AASHTO HB-17 DIVISION II SEC 22-2002 Division II Construction - Slope Protection《防滑》.pdf
《AASHTO HB-17 DIVISION II SEC 22-2002 Division II Construction - Slope Protection《防滑》.pdf》由会员分享,可在线阅读,更多相关《AASHTO HB-17 DIVISION II SEC 22-2002 Division II Construction - Slope Protection《防滑》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Section 22 SLOPE PROTECTION 22.1 GENERAL 22.1.1 Description This work shall consist of the construction of bank and slope protection courses in accordance with these Speci- fications and in reasonably close conformity with the lines, grades, and thicknesses shown on the plans or es- tablished by the
2、 Engineer. 22.1.2 Types Types of slope protection are designated as follows: (1) Riprap Hand-Placed Riprap-hand-placed stones on earth Machine-Placed Riprap-machine-placed stones on Wire-Enclosed Riprap (Gabions)-stones placed in Grouted Riprap-hand-placed riprap as described Sacked Concrete Riprap-
3、hand-placed sacked con- or gravel bedding. earth or gravel bedding. wire fabric enclosures. above with voids filled with sand-cement grout. crete. (2) Concrete Slope Paving Cast-in-Place Slope Paving-Portland cement con- crete, pneumatically applied mortar or, when per- mitted, fabric forms filled w
4、ith structural concrete grout. (3) Precast Concrete Slope Paving-Portland cement concrete slabs, blocks, or shapes precast prior to place- ment. 22.2 WORKING DRAWINGS Whenever specified or requested by the Engineer, the Contractor shall provide working drawings with design calculations and supportin
5、g data in sufficient detail to per- mit a structural review of the proposed design of a slope protection system. When concrete is involved, such data shall include the sequence and rate of placement. Suffi- cient copies shall be furnished to meet the needs of the En- gineer and other entities with r
6、eview authority. The work- ing drawings shall be submitted sufficiently in advance of proposed use to allow for their review, revision, if needed, and approval without delay to the work. The Contractor shall not start the construction of any slope protection system for which working drawings are req
7、uired until the drawings have been approved by the En- gineer. Such approval will not relieve the Contractor of re- sponsibility for results obtained by use of these drawings or any other responsibilities under the contract. 22.3 MATERIALS 22.3.1 Aggregate Aggregate for riprap shall conform to the r
8、equirements of Subsection 703.16 of the AASHTO Guide Spec$ca- tions for Highway Construction. Aggregate for underdrains and filter blankets shall conform to Sections 704 and 705, respectively, of the AASHTO Guide Specijications for Highway Construction. 22.3.2 Wire-Enclosed Riprap (Gabions) Gabions
9、shall be constructed of wire mesh. The wire mesh shall be made of galvanized steel wire having a min- imum size of 0.120-inch diameter (U.S. Wire Gage No. 11). The tensile strength of the wire shall be in the range of 60,000 to 85,000 psi, determined in accordance with ASTM A 392. The minimum zinc c
10、oating of the wire shall be 0.80 oz/sq ft of uncoated wire surface as determined in accordance with ASTM A 90. Selvedge, tie, and connection wire shall meet the same strength and coating requirements specified above for wire used in the wire mesh. 22.3.3 Filter Fabric Filter fabric shall meet the re
11、quirements of Subsection 705.03 of the AASHTO Guide Specijications for Highway Construction. 645 646 HIGHWAY BRIDGES 22.3.4 22.3.4 Grout Grout shall consist of one part Portland cement and three parts of sand, thoroughly mixed with water to pro- duce a workable mix. 22.3.5 Sacked Concrete Riprap Con
12、crete for sacked concrete riprap shall consist of a mixture of clean pitrun or washed sand and gravel, cement and water. The mixture shall contain not less than 376 pounds of Portland cement per cubic yard and sufficient water to obtain a slump of 3 to 5 inches. Sacks for sacked concrete riprap shal
