-2018 RULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT 2018.pdf
《ABS 61-2018 RULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT 2018.pdf》由会员分享,可在线阅读,更多相关《ABS 61-2018 RULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT 2018.pdf(718页珍藏版)》请在麦多课文档分享上搜索。
1、 Notices and General Information RULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT 2018 NOTICES AND GENERAL INFORMATION American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2017 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Northchase Drive
2、Houston, TX 77060 USA Table of Contents part Notices and General Information CONTENTS Introduction . 1 TABLE 1 Applicable Editions of Booklets Comprising 2018 Rules 2 TABLE 2 Division and Numbering of Rules and Guides 2 Rule Change Notice (2018) . 3 TABLE 3 Summary of Changes from the 2017 Rules 3 i
3、i ABSRULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT .2018 Notices and General Information Introduction 1. The year 2018 edition of the Rules for Building and Classing High-Speed Craft consists of the eight (8) booklets as shown in Table 1. With regard to three booklets, Part 1, Part 2, and Part 7:
4、 a) The purpose of the generic title ABS Rules for Conditions of Classification High-Speed Craft (Part 1) is to reflect the expanded contents of PART 1, as a result of including consolidated requirements for “Classification” applicable to all types of and sizes of high-speed craft as specified in th
5、e Foreword to Part 1. Additional specific requirements are contained in Chapters 2 and 3 of Part 1. b) The purpose of the generic title ABS Rules for Materials and Welding of PART 2 is to emphasize the common applicability of the requirements to ABS-classed vessels, other marine structures and their
6、 associated machinery, and thereby make PART 2 more readily a common “PART” of various ABS Rules and Guides, as appropriate. c) The purpose of the generic title ABS Rules for Survey After Construction (Part 7) is to reflect the expanded contents of PART 7, as a result of including consolidated requi
7、rements for “Surveys After Construction” applicable to all types and sizes of vessels, barges and specific shipboard arrangements/systems, etc., as specified in Part 7, Chapter 1, Section 1. 2. The numbering system applied in the Rules is shown in Table 2. 3. The primary changes from the 2017 Rules
8、are identified and listed in Table 3. The effective date of the indicated Rule Changes is 1 January 2018, unless specifically indicated otherwise. 4. The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each P
9、art. Unless a particular date and month are shown, the years in parentheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 199
10、3 5. Until the next edition of the Rules for Building and Classing High-Speed Craft is published, Rule Change Notices and/or Corrigenda, as necessary, will be published on the ABS website www.eagle.org only, and will be available free for downloading. It is not intended to publish hard copies of fut
11、ure Rule Change Notices and/or Corrigenda to existing Rules or Guides. The consolidated edition of the Rules for Building and Classing High-Speed Craft, which includes Rule Change Notices and/or Corrigenda using different colors for easy recognition, will be published on the ABS website only when RC
12、N and/or Corrigenda are issued. 6. The listing of CLASSIFICATION SYMBOLS AND NOTATIONS is available from the ABS website www.eagle.org for download. ABSRULES FOR BUILDING AND CLASSING HIGH-SPEED CRAFT .2018 1 Notices and General Information TABLE 1 Applicable Editions of Booklets Comprising 2018 Rul
13、es Notices and General Information 2018 Part 1: Rules for Conditions of Classification High-Speed Craft 2018* Part 2: Rules for Materials and Welding Rules for Testing and Certification of Materials Rules for Welding and Fabrication 2018* Part 2: Rules for Materials and Welding Aluminum and Fiber Re
14、inforced Plastics (FRP) 2018* Part 3: Hull Construction and Equipment 2018 Part 4: Craft Systems and Machinery 2018 Part 5: Specialized Craft and Services 2018 Part 7: Rules for Survey After Construction 2018* * Note: The latest edition of these Rules is to be referred to. These Rules may be downloa
15、ded from the ABS website at www.eagle.org, Rules and Guides, Downloads or may be ordered separately from the ABS Publications online catalog at www.eagle.org, Rules and Guides, Catalog. TABLE 2 Division and Numbering of Rules and Guides Division Number Part Part 1 Chapter Part 1, Chapter 1 Section S
16、ection 1-1-1 Subsection (see Note 1) 1-1-1/1 Paragraph (see Note 1) 1-1-1/1.1 Subparagraph 1-1-1/1.1.1 Item 1-1-1/1.1.1(a) Subitem 1-1-1/1.1.1(a)i) Appendix Appendix 1-1-A1 or Appendix 1-A1-1 Note: 1 An odd number (1, 3, 5, etc.) numbering system is used for the Rules. The purpose is to permit futur
17、e insertions of even-numbered paragraphs (2, 4, 6, etc.) of text and to avoid the necessity of having to renumber the existing text and associated cross-references, as applicable, within the Rules and associated process instructions, check sheets, etc. 2 ABSRULES FOR BUILDING AND CLASSING HIGH-SPEED
18、 CRAFT .2018 Notices and General Information Rule Change Notice (2018) TABLE 3 Summary of Changes from the 2017 Rules EFFECTIVE DATE 1 March 2017 shown as (1 March 2017) Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification High-Speed Craft 1-1-1/7 Scope of Classi
19、fication To align with the other sections of Part 1 regarding disclaimers of liability for the responsibilities of vessel owners/operators in this article. 1-1-6/11 (New) Plan Submittal To align ABS plan submittal process with our legal duty to protect client and third party intellectual property ri
20、ghts. EFFECTIVE DATE 1 May 2017 shown as (1 May 2017) Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification High-Speed Craft 1-1-4/3.1 Effective Date To remove the application of the six-month rules for Guides, which are meant for immediate implementation. (Incorp
21、orates Notice No. 2) EFFECTIVE DATE 1 January 2018 shown as (2018) Part/Para. No. Title/Subject Status/Remarks PART 1 Rules for Conditions of Classification High-Speed Craft 1-1-A2/5.1.5 Duplicate Product Design Assessment To clarify ABS policy for PDA-DUP issuance, confirmed by ABS Programs. EFFECT
22、IVE DATE 1 July 2017 shown as (1 July 2017) (based on the contract date for new construction between builder and Owner) Part/Para. No. Title/Subject Status/Remarks PART 3 Hull Construction and Equipment 3-2-8/17.1 Strength To reflect current practice for cover plates and address vortex shedding for
23、spade rudders with embedded trunks. (Incorporates Notice No. 1) 3-2-8/Figure 5 (New) To reflect current practice for cover plates and address vortex shedding for spade rudders with embedded trunks. (Incorporates Notice No. 1) 3-2-8/Figure 6 (New) To reflect current practice for cover plates and addr
24、ess vortex shedding for spade rudders with embedded trunks. (Incorporates Notice No. 1) 3-2-8/Figure 7 (New) To reflect current practice for cover plates and address vortex shedding for spade rudders with embedded trunks. (Incorporates Notice No. 1) 3-2-8/17.1.2 In way of Cutouts To reflect current
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS612018RULESFORBUILDINGANDCLASSINGHIGHSPEEDCRAFT2018PDF

链接地址:http://www.mydoc123.com/p-418534.html