1、Standard Method of Test for The California Bearing Ratio AASHTO Designation: T 193-13 American Association of State Highway and Transportation Officials 444 North Capitol Street N.W., Suite 249 Washington, D.C. 20001 TS-1a T 193-1 AASHTO Standard Method of Test for The California Bearing Ratio AASHT
2、O Designation: T 193-13 1. SCOPE 1.1. This test method covers the determination of the California Bearing Ratio (CBR) of pavement subgrade, subbase, and base/course materials from laboratory compacted specimens. The test method is primarily intended for, but not limited to, evaluating the strength o
3、f cohesive materials having maximum particle sizes less than 19 mm (3/4in.). 1.2. When materials having maximum particle sizes greater than 19 mm (3/4in.) are to be tested, this test method provides for modifying the gradation of the material so that the material used for tests all passes the 19.0-m
4、m (3/4-in.) sieve while the total gravel 4.75-mm (No. 4) to 75-mm (3-in.) fraction remains the same. While traditionally this method of specimen preparation has been used to avoid the error inherent in testing materials containing large particles in the CBR test apparatus, the modified material may
5、have significantly different strength properties than the original material. However, a large experience base has developed using this test method for materials for which the gradation has been modified and satisfactory design methods are in use based on the results of tests using this procedure. 1.
6、3. Past practice has shown that CBR results for those materials having substantial percentages of particles retained on the 4.75-mm (No. 4) sieve are more variable than for finer materials. Consequently, more trials may be required for these materials to establish a reliable CBR. 1.4. This test meth
7、od provides for the determination of the CBR of a material at optimum water content or a range of water content from a specified compaction test and a specified dry unit mass. The dry unit mass is usually given as a percentage of maximum dry unit mass from the compaction tests of T 99 or T 180. 1.5.
8、 The agency requesting the test shall specify the water content or range of water content and the dry unit mass for which the CBR is desired. 1.6. Unless specified otherwise by the requesting agency, or unless it has been shown to have no effect on test results for the material being tested, all spe
9、cimens shall be soaked prior to penetration. 1.7. The values stated in SI units are to be regarded as the standard. 2. REFERENCED DOCUMENTS 2.1. AASHTO Standards: M 92, Wire-Cloth Sieves for Testing Purposes M 145, Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes
10、 R 58, Dry Preparation of Disturbed Soil and Soil-Aggregate Samples for Test T 2, Sampling of Aggregates T 88, Particle Size Analysis of Soils 2015 by the American Association of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.TS-1a T 193-
11、2 AASHTO T 89, Determining the Liquid Limit of Soils T 90, Determining the Plastic Limit and Plasticity Index of Soils T 99, Moisture-Density Relations of Soils Using a 2.5-kg (5.5-lb) Rammer and a 305-mm (12-in.) Drop T 180, Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 4
12、57-mm (18-in.) Drop T 265, Laboratory Determination of Moisture Content of Soils 3. SIGNIFICANCE AND USE 3.1. This test method is used to evaluate the potential strength of subgrade, subbase, and base course material, including recycled materials, for use in road and airfield pavements. The CBR valu
13、e obtained in this test forms an integral part of several flexible pavement design methods. 3.2. For applications where the effect of compaction water content on CBR is small, such as cohesionless, coarse-grained materials, or where an allowance is made for the effect of differing compaction water c
14、ontents in the design procedure, the CBR may be determined at the optimum water content of a specified compaction effort. The dry unit mass specified is normally the minimum percent compaction allowed by using the agencys field compaction specification. 3.3. For applications where the effect of comp
15、action water content on CBR is unknown or where it is desired to account for its effect, the CBR is determined for a range of water content, usually the range of water content permitted for field compaction by using the agencys field compaction specification. 3.4. The criteria for test specimen prep
16、aration of self-cementing (and other) materials that gain strength with time must be based on a geotechnical engineering evaluation. As directed by the engineer, self-cementing materials shall be properly cured until bearing ratios representing long-term service conditions can be measured. 4. APPARA
17、TUS 4.1. MoldsThe molds shall be cylindrical in shape, made of metal, with an internal diameter of 152.40 0.66 mm (6.0 0.026 in.) and a height of 177.80 0.46 mm (7.0 0.018 in.), and provided with an extension collar approximately 50 mm (2.0 in.) in height and a perforated base plate that can be fitt
18、ed to either end of the mold. (See Figure 1.) It is desirable to have at least three molds for each soil to be tested. 2015 by the American Association of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.Figure 1California Bearing Ratio App
19、aratus TS-1aT193-3AASHTO 2015 by the American Association of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.Table of Measurements TRIPOD FOR DETERMINING EXPANSION SURCHARGE SPACER DISC MATERIAL STEEL * STEEL * DIMENSION A B C D E F G H I
20、J K L* M* N* P METRIC, mm 6.3 12.7 63.5 120.6 9.5 1.6 152.4 190.5 76.2 95.2 19.0 54.0 149.2 150.8 61.37 TOLERANCE, mm 1.6 0.8 0.25 ENGLISH, in. 6 3 2.416 TOLERANCE, in. 0.01 MOLD WITH EXTENSION COLLAR PISTON MATERIAL STEEL* STEEL* DIMENSION A E F G* O P Q T* U* V* W X Y Z A R S* METRIC, mm 6.3 9.5 1
21、.6 152.40 177.80 61.37 88.9 158.0 238.1 165.1 212.7 23.8 33.3 50.8 6.3 69.8 49.63 TOLERANCE, mm 0.66 0.46 0.25 0.13 ENGLISH, in. 6 7 2.416 2 1.954 TOLERANCE, in. 0.026 0.018 0.01 0.005 ADJUSTABLE STEM AND PLATE MATERIAL BRONZE DIMENSION c d e* f g h k m n* p* r s t METRIC, mm 5.6 11.9 3.2 46.04 50.8
22、 69.8 75.4 19.0 28.6 9.5 6.3 107.9 149.2 TOLERANCE, mm 1.6 ENGLISH, in. 2 TOLERANCE, in. Figure 1California Bearing Ratio Apparatus (Continued) 41212124348316121743343812875161551613214183161213327683921683816151651414323273215811613143232312438118341414875161TS-1aT193-4AASHTO 2015 by the American A
23、ssociation of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.TS-1a T 193-5 AASHTO 4.2. Spacer DiskA circular spacer disk made of metal 150.8 0.8 mm (515/16 1/32in.) in diameter and 61.37 0.25 mm (2.416 0.01 in.) in height. (See Figure 1.)
24、 Note 1When using molds having a height of 177.80 mm (7.0 in.) (Figure 1), a spacer disk height of 61.37 mm (2.416 in.) is needed to obtain a thickness of compacted specimen that conforms to the thickness: 116.43 mm (4.584 in.) of specimens in T 99 and T 180. 4.3. RammerA rammer as specified in eith
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOT1932013STANDARDMETHODOFTESTFORTHECALIFORNIABEARINGRATIOPDF

链接地址:http://www.mydoc123.com/p-418138.html