ASTM C969-17 Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines.pdf
《ASTM C969-17 Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines.pdf》由会员分享,可在线阅读,更多相关《ASTM C969-17 Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C969 17Standard Practice forInfiltration and Exfiltration Acceptance Testing of InstalledPrecast Concrete Pipe Sewer Lines1This standard is issued under the fixed designation C969; the number immediately following the designation indicates the year oforiginal adoption or, in the case of
2、 revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the U.S. Department of Defense.1. Scope1.1 This prac
3、tice covers procedures for testing installedprecast concrete pipe sewer lines using either water infiltrationor exfiltration acceptance limits to demonstrate the integrity ofthe installed materials and construction procedure.1.2 This practice is the inch-pound companion to PracticeC969M; therefore,
4、no SI equivalents are presented in thepractice.NOTE 1The owner shall specify the following: who will conduct,observe, and furnish labor, furnish material and measuring devices, andpay for the tests; who is responsible for determining local groundwaterconditions; and which test is to be conducted, th
5、at is, an infiltration test oran exfiltration test.NOTE 2The user of this practice is advised that test criteria presentedin this practice are similar to those in general use. Pipe, 24-in. diameter orlarger, may be accepted by visual inspection when testing for infiltration.1.3 This standard does no
6、t purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.1.4 This international standard was deve
7、loped in accor-dance with internationally recognized principles on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Doc
8、uments2.1 ASTM Standards:2C822 Terminology Relating to Concrete Pipe and RelatedProducts3. Terminology3.1 DefinitionsFor definitions of terms relating to concretepipe, see Terminology C822.4. Summary of Practice4.1 Determine the groundwater conditions surrounding thesection of sewer to be tested and
9、 select the type of test to beconducted.4.2 For the infiltration test, the amount of water leaking intothe sewer line is measured, and the rate of infiltration isdetermined. If the rate is less than or equal to the allowablelimit, the section of sewer tested is acceptable.4.3 For the exfiltration te
10、st, the sewer line is filled withwater to the specified test head and the rate of water loss isdetermined. If the rate is less than or equal to the allowablelimit, the section of sewer tested is acceptable.5. Significance and Use5.1 This is not a routine test. The values recorded areapplicable only
11、to the sewer being tested and at the time oftesting.6. Preparation of the Sewer Line6.1 The sewer shall should be free of debris prior to testing.6.2 The manholes, the ends of the branches, laterals, wyesand stubs to be included in the test shall be plugged. All plugsshall be secured to prevent leak
12、age blowout due to testingpressure.7. Procedure7.1 Infiltration Testing:7.1.1 Conduct testing from manhole to manhole or betweenmore than two manholes. The length of main tested shall notexceed 700 ft.7.1.2 Stop all dewatering operations and allow the ground-water to return to its normal level. Infi
13、ltration testing shall notbe used unless the groundwater level is at least 2 ft above thecrown of the pipe for the entire length of the test section.7.1.3 Plug all pipe outlets discharging into the upstreammanhole.1This practice is under the jurisdiction of ASTM Committee C13 on ConcretePipe and is
14、the direct responsibility of Subcommittee C13.09 on Methods of Test.Current edition approved April 15, 2017. Published May 2017. Originallyapproved in 1982. Last previous edition approved in 2009 as C969 02(2009). DOI:10.1520/C0969-17.2For referenced ASTM standards, visit the ASTM website, www.astm.
15、org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesThis internat
16、ional standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Commit
17、tee.17.1.4 Measure the groundwater elevation and determine theaverage head over the test section.7.1.5 Measure infiltration leakage at the outlet of the testsection. Because leakage allowances are small, measurementsare best made by either timing the filling of a small containerof known volume, or b
18、y directing flow into a container for aspecified time and measuring the content, or by using smallweirs.7.1.6 If the measured rate of leakage is less than or equal tothe allowable leakage in accordance with 8.1, the section ofsewer tested is acceptable.7.1.7 If the test section fails, it is not proh
19、ibited that it berepaired and retested in accordance with this practice.7.2 Exfiltration Testing:7.2.1 Conduct testing from manhole to manhole or betweenmore than two manholes. The length of main tested shall notexceed 700 ft.7.2.2 Determine the groundwater elevation at both ends ofthe test section.
20、 If the groundwater level is less than 2 ft abovethe crown of the pipe measured from the highest elevation ofthe sewer, the exfiltration test shall be used.7.2.3 Plug all pipe outlets discharging into the upstreammanhole and the test section outlet. Fill the sewer line withwater.7.2.4 At the upstrea
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTM C969 17 Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines

链接地址:http://www.mydoc123.com/p-286786.html