ASTM D5079 - 08 Standard Practices for Preserving and Transporting Rock Core Samples (Withdrawn 2017).pdf
《ASTM D5079 - 08 Standard Practices for Preserving and Transporting Rock Core Samples (Withdrawn 2017).pdf》由会员分享,可在线阅读,更多相关《ASTM D5079 - 08 Standard Practices for Preserving and Transporting Rock Core Samples (Withdrawn 2017).pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D5079 08Standard Practices forPreserving and Transporting Rock Core Samples1This standard is issued under the fixed designation D5079; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number
2、 in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 These practices cover the preservation, transportation,storage, cataloging, retrieval, and post-test disposition of rockcore samples obtaine
3、d for testing purposes and geologic study.1.2 These practices apply to both hard and soft rock, butexclude ice and permafrost.1.3 These practices do not apply to those situations in whichchanges in volatile gas components, contamination of the porefluids, or mechanical stress relaxation affect the i
4、ntended usefor the core.1.4 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.5 This practice offers a set of instruction for performingo
5、ne or more specific operations. This document cannot replaceeducation or experience and should be used in conjunctionwith professional judgement. Not all aspects of this practicemay be applicable in all circumstances. This ASTM standard isnot intended to represent or replace the standard of care byw
6、hich the adequacy of a given professional service must bejudged, nor should this document be applied without consid-eration of a projects many unique aspects. The word “Stan-dard” in the title of this document means only that thedocument has been approved through the ASTM consensusprocess.1.6 This s
7、tandard does not purport to address the safetyproblems associated with its use. It is the responsibility of theuser of this standard to establish appropriate safety and healthpractices and determine the applicability of regulatory limita-tions prior to use.2. Referenced Documents2.1 ASTM Standards:2
8、D420 Guide to Site Characterization for Engineering Designand Construction Purposes (Withdrawn 2011)3D653 Terminology Relating to Soil, Rock, and ContainedFluidsD2113 Practice for Rock Core Drilling and Sampling ofRock for Site InvestigationD4220 Practices for Preserving and Transporting SoilSamples
9、2.2 API Standard:API RP-40 Recommended Practice for Core Analysis Pro-cedure43. Terminology3.1 DefinitionsSee Terminology D653 for general defini-tions.3.2 Definitions of Terms Specific to This Standard:3.2.1 critical caresamples which are fragile or fluid ortemperature sensitive. This protection le
10、vel includes the re-quirements prescribed for routine and special care.3.2.2 routine carenon-sensitive, non-fragile samples forwhich only general visual identification is necessary, andsamples which will not change or deteriorate before laboratorytesting.3.2.3 soil-like carematerials which are so po
11、orly consoli-dated that soil sampling procedures must be employed toobtain intact pieces of core.3.2.4 special carefluid sensitive samples and those whichmust later be subjected to testing. Requirements for this levelof protection include those prescribed for routine care.1These practices are under
12、the jurisdiction ofASTM Committee D18 on Soil andRock and are the direct responsibility of Subcommittee D18.12 on Rock Mechanics.Current edition approved July 1, 2008. Published July 2008. Originally approvedin 1990. Last previous edition approved in 2006 as D5079 02 (2006). DOI:10.1520/D5079-08.2Fo
13、r referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3The last approved version of this historical standard is refere
14、nced onwww.astm.org.4Available from American Petroleum Institute (API), 1220 L. St., NW,Washington, DC 20005-4070, http:/www.api.org.*A Summary of Changes section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. Un
15、ited StatesNOTICE: This standard has either been superseded and replaced by a new version or withdrawn.Contact ASTM International (www.astm.org) for the latest information14. Significance and Use4.1 The geologic characteristics and the intended use of therock core samples determine the extent and ty
16、pe of preserva-tion required. If engineering properties are to be determined forthe core, it must be handled and preserved in such a way thatthe measured properties are not significantly influenced bymechanical damage, changes in chemistry, and environmentalconditions of moisture and temperature, fr
17、om the time that thecore is recovered from the core drill until testing is performed.Drill core is also the sample record for the subsurface geologyat the borehole location, and as such must be preserved forsome period of time, in some cases indefinitely, for futuregeologic study.4.2 These practices
18、 present a selection of curatorial require-ments which apply to the majority of projects. The require-ments are given for a variety of rock types and project typesranging from small to large and from noncritical to critical.Noncritical projects are those in which failure of an element orthe structur
19、e would result in negligible risk of injury andproperty loss, while there is great risk to property and life afterfailure of critical structures and projects. Guidance is given forthe selection of those specific requirements which should befollowed for a given project.5. Guide for Implementation5.1
20、A qualified person shall be assigned to have curatorialmanagement responsibility for a given project. This personshall be technically competent in the management of rock coresamples and shall have a knowledge of the various end uses forthe cores and their associated preservation requirements. Thisre
21、sponsible person shall have the authority to implement therequirements selected from these practices. In some cases, heor she may also have to decide between competing uses for thesame core.5.2 The responsible person shall select from Sections 611those requirements and procedures that should be appl
22、ied forthe core from a particular project. The curatorial manager shallthen see that these procedures are implemented, and also seethat the records specified in Section 12 are kept.5.3 The following factors should be considered when select-ing the curatorial requirements from Sections 611:5.3.1 Proj
23、ect requirements for use of the core range fromsimple ones, in which the only need is to identify and locate thevarious lithologic units, to complex and critical ones in whichdetailed property testing of the core is required for engineeringdesign. Priorities for multiple uses or different types of t
24、estsmust sometimes be established when available core lengths arelimited and when one use or test precludes another. Forexample, splitting a core for detailed geologic study preventslater strength testing, which requires an intact core.5.3.2 Mechanical property tests for structural design pur-poses
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTM D5079 08 Standard Practices for Preserving and Transporting Rock Core Samples Withdrawn 2017

链接地址:http://www.mydoc123.com/p-286899.html