ASTM D5503 - 94(2008) Standard Practice for Natural Gas Sample-Handling and Conditioning Systems for Pipeline Instrumentation (Withdrawn 2017).pdf
《ASTM D5503 - 94(2008) Standard Practice for Natural Gas Sample-Handling and Conditioning Systems for Pipeline Instrumentation (Withdrawn 2017).pdf》由会员分享,可在线阅读,更多相关《ASTM D5503 - 94(2008) Standard Practice for Natural Gas Sample-Handling and Conditioning Systems for Pipeline Instrumentation (Withdrawn 2017).pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D5503 94 (Reapproved 2008)Standard Practice forNatural Gas Sample-Handling and Conditioning Systems forPipeline Instrumentation1This standard is issued under the fixed designation D5503; the number immediately following the designation indicates the year oforiginal adoption or, in the c
2、ase of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers sample-handling and conditioningsystems for typical pipeline monitor
3、ing instrumentation (gaschromatographs, moisture analyzers, and so forth). The selec-tion of the sample-handling and conditioning system dependsupon the operating conditions and stream composition.1.2 This practice is intended for single-phase mixtures thatvary in composition. A representative sampl
4、e cannot be ob-tained from a two-phase stream.1.3 The values stated in SI units are to regarded as standard.The values stated in English units are for information only.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of
5、 the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D1142 Test Method for Water Vapor Content of GaseousFuels by Measurement of Dew-Point TemperatureD3764 P
6、ractice for Validation of the Performance of ProcessStream Analyzer Systems2.2 Other Standards:ANSI/API 2530 (AGA Report Number 3)3AGA Report Number 84NACE Standard MR-01-7553. Terminology3.1 Definitions:3.1.1 compressed natural gasnatural gas compressed toapproximately 3600 psi.3.1.2 densitymass pe
7、r unit volume of the substance beingconsidered.3.1.3 dew pointthe temperature and pressure at which thefirst droplet of liquid forms from a vapor.3.1.4 lag timetime required to transport the sample to theanalyzer.3.1.5 natural gasmixture of low molecular weight hydro-carbons obtained from petroleum-
8、bearing regions.3.1.6 sample probedevice to extract a representativesample from the pipeline.3.1.7 system turnaround timethe time required to trans-port the sample to the analyzer and to measure the desiredcomponents.4. Significance and Use4.1 A well-designed sample-handling and conditioning sys-tem
9、 is essential to the accuracy and reliability of pipelineinstruments. Approximately 70 % of the problems encounteredare associated with the sampling system.5. Selection of Sample-Handling and ConditioningSystem5.1 The sample-handling and conditioning system mustextract a representative sample from a
10、 flowing pipeline, trans-port the sample to the analyzer, condition the sample to becompatible with the analyzer, switch sample streams andcalibration gases, transport excess sample to recovery (ordisposal), and resist corrosion by the sample.5.2 The sample probe should be located in a flowingpipeli
11、ne where the flow is fully developed (little turbulence)and where the composition is representative. In areas of highturbulence, the contaminates that normally flow along thebottom or the wall of the pipeline will form aerosols.5.3 The purpose of the sample probe is to extract a repre-sentative samp
12、le by obtaining it near the center of the pipelinewhere changes in stream composition can be quickly detected.1This practice is under the jurisdiction of ASTM Committee D03 on GaseousFuels and is the direct responsibility of Subcommittee D03.01 on Collection andMeasurement of Gaseous Samples.Current
13、 edition approved Dec. 1, 2008. Published July 2009. Originally approvedin 1994. Last previous edition approved in 2003 as D5503 94 (2003). DOI:10.1520/D5503-94R08.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Boo
14、k of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036, http:/www.ansi.org.4Available from American Gas Association, 1515 Wilson Blvd., Arlington
15、, VA22209.5Available from NACE International (NACE), 1440 South Creek Dr., Houston,TX 77084-4906, http:/www.nace.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesNOTICE: This standard has either been superseded and replaced by a new
16、 version or withdrawn.Contact ASTM International (www.astm.org) for the latest information15.3.1 The tip in the sample probe should be positioned in thecenter one third of the pipeline, away from the pipeline wallwhere large particles accumulate.5.3.2 The probe should be a minimum of five pipe diame
17、tersfrom any device that could produce aerosols or significantpressure drop.5.3.3 The sample probe should not be located within adefined meter tube region (see ANSI/API 2530 AGA ReportNumber 3 and AGA Report Number 8 for more information).5.3.4 The sample probe should be mounted vertically fromthe t
18、op on horizontal pipelines. The sample probe should not belocated on vertical pipelines.5.4 The sampling-handling system must transport thesample to the analyzer and dispose of excess sample. Since thesampling point and the analyzer may be separated by somedistance, the time required to transport th
19、e sample to theanalyzer can contribute significantly to the system turnaroundtime.5.4.1 The analyzer should be located as close to the sam-pling point as is practical to minimize the sample lag time.5.4.2 The sample-handling system should be equipped witha full open ball valve and a particular filte
20、r.5.5 The sizing of the sample transport line will be influ-enced by a number of factors:5.5.1 The sample point pressure and the location of thepressure reduction regulator.5.5.2 The acceptable lag time between the sample point andthe analyzer.5.5.3 The requirements of the analyzer, such as flow rat
21、e,pressure, and temperature for the analysis. For multistreamsystems, the sample line and associated manifold tubing shouldbe flushed with sufficient sample to assure a representativesample of the selected stream.5.5.4 The presence of sample-conditioning elements willcontribute to the lag time and m
22、ust be considered in thecalculation of the minimum sample flow rate.5.5.4.1 Each element could be considered as an equivalentlength of sample line and added to the length of line from thesample point to the analyzer.5.5.4.2 The purge time of each element is calculated as thetime necessary for five v
23、olumes of sample to flow through theelement.5.5.5 A vapor sample must be kept at least 10C above thehydrocarbon dew point temperature to prevent condensation ofthe sample. The sample line should be heat traced and insulatedwhen appropriate.5.5.5.1 For compressed natural gas (CNG), the pressuremust b
24、e reduced in two stages to avoid condensation of liquidscaused by the Joule-Thompson effect. In a heated zone atapproximately 50C, the pressure should be dropped to ap-proximately 10 MPa (1500 psig) and then to a suitable pressurefor the analyzer. Any conditioning of the sample must becompleted in t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTM D5503 94 2008 Standard Practice for Natural Gas Sample Handling and Conditioning Systems Pipeline Instrumentation Withdrawn 2017

链接地址:http://www.mydoc123.com/p-286911.html