ISO 6182-13-2017 Fire protection - Automatic sprinkler systems - Part 13 Requirements and test methods for extended-coverage sprinklers《消防 自动喷水系统 第13部分 扩大覆盖面喷水器.pdf
《ISO 6182-13-2017 Fire protection - Automatic sprinkler systems - Part 13 Requirements and test methods for extended-coverage sprinklers《消防 自动喷水系统 第13部分 扩大覆盖面喷水器.pdf》由会员分享,可在线阅读,更多相关《ISO 6182-13-2017 Fire protection - Automatic sprinkler systems - Part 13 Requirements and test methods for extended-coverage sprinklers《消防 自动喷水系统 第13部分 扩大覆盖面喷水器.pdf(68页珍藏版)》请在麦多课文档分享上搜索。
1、 ISO 2017 Fire protection Automatic sprinkler systems Part 13: Requirements and test methods for extended-coverage sprinklers Protection contre lincendie Systmes dextinction automatiques du type sprinkler Partie 13: Prescriptions et mthodes dessai des sprinklers couvrant une surface plus tendue que
2、la normale INTERNATIONAL STANDARD ISO 6182-13 First edition 2017-02 Reference number ISO 6182-13:2017(E) ISO 6182-13:2017(E)ii ISO 2017 All rights reserved COPYRIGHT PROTECTED DOCUMENT ISO 2017, Published in Switzerland All rights reserved. Unless otherwise specified, no part of this publication may
3、 be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below or ISOs member body in the country of the
4、requester. ISO copyright office Ch. de Blandonnet 8 CP 401 CH-1214 Vernier, Geneva, Switzerland Tel. +41 22 749 01 11 Fax +41 22 749 09 47 copyrightiso.org www.iso.org ISO 6182-13:2017(E)Foreword vi Introduction vii 1 Scope . 1 2 Normative references 1 3 T erms and definitions . 1 4 Product consiste
5、ncy 4 4.1 Quality control program . 4 4.2 Leak resistance testing . 5 4.3 Glass bulb integrity test . 5 5 Product assembly. 5 5.1 General . 5 5.2 Dynamic O-ring seals . 5 5.3 Rated Pressure 5 5.4 Dry Sprinklers 5 6 Requirements 5 6.1 Dimensions . 5 6.1.1 Orifice size . 5 6.1.2 Nominal thread sizes 6
6、 6.2 Temperature ratings and colour coding 6 6.3 Operating temperature (see 7.3) . 6 6.4 Water flow constant (see 7.4) 6 6.5 Water distribution (see 7.5) 7 6.6 Function (see 7.6) . 8 6.6.1 Lodgement (see 7.6.1) . 8 6.6.2 Deflector strength (see 7.6.2) . 8 6.7 Service load and strength of sprinkler b
7、ody (see 7.7) 8 6.8 Strength of heat-responsive element (see 7.8) . 9 6.9 Leak resistance and hydrostatic strength (see 7.9) 9 6.10 Heat exposure (see 7.10) 10 6.10.1 Glass bulb sprinklers .10 6.10.2 Uncoated sprinklers .10 6.10.3 Coated sprinklers .10 6.11 Thermal shock for glass bulb sprinklers (s
8、ee 7.11) .10 6.12 Corrosion 10 6.12.1 Stress corrosion for copper-based alloy components (see 7.12.1) .10 6.12.2 Sulfur dioxide/carbon dioxide corrosion (see 7.12.2) .10 6.12.3 Hydrogen sulfide corrosion (see 7.12.3) 10 6.12.4 Salt spray loading (see 7.12.4) 11 6.12.5 Moist air exposure (see 7.12.5)
9、 11 6.12.6 Stainless Steel Components (See 7.12.6) .11 6.13 Coated sprinklers (see 7.13) 11 6.13.1 Evaporation of wax and bitumen 11 6.13.2 Resistance to low temperatures 11 6.14 Water hammer (see 7.14) .11 6.15 Dynamic heating test (see 7.15) .12 6.15.1 Plunge Test .12 6.15.2 Post-exposure RTI 12 6
10、.16 Resistance to heat (see 7.16) .12 6.17 Vibration (see 7.17) .12 6.18 Impact (see 7.18) .12 6.19 Rough usage (see 7.19) .12 6.20 Lateral discharge (see 7.20) .12 ISO 2017 All rights reserved iii Contents Page ISO 6182-13:2017(E)6.21 Wall wetting (see 7.21) .12 6.22 Room fires (see 7.22)13 6.23 Th
11、irty-day leakage resistance (see 7.23) 13 6.24 Vacuum resistance (see 7.24)13 6.25 Thermal response of extended coverage sprinklers (see 7.25) .13 6.25.1 Thermal response test (see 7.25) .13 6.26 Freezing test (see 7.26) 14 6.27 Dry-type sprinkler deposit loading (see 7.27) .14 6.28 Dry sprinkler ai
