1、1.1 GENERAL Section 1 STRUCTURE EXCAVATION AND BACKFILL Structure excavation shall consist of the removal of all material, of whatever nature, necessary for the construc- tion of foundations for bridges, retaining walls, and other major structures in accordance with the plans or as di- rected by the
2、 Engineer. If not otherwise provided for in the contract, struc- ture excavation shall include the furnishing of all neces- sary equipment and the construction and subsequent removal of all cofferdams, shoring, and water control systems which may be necessary for the execution of the work. It shall
3、also include, if not otherwise specified, the placement of all necessary backfill, including any neces- sary stockpiling of excavated material which is to be used in backfill, and the disposing of excavated material, which is not required for backfill, in roadway embankments or as provided for exces
4、s and unsuitable material in Subsec- tion 203.02, AASHTO Guide SpeciJications for Highway Construction. If the contract does not include a separate pay item or items for such work, structure excavation shall include all necessary clearing and grubbing and the re- moval of existing structures within
5、the area to be exca- vated. Classification, if any, of excavation will be indicated on the plans and set forth in the proposal. The removal and disposal of buried natural or manmade objects are included in the class of excavation in which they are located, unless such removal and disposal are includ
6、ed in other items of work. However, in the case of a buried manmade object, if (I) its removal requires the use of methods or equipment not used for other excavation on the project, (2) its presence was not indicated on the plans or in the special provisions, (3) its presence could not have been asc
7、ertained by site investigation, including contact with identified utilities within the area, and (4) the Contractor so requests in writing prior to its removal, the removal and disposal of such object will be paid for as extra work, and its volume will not be included in the measured quantity of exc
8、avation. 1.2 WORKING DRAWINGS Whenever specified, the Contractor shall provide working drawings, accompanied by calculations where appropriate, of excavation procedures, embankment con- struction and backfilling operations. This plan shall show the details of shoring, bracing, slope treatment or oth
9、er protective system proposed for use and shall be accompa- nied by design calculations and supporting data in suffi- cient detail to permit an engineering review of the pro- posed design. The working drawings and plans for protection from caving shall be submitted sufficiently in advance of pro- po
10、sed use to allow for their review, revision, if needed, and approval without delay to the work. Working drawings must be approved by the Engineer prior to performance of the work involved and such ap- proval shall not relieve the Contractor of any responsibil- ity under the contract for the successf
11、ul completion of the work. 1.3 MATERIALS Material used for backfill shall be free of frozen lumps, wood or other degradable matter and shall be of a grading such that the required compaction can be consistently ob- tained using the compaction methods selected by the Con- tractor. Permeable material
12、for underdrains shall conform to AASHTO Guide Specijcations for Highway Construc- tion, Subsection 704.01. 1.4 CONSTRUCTION 1.4.1 Depth of Footings The elevation of the bottoms of footings, as shown on the plans, shall be considered as approximate only and the Engineer may order, in writing, such ch
13、anges in dimen- sions or elevation of footings as may be necessary to se- cure a satisfactory foundation. 477 478 HIGHWAY BRIDGES 1.4.2 1.4.2 Foundation Preparation and Control of Water 1.4.2.1 General All substructures, where practical, shall be constructed in open excavation and, where necessary,
14、the excavation shall be shored, braced, or protected by cofferdams con- structed in accordance with the requirements contained in Article 3.3, “Cofferdams and Shoring.” When footings can be placed in the dry without the use of cofferdams, backforms may be omitted with the approval of the Engi- neer,
15、 and the entire excavation filled with concrete to the required elevation of the top of the footing. The additional concrete required shall be furnished and placed at the ex- pense of the Contractor. Temporary water control systems shall conform to the requirements contained in Article 3.4, “Tempora
16、ry Water Control Systems.” 1.4.2.2 Excavations Within Channels When excavation encroaches upon a live stream bed or channel, unless otherwise permitted, no excavation shall be made outside of caissons, cribs, cofferdams, steel pil- ing, or sheeting, and the natural stream bed adjacent to the structu
17、re shall not be disturbed without permission from the Engineer. If any excavation or dredging is made at the site of the structure before caissons, cribs, or cofferdams are sunk or are in place, the Contractor shall, without extra charge, after the foundation base is in place, backfill all such exca
18、vation to the original ground surface or river bed with material satisfactory to the Engineer. Material tem- porarily deposited within the flow area of streams from foundation or other excavation shall be removed and the stream flow area freed from obstruction thereby. 1.4.2.3 Foundations on Rock Wh
19、en a foundation is to rest on rock, the rock shall be freed from all loose material, cleaned and cut to a firm sur- face, either level, stepped, or roughened, as may be di- rected by the Engineer. All seams shall be cleaned out and filled with concrete, mortar, or grout before the footing is placed.
20、 Where blasting is required to reach footing level, any loose, fractured rock caused by overbreak below bearing level shall be removed and replaced with concrete or grouted at the Contractors expense. 1.4.2.4 Other Foundations When a foundation is to rest on an excavated surface other than rock, spe
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOHB17DIVISIONIISEC12002DIVISIONIICONSTRUCTIONSTRUCTUREEXCAVATIONANDBACKFILL 结构 挖掘 回填 PDF

链接地址:http://www.mydoc123.com/p-417575.html