API RP 11S6-1995 Recommended Practice for Testing of Electric Submersible Pump Cable Systems (FIRST EDITION)《电动潜水泵电缆系统的测试》.pdf
《API RP 11S6-1995 Recommended Practice for Testing of Electric Submersible Pump Cable Systems (FIRST EDITION)《电动潜水泵电缆系统的测试》.pdf》由会员分享,可在线阅读,更多相关《API RP 11S6-1995 Recommended Practice for Testing of Electric Submersible Pump Cable Systems (FIRST EDITION)《电动潜水泵电缆系统的测试》.pdf(27页珍藏版)》请在麦多课文档分享上搜索。
1、Recommended Practice for Testing of Electric Submersible Pump Cable SystemsAPI RECOMMENDED PRACTICE 11S6FIRST EDITION, DECEMBER 1, 1995REAFFIRMED, OCTOBER 2013Recommended Practice for Testing of Electric Submersible Pump Cable SystemsUpstream SegmentAPI RECOMMENDED PRACTICE 11S6FIRST EDITION, DECEMB
2、ER 1, 1995REAFFIRMED, OCTOBER 2013SPECIAL NOTES API publications necessarily address problems of a general nature. With respect to par- ticular circumstances, local, state, and federal laws and regulations should be reviewed. API is not undertaking to meet the duties of employers, manufacturers, or
3、suppliers to warn and properly train and equip their employees, and others exposed, Concerning health and safety risks and precautions, nor undertaking their obligations under local, state, or fed- eral laws. Information concerning safety and health risks and proper precautions with respect to parti
4、cular materials and conditions should be obtained from the employer, the manufac- turer or supplier of that material, or the material safety data sheet. Nothing contained in any API publication is to be consirued as granting any right, by implication or otherwise, for the manufacture, sale, or use o
5、f any method, apparatus, or product covered by letters patent. Neither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent. Generally, API publications are reviewed and revised, reaffirmed, or withdrawn at least every 5 ye
6、ars. Sometimes a one-time extension of up to 2 years will be added to this re- view cycle. This publication will no longer be in effect 5 years after its publication date as an operative API publication or, where an extension has been granted, upon republication. Status of the publication can be asc
7、ertained from the API Authoring Department. A catalog of API publications and materials is published annually and updated quarterly by API, 1220 L Street, N.W., Washington, D.C. 20005. This document was produced under API standardization procedures that ensure appro- priate notification and particip
8、ation in the developmental process and is designated an API standard. Questions concerning the interpretation of the content of this document or com- ments and questions Concerning the procedures under which this standard was developed should be directed in writing to the director of the Exploration
9、 and Production Department, American Petroleum Institute, 1220 L Street, N.W., Washington, D.C. 20005. Requests for permission to reproduce or translate all or any part of the material published herein should also be addressed to the director. API publications may be used by anyone desiring to do so
10、. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this pub- lication and hereby expressly disclaims any liability or responsibility for loss or
11、damage resulting from its use or for the violation of any federal, state, or municipal regulation with which this publication may conflict. API standards are published to facilitate the broad availability of the information con- tained therein. These documents are not intended to obviate the need fo
12、r applying sound engineering judgment regarding when and where this information should be utilized. The formulation and publication of API standards is not intended in any way to inhibit anyone from using any other data, information, or practices. Any manufacturer marking equipment or materials in c