12、r tightness (see 7.28) 14 6.29 Dezincification of Brass Components (see 7.29) 14 6.30 Protective Covers (see 7.30) .14 7 Test methods 15 7.1 General 15 7.2 Examination15 7.2.1 Preliminary examination .15 7.2.2 Visual examination 15 7.3 Operating temperature test (see 6.3) .15 7.3.1 Test of static op
13、eration 15 7.4 Water flow constant (see 6.4) .18 7.5 Water distribution tests (see 6.5) 19 7.5.1 Sprinklers other than sidewall types 19 7.5.2 Sidewall sprinklers .22 7.6 Functional test (see 6.6).24 7.6.1 Lodgement test (see 6.6.1) .24 7.6.2 Deflector strength test (see 6.6.2) .27 7.7 Service load
14、and strength of sprinkler body test (see 6.7) 27 7.7.1 Test Option 1 27 7.7.2 Test Option 2 28 7.7.3 Test Option 3 28 7.8 Strength of heat responsive element test (see 6.8) 29 7.8.1 Glass Bulbs .29 7.8.2 Fusible elements .29 7.9 Leak resistance and hydrostatic strength tests (see 6.9) 30 7.10 Heat e
15、xposure test (see 6.10) 30 7.10.1 Glass bulb sprinklers (see 6.10.1) 30 7.10.2 Uncoated sprinklers (see 6.10.2) 30 7.10.3 Coated sprinklers (see 6.10.3) 30 7.11 Thermal shock test for glass bulb sprinklers (see 6.11) 31 7.12 Corrosion tests (see 6.12) 31 7.12.1 Stress corrosion test for copper-based
16、 alloy components (see 6.12.1) 31 7.12.2 Sulfur dioxide/carbon dioxide corrosion test (see 6.12.2) 31 7.12.3 Hydrogen-sulfide corrosion test (see 6.12.3) 32 7.12.4 Salt spray loading test (see 6.12.4) .32 7.12.5 Moist air exposure (see 6.11.5) 33 7.12.6 Stainless steel components (see 6.12.6).33 7.1
17、3 Tests for sprinkler coatings (see 6.13) 34 7.13.1 Evaporation of wax and bitumen test (see 6.13.1) 34 7.13.2 Low-temperature test (see 6.13.2) .34 7.14 Water-hammer test (see 6.14) .34 7.15 Dynamic heating test (see 6.15) .34 7.15.1 Plunge Test .34 7.16 Resistance to heat test (see 6.16) 35 7.17 V
18、ibration test (see 6.17) 35 7.18 Impact test (see 6.18) 36 7.19 Rough usage test (see 6.19) 37 7.20 Lateral discharge test (see 6.20) 38 7.21 Wall wetting test (see 6.21) 38 7.22 Room fires (see 6.22)39 iv ISO 2017 All rights reserved ISO 6182-13:2017(E)7.23 Thirty-day leakage test (see 6.23) .42 7.
19、24 Vacuum test (see 6.24) 42 7.25 Thermal response of extended coverage sprinklers (see 6.25) .42 7.26 Freezing test (see 6.26) 47 7.27 Dry-type sprinkler deposit loading test (see 6.27) 48 7.28 Dry sprinkler air tightness test (see 6.28) .48 7.29 Dezincification of brass components (see 6.29) .49 7
20、.30 Protective cover impact test for glass bulb sprinklers (see 6.30) 50 8 Marking .52 8.1 Sprinklers .52 8.2 Sprinkler housings and concealed sprinkler cover plates 53 8.3 Protective covers 53 9 Manufacturers installation instructions .53 Annex A (informative) Analysis of the strength test for rele
21、ase elements .54 Annex B (normative) Tolerances .55 Annex C (normative) Tolerance limit calculation methods .56 Bibliography .58 ISO 2017 All rights reserved v ISO 6182-13:2017(E) Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies
22、 (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations,
23、governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. The procedures used to develop this document and those intended for its further ma
24、intenance are described in the ISO/IEC Directives, Part 1. In particular the different approval criteria needed for the different types of ISO documents should be noted. This document was drafted in accordance with the editorial rules of the ISO/IEC Directives, Part 2 (see www .iso .org/ directives)
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ISO6182132017FIREPROTECTIONAUTOMATICSPRINKLERSYSTEMSPART13REQUIREMENTSANDTESTMETHODSFOREXTENDEDCOVERAGESPRINKLERS

链接地址:http://www.mydoc123.com/p-1254602.html