ABS 2 PART 7-2016 RULES FOR SURVEY AFTER CONSTRUCTION 2016 PART 7.pdf
《ABS 2 PART 7-2016 RULES FOR SURVEY AFTER CONSTRUCTION 2016 PART 7.pdf》由会员分享,可在线阅读,更多相关《ABS 2 PART 7-2016 RULES FOR SURVEY AFTER CONSTRUCTION 2016 PART 7.pdf(649页珍藏版)》请在麦多课文档分享上搜索。
1、 Updates February 2016 consolidation includes: January 2016 version plus Corrigenda/Editorials Rule Change Notice (201 6 ) Rule Change Notice (2016) The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Pa
2、rt. Unless a particular date and month are shown, the years in parentheses refer to the following effective dates: (2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993
3、 Listing by Effective Dates of Changes from the 2015 Rules The reference date which is indicated in the parentheses following the title of the requirement in this Part is the date that the requirement becomes effective e.g., 7-3-2/1.1.8 “Structural Fire Protection” (1 July 2015) is to apply for vess
4、els undergoing survey on or after 1 July 2015. Notice No. 1 (effective on 1 July 2015) to the 2015 Rules, which is incorporated in the 2016 Rules, is summarized below. EFFECTIVE DATE 1 July 2015 shown as (1 July 2015) Part/Para. No. Title/Subject Status/Remarks 7-3-1/13 Vessels with the SH, SHCM Not
5、ation To specify that areas identified as critical areas in the SHCM plan should be specially considered when preforming visual examination of spaces. (Incorporates Notice No. 1) 7-3-2/1.1.8 Structural Fire Protection To provide more detailed instructions for Surveyors. (Incorporates Notice No. 1) 7
6、-4-1/1xvi) To clarify the requirements. (Incorporates Notice No. 1) 7-4-1/1xxvi) (New) To align the requirements with Section 3-2-13 of the Steel Vessel Rules. (Incorporates Notice No. 1) 7-4-1/1xxvii) (New) To align the requirements with 4-3-3/9.5 of the Steel Vessel Rules. (Incorporates Notice No.
7、 1) 7-6-2/1.1.9(g) Fixed Fire Fighting System To provide more detailed instructions for Surveyors. (Incorporates Notice No. 1) 7-6-2/3.1.1(t) (New) CO2 and Foam Systems To provide more detailed instructions for Surveyors. (Incorporates Notice No. 1) 7-6-2/3.1.1(u) (New) Fixed Water Spray Systems To
8、provide more detailed instructions for Surveyors. (Incorporates Notice No. 1) 7-9-16 Crew Habitability on Ships To consolidate the survey requirements for ship and workboat Habitability notations in Part 7. (Incorporates Notice No. 1) 7-9-17 Crew Habitability on Ships To consolidate the survey requi
9、rements for ship and yacht Comfort notations in Part 7. (Incorporates Notice No. 1) 7-9-18 (New) Compliance with the ILO Maritime Labour Convention, 2006 Title 3 Requirements To consolidate the survey requirements for Accommodation notations in Part 7. (Incorporates Notice No. 1) 7-9-19 Yachts To al
10、ign the requirements with the new Yacht Guide. (Incorporates Notice No. 1) ABSRULES FOR SURVEY AFTER CONSTRUCTION .2016 iii EFFECTIVE DATE 1 January 2016 shown as (2016) Part/Para. No. Title/Subject Status/Remarks 7-2-1/5.5 Unusual Cases To specify requirements for laid-up vessels. 7-2-1/13 Tailshaf
11、t Surveys To update procedures and methods for tailshaft surveys. 7-3-2/5.1.14(e) To clarify that only mast connection points are to be examined, not the rigging, sails, or spars. 7-3-2/9.5.2 To align the requirements with IACS UR Z10.1, Z10.2, Z10.3, Z10.4, and Z10.5 and to refer to the ABS Health
12、and Safety Manual. 7-3-2/9.5.9 (Deleted) To remove requirements covered by IACS PR 37, which are covered in the ABS Health and Safety Manual. 7-3-2/9.5.10 (Deleted) To remove requirements covered by IACS PR 37, which are covered in the ABS Health and Safety Manual. 7-3-2/11.5.6 To align the requirem
13、ents with IMO Ship Construction File Guidelines. 7-3-2/11.7 (New) Review of Documentation on Board To align the requirements with IMO Ship Construction File Guidelines. 7-5-1/1 (New) General To update procedures and methods for tailshaft surveys. 7-5-1/3 (New) Definitions To update procedures and me
14、thods for tailshaft surveys. 7-5-1/5 (New) Oil Lubricated Shafts or Closed Loop System Fresh Water Lubricated Shafts (Closed System) To update procedures and methods for tailshaft surveys. 7-5-1/7 (New) Water Lubricated Shafts (Open Systems) To update procedures and methods for tailshaft surveys. 7-
15、6-2/1.5.1ii) Operating and Maintenance Instruction Manual To clarify that the Operating and Maintenance Instruction Manual is not required to be approved. 7-6-2/1.7.1ii) Operating and Maintenance Instruction Manual To clarify that the Operating and Maintenance Instruction Manual is not required to b
16、e approved. 7-6-2/3.1.2(a) Main and Auxiliary Internal Combustion Engines To specify that medium speed diesels should not be treated differently than slow speed diesels. 7-9-10/3 (New) Vessels with SPS Notation To provide ship-specific requirements for equipment, safety devices, and documentation fo
17、r OSVs. 7-9-10/5 (New) Offshore Supply Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/7 (New) Vessels with the Supply HNLS Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-1
18、0/9 (New) Vessels with the AH, TOW, and AH, TOW Notations To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/11 (New) Vessels with the ROV Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-
19、9-10/13 (New) Vessels with the ROV Capable and DSV Capable Notations To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/15 (New) Vessels with the DSV Notation To provide ship-specific requirements for equipment, safety devices, and documentation f
20、or OSVs. 7-9-10/17 (New) Vessels with the Pipe Lay Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/19 (New) Vessel with the Heavy Lift Notation To provide ship-specific requirements for equipment, safety devices, and documentation for
21、OSVs. 7-9-10/21 (New) Vessels with the Escort or QR Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. iv ABSRULES FOR SURVEY AFTER CONSTRUCTION .2016 Part/Para. No. Title/Subject Status/Remarks 7-9-10/23 (New) Vessels with the WIND-IMR Notation
22、 To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/25 (New) Vessels with the Cable Lay Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/27 (New) Vessels with the WI Notation To provi
23、de ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/29 (New) Vessels with in the WI-Ready Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/31 (New) Vessels with the WI-Temp Notation To provide
24、 ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/33 (New) Well Intervention Vessels with no Specific Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs. 7-9-10/35 (New) OSV Well Stimulation Vessel with
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS2PART72016RULESFORSURVEYAFTERCONSTRUCTION2016PART7PDF

链接地址:http://www.mydoc123.com/p-400767.html