13、onformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that such prod- ucts do in fact conform to the applicable API standard. All rights reserved. No part of
14、 this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording, or other- wise, without prior written permission from the publisher. Contact API Publications Manager, 1220 L Street, N.W., Washington, DC 20005. Copyright 63 199
15、5 American Petroleum Institute API RPxLLSb 95 0732290 O549402 BBB m Contents Page 1 SCOPE 1.1 General . 1.1 Organization . 1.2 Jurisdiction 2 DEFINITIONS 2.1 ACTests 2.2 Acceptance Testing 2.3 Conductor Resistance 2.4 Connectors 2.5 DCTests 2.6 Diagnostic Testing . 2.7 Grounding Stick (Discharge Res
16、istor) . 2.8 High Potential (Hi-Pot) Tests 2.9 InsulationConductance . 2.10 Insulation Impedance . 2.11 Insulation Resistance 2.12 IRTests 2.13 Leakagecurrent . 2.14 In-Situ Testing . 2.15 Megohmmeter Tests 2.16 Penetrators 2.17 Potheads . 2.18 PowerFactor 2.19 Maintenance Testing 2.20 Time Domain R
17、eflectometer (TDR) 3.1 Description 3.2 Application 3 INSULATIONPROPERTIES 3.3 Limitations 3.4 Procedure . 4 SAFETY . 4.1 Description 4.2 Application 4.3 Procedures . 5 VISUAL INSPECTION . 5.1 Description 5.2 Application 5.3 Limitations 5.4 Procedure . 5.4.1 Armor . 5.4.2 Jacket . 5.4.3 Insulation Co
18、verings . 5.4.4 Insulation 5.4.5 Conductors . 5.4.6 Motor Lead Extension 1 Pothead 5.4.7 Connecting Devices 6 CABLE SYSTEM PREPARATION . 6.1 Description 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 5 6 6 6 6 7 7 7 7 7 7 7 7 7 7 8 8 8 8 API RP*:LLSb 95 D 0732290 0549403 714 D 6.2 Applica
19、tion 6.3 Limitations . 6.4 Procedure . 6.4.1 Cable With Connecting Devices 6.4.2 Cable Without Connecting Devices 7 ACCEPTANCE TESTING 7.1 Description 7.2 Application 7.3 Limitations 8 MAINTENANCE (PROOF) TESTING . 8.1 Description 8.2 Application 8.3 Limitations 9 IN-SITUTESTING 9.1 Description 9.2
20、Application 9.3 Limitations 10 DIAGNOSTIC (FAULT) TESTING . 10.1 Description . 10.2 Application . 10.3 Limitations . 11.1 Description . 11.3 Limitations . 11 INSULATION RESISTANCE (MEGOHMMETER) TESTS 1 1.2 Application . 1 1.4 Test Procedure . 12 DC HIGH POTENTIAL TESTS 12.1 Description . 12.2 Applic
21、ation . 12.3 Limitations . 12.4 Test Procedure . 13 ACTESTING . 13.1 Description . 13.2 Application . 13.3 Limitations . 14 FAULT LOCATION TESTS . 14.1 Murry Loop (Bridge Fault Locator) Tests 14.1.1 Description 14.1.2 Application 14.1.3 Limitations 14.1.4Procedure . 14.2 Capacitive Discharge Instrum
22、ent (Thumper) . 14.2.1 Description 14.2.2 Application 14.2.3 Limitations 14.2.4 Procedure . 14.3 Time Domain Reflectometer (TDR) Tests . 14.3.1 Description 14.3.2 Application 8 8 8 8 9 10 10 10 10 11 11 11 11 11 11 11 11 11 11 11 12 12 12 12 12 12 13 13 13 13 14 14 14 14 15 15 15 15 16 16 16 16 16 1
23、6 16 16 16 16 16 iv . API RP*LLSb 95 0732290 0549404 6.50 14.3.3 Limitations 17 14.3.4 Test Procedures . 18 Figures 1-Cable with Male Connecting Device Isolated with High-Dielectic, 2-Positioning of High-Dielectic. Nonadhering. 3-Cable with Female Connecting Device Isolated with Insulated Extension
24、4-Positioning of a Molded Test Plug over the Contacts of a Pothead 5-Basic Circuit Diagram of a Phase to Armor Fault Location Test Nonadhering. Preshrunk Sleeves 9 Preshrunk Sleeve on Male Connector . 9 Pins . 10 10 17 Tables 1-High-Voltage Testing Requirements 3 2-K factors (megohm-kft) for Polypro
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APIRP11S61995RECOMMENDEDPRACTICEFORTESTINGOFELECTRICSUBMERSIBLEPUMPCABLESYSTEMSFIRSTEDITION 电动 潜水泵 电缆

链接地址:http://www.mydoc123.com/p-399979.html