13、l be made of 10-ounce burlap or other fabric having equal or greater strength. Sacks shall be approximately 19% inches by 36 inches measured inside the seams when the sack is laid flat, with an approximate capacity of 1.25 cubic feet. Sound, reclaimed sacks may be used. 22.3.6 Portland Cement Concre
14、te Portland cement concrete for cast-in-place slope paving shall conform to the provisions in Section 8, “Con- crete Structures,” for Class B or Class B (AE) concrete using the 1-inch maximum combined grading. Expansion joint filler shall conform to the provisions in Article 8.9.2.1. 22.3.7 Pneumati
15、cally Applied Mortar Materials for pneumatically applied mortar shall con- form to the requirements of Section 24, “Pneumatically Applied Mortar.” 22.3.8 Precast Portland Cement Concrete Blocks and Shapes Precast Portland cement concrete blocks and shapes shall meet the requirements of ASTM C 129, C
16、 139, or C 145, grade as specified. Materials for precast Portland ce- ment concrete slabs shall conform to the requirements in Article 8.13. “Precast Concrete Members.” 22.3.9 Reinforcing Steel Reinforcement shall conform to the provisions in Sec- tion 9, “Reinforcing Steel.” 22.3.10 Geocomposite D
17、rain Geocomposite drain shall consist of a manufactured core with one or both sides covered with a layer of filter fabric. The manufactured core shall be a preformed grid of embossed plastic, a mat of random shapes of plastic fibers, a drainage net consisting of a uniform pattern of poly- meric stra
18、nds forming two sets of continuous flow chan- nels, a system of plastic pillars and interconnections form- ing a semi-rigid mat, or other system approved by the Engineer, which will conduct the flow of water designated on the plans or in the special provisions. Filter fabric shall conform to the req
19、uirements of Arti- cle 22.3.3 and shall be integrally bonded to the core ma- terial. The Contractor shall furnish to the Engineer a signed certification from the manufacturer stating that the geocomposite drain proposed for use is capable of withstanding design loadings at all planned locations with
20、out appreciably decreasing the carrying capacity of the designed drainage voids for the entire height or length of the drain. 22.4 CONSTRUCTION 22.4.1 Preparation of Slopes Slopes shall be shaped to allow the full thickness of the specified slope protection and any bedding or filter gravel, where re
21、quired. Slopes shall not be steeper than the natural angle of repose of the slope specified in the contract. Where the slopes cannot be excavated to undisturbed material, the underlying material shall be compacted to 95% standard density per AASHTO T 99. 22.4.2 Bedding When called for on the plans,
22、a layer of filter gravel or filter fabric shall be placed on the slope immediately prior to placement of the riprap or slope paving. The layer of fil- ter gravel shall be shaped to provide the minimum thick- ness specified. 22.4.3 Filter Fabric When specified in the contract, filter fabric shall be
23、spread uniformly over the prepared slope or surface. The fabric shall be unrolled directly on the surface to the lines and dimensions shown. The filter fabric shall be lapped a minimum of 12 inches in each direction and shall be an- chored in position with approved anchoring devices. The Contractor
24、shall place the riprap in a manner that will not tear, puncture, or shift the fabric. Tracked or wheeled equipment will not be permitted on the fabric covered slopes. 22.4.4 DIVISION II-CONSTRUCTION 647 22.4.4 Geocomposite Drain Geocomposite drains shall be installed at locations shown on the plans,
25、 described in the special provisions, and where directed by the Engineer. Collection and dis- charge systems shall be installed as shown on the plans or as directed by the Engineer. Core material manufactured from impermeable plastic sheeting having connecting corrugations shall be placed with the c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOHB17DIVISIONIISEC222002DIVISIONIICONSTRUCTIONSLOPEPROTECTION 防滑 PDF

链接地址:http://www.mydoc123.com/p-417589.html