ABS 2 PART 7-2017 RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7.pdf
《ABS 2 PART 7-2017 RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7.pdf》由会员分享,可在线阅读,更多相关《ABS 2 PART 7-2017 RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7.pdf(663页珍藏版)》请在麦多课文档分享上搜索。
1、 Part 7: Rules for Survey After Construction RULES FOR SURVEY AFTER CONSTRUCTION 2017 PART 7 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2016 American Bureau of Shipping. All rights reserved. ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA Rule
2、 Change Notice (201 7 ) Rule Change Notice (2017) The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in parentheses refer to the following e
3、ffective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993 Listing by Effective Dates of Changes from the 2016 Rules The reference date which is indicated in
4、 the parentheses following the title of the requirement in this Part is the date that the requirement becomes effective e.g., 7-3-2/3.15.3(a)i) “Ballast Tanks” (1 July 2016) is to apply for vessels undergoing survey on or after 1 July 2016. Notice No. 1 (effective on 1 July 2016) to the 2016 Rules,
5、which is incorporated in the 2017 Rules, is summarized below. EFFECTIVE DATE 1 July 2016 shown as (1 July 2016) Part/Para. No. Title/Subject Status/Remarks 7-3-1/13 Vessels with the SH, SHCM or CSR, AB-CM Notation To specify that areas identified as critical areas should be specially considered when
6、 preforming visual examination of spaces. (Incorporates Notice No. 1) 7-3-2/3.15.3(a)i) Ballast Tanks To align the requirements with IACS requirements. (Incorporates Notice No. 1) 7-3-2/5.7.4(a)iv) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurement
7、s taken. (Incorporates Notice No. 1) 7-3-2/5.7.4(b)vi) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.7.4(c)vi) To clarify that vessels parts that are inaccessible need not be surveyed or have thickne
8、ss measurements taken. (Incorporates Notice No. 1) 7-3-2/5.7.4(d)vi) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.13.6(b) Note i) To clarify that what is to be included in the tank testing procedure
9、. (Incorporates Notice No. 1) 7-3-2/5.14.6(b) Note i) To clarify that what is to be included in the tank testing procedure. (Incorporates Notice No. 1) 7-3-2/5.15.4(a)iii) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Not
10、ice No. 1) 7-3-2/5.15.4(b)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.15.4(c)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (In
11、corporates Notice No. 1) 7-3-2/5.15.4(d)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.19.4(a)iii) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measure
12、ments taken. (Incorporates Notice No. 1) ii ABSRULES FOR SURVEY AFTER CONSTRUCTION .2017 Part/Para. No. Title/Subject Status/Remarks 7-3-2/5.19.4(b)iii) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.
13、19.4(b)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.19.4(c)iii) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice
14、 No. 1) 7-3-2/5.19.4(c)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.19.4(d)iii) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Inc
15、orporates Notice No. 1) 7-3-2/5.19.4(d)v) To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) 7-3-2/5.21.6(b) Note i) To clarify that what is to be included in the tank testing procedure. (Incorporates Notice No.
16、1) 7-A-16/Table 7 Minimum Requirements for CLOSE-UP Examination at Special Periodical Surveys Bulk Carriers Non Double Skin ESP and Bulk Carrier Features of Combination Carriers Non Double Skin ESP To clarify that vessels parts that are inaccessible need not be surveyed or have thickness measurement
17、s taken. (Incorporates Notice No. 1) 7-A-16/Table 11 Minimum Requirements for CLOSE-UP Examination at Special Periodical Surveys Tankers ESP (Oil Carriers and Oil Carrier Features of Combination Carriers Double Hull) and Oil/Fuel Oil Tank Barges Double Hull 122 meters (400 feet) and over in Length T
18、o clarify the requirements for survey for structural elements. (Incorporates Notice No. 1) 7-A-16/Table 15 Minimum Requirements for CLOSE-UP Examination at Special Periodical Surveys Bulk Carriers Double Skin ESP and Bulk Carrier Features of Combination Carriers Double Skin ESP To clarify that vesse
19、ls parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1) EFFECTIVE DATE 1 January 2017 shown as (2017) Part/Para. No. Title/Subject Status/Remarks 7-1-1/1.7.1(b) Bulk Carrier To align the requirements with IACS UR Z11 Rev. 5. 7-1-1/1.7.1(c
20、) Ore Carrier To align the requirements with IACS UR Z11 Rev. 5. 7-2-1/13.3.1(a) Extension up to Three (3) Months To clearly specify the “two-and-a-half year extension”. 7-2-1/13.3.1(b) Extension up to One (1) Year To clearly specify the “two-and-a-half year extension”. 7-3-2/1.13.4 Cargo Pump Room
21、To incorporate requirements from OCIMF 1.e) and ISGOTT 10.11.3. 7-3-2/1.21 (New) Compressed Natural Gas Carriers To consolidate survey requirements by relocating the requirements from the ABS Guide for Vessels Intended to Carry Compressed Natural Gas in Bulk. 7-3-2/5.23 (New) Compressed Natural Gas
22、Carriers To consolidate survey requirements by relocating the requirements from the ABS Guide for Vessels Intended to Carry Compressed Natural Gas in Bulk. 7-5-1/3.37 Alternative Means To clarify that a tailshaft condition monitoring system and/or similar program are acceptable in lieu of meeting so
23、me requirements for other systems. ABSRULES FOR SURVEY AFTER CONSTRUCTION .2017 iii Part/Para. No. Title/Subject Status/Remarks 7-6-2/3.1.1(t) Fixed Gas and Foam Extinguishing Systems To clarify the titles of the sections. 7-6-2/3.1.1(u) Fixed Water Spray and Mist Systems To clarify the titles of th
24、e sections. 7-7-1/9 Hydrostatic Testing To clarify the requirements. 7-9-6/3.1 Annual Surveys To provide sets of tests required to be done annually. 7-9-6/3.5 Special Surveys To provide sets of tests required to be done annually. 7-9-23 Inventory of Hazardous Materials To consolidate survey requirem
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS2PART72017RULESFORSURVEYAFTERCONSTRUCTION2017PART7PDF

链接地址:http://www.mydoc123.com/p-400768.html