1、 Part 7: Rules for Survey After Construction RULES FOR SURVEY AFTER CONSTRUCTION 2018 PART 7 (Updated February 2018 see next page) American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2017 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 North
2、chase Drive Houston, TX 77060 USA Updates February 2017 consolidation includes: January 2017 version plus Notice No. 1 and Corrigenda/Editorials Rule Change Notice (201 8 ) Rule Change Notice (2018) The effective date of each technical change since 1993 is shown in parenthesis at the end of the subs
3、ection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in parentheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994
4、) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 Listing by Effective Dates of Changes from the 2017 Rules The reference date which is indicated in the parentheses following the title of the requirement in this Part is the date that the requirement becomes effective e.g., 7-3-2/3.19.3(a)i) “Ballas
5、t Tanks” (1 July 2017) is to apply for vessels undergoing survey on or after 1 July 2017. Notice No. 1 (effective on 1 July 2017) to the 2017 Rules, which is incorporated in the 2018 Rules, is summarized below. EFFECTIVE DATE 1 July 2017 shown as (1 July 2017) Part/Para. No. Title/Subject Status/Rem
6、arks 7-3-2/1.1.2(j) To require sounding tube closures to be included in the Annual Survey. (Incorporates Notice No. 1) 7-3-2/3.19.3(a)i) Ballast Tanks To align the requirements with the latest IACS UR Z10.3 requirements. (Incorporates Notice No. 1) 7-6-2/1.1.8(e) (New) Harmonic Distortion To introdu
7、ce requirements for survey of harmonic filters and harmonic distortion levels, in line with IACS UR E24 June 2016. (Incorporates Notice No. 1) 7-A-11/17.12 Cladding on Taper To address the early multiple failures of tail shafts related to defects in cladding at transition region. (Incorporates Notic
8、e No. 1) 7-A-11/17.15 Final Examination To address the early multiple failures of tail shafts related to defects in cladding at transition region. (Incorporates Notice No. 1) 7-A-14/1.1 Survey and Maintenance Intervals To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliabilit
9、y and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/1.2iv) (New) Reliability Based Maintenance (RBM) To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/1.2v) (New) Design for Reliability (DFR)
10、 To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/1.3 Optional Notation To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice
11、 No. 1) 7-A-14/Table 1 (New) Program Definitions, Notations and References To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/3.3 Surveys To align Appendix 7-A-14 with the Guide for Surveys Based on Machin
12、ery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/5.1 General To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) ABSRULES FOR SURVEY AFTER CONSTRUCTION .2018 iii Part/Para. No. Title/
13、Subject Status/Remarks 7-A-14/5.3 Implementation Surveys To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/5.5 Machinery Status Indicators To align Appendix 7-A-14 with the Guide for Surveys Based on Mach
14、inery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/9 (Title) Annual Surveys and Reporting Planned Maintenance and Condition Monitoring To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No.
15、 1) 7-A-14/9.5ii) To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/11 (Title) Onboard Documentation Planned Maintenance and Condition Monitoring To align Appendix 7-A-14 with the Guide for Surveys Based
16、on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/15 Condition Monitoring To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/ 15.5.1(a)vi) Baseline Data To align Appen
17、dix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/ 15.5.2(a)ii) To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/ 15.5.2(
18、a)iii) To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/17 Reliability Based (RBM) or Reliability Centered Maintenance (RCM) To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliabi
19、lity and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/18.3 Optional Notation To align Appendix 7-A-14 with the Guide for Surveys Based on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) 7-A-14/18.5iii) To align Appendix 7-A-14 with the Guide for Surveys Ba
20、sed on Machinery Reliability and Maintenance Techniques. (Incorporates Notice No. 1) EFFECTIVE DATE 1 January 2018 shown as (2018) Part/Para. No. Title/Subject Status/Remarks 7-2-4 (Deleted) Survey After Ocean Transit Tow To remove redundant requirements (covered in Part 7 of the ABS MODU Rules). 7-
21、3-2/3.1.8 (New) Vessels other than Liquefied Gas Carriers Utilizing Gas or other Low Flash Point Fuels To align ABS rules with IACS and to further align ABS rules with the IGF Code and industry standards. 7-3-2/5.23.1 Containment Systems To account for limited access due to the configuration of the
22、containment system, that for CNG, the cargo containment system is not insulated, for higher pressures, that on CNG carriers are no interbarrier spaces, and that there could be large numbers of pressurized containers. 7-3-2/11.7.2 To align the requirements with the latest IACS UR Z10.2, Rev.33/6.4.2,
23、 UR Z10.4, Rev.14/6.4.2, UR Z10.5, Rev.16/6.4.2. iv ABSRULES FOR SURVEY AFTER CONSTRUCTION .2018 Part/Para. No. Title/Subject Status/Remarks 7-6-2/1.7 Vessels other than Liquefied Gas Carriers Utilizing Gas or other Low Flash Point Fuels To align ABS rules with IACS and to further align ABS rules wi
24、th the IGF Code and industry standards. 7-6-2/1.9 (Deleted) Vessels with Single or Dual Fuel Engines To align ABS rules with IACS and to further align ABS rules with the IGF Code and industry standards. 7-6-2/3.7 Vessels other than Liquefied Gas Carriers Utilizing Gas or other Low Flash Point Fuels
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS2PART72018RULESFORSURVEYAFTERCONSTRUCTION2018PART7PDF

链接地址:http://www.mydoc123.com/p-418511.html