1、IEEE Std 1147-2005(Revision of IEEE Std 1147-1991)IEE Guide for the Rehabilitation ofHydroelectric Power PlantsI E E E3 Park Avenue New York, NY10016-5997, USA22 March 2006IEEE Power Engineering SocietySponsored by theEnergy Development +1 978 750 8400. Permission to photocopy portions ofany individ
2、ual standard for educational classroom use can also be obtained through the Copyright ClearanceCenter.NOTEAttention is called to the possibility that implementation of this standard may require use of subjectmatter covered by patent rights. By publication of this standard, no position is taken with
3、respect to theexistence or validity of any patent rights in connection therewith. The IEEE shall not be responsible foridentifying patents for which a license may be required by an IEEE standard or for conducting inquiries into thelegal validity or scope of those patents that are brought to its atte
4、ntion.ivCopyright 2006 IEEE. All rights reserved.IntroductionThis introduction provides some background on the rationale used to develop this guide. This information ismeant to aid in the understanding and usage of this guide. This version of the guide is a revision of theoriginal published in 1992.
5、 The P1147 Working Group reviewed the original guide and revised it by addingnew sections on plant staffing and cold weather. The working group also revised the clause on governors,excitation systems, and transformers to enhance them with the most current experience of the workinggroup. Bibliographi
6、c references were added and the entire guide was reorganized to conform with the formatof the latest IEEE Style Manual. Numerous editorial changes and minor technical improvements were doneto enhance clarity and understanding.This document is a guide for the hydroelectric power industry to assist hy
7、droelectric power plant owners,operators and designers in the economic (feasibility) and technical evaluation (electrical aspects) of existinghydroelectric installations for rehabilitation. Feasibility study results may indicate redevelopment of the site.Redevelopment will not be treated in detail i
8、n this guide.The guide is intended to be used as a reference document for practicing engineers in the hydroelectric powerindustry.Owners of hydroelectric power plants have four options to consider after evaluating the performance andoperation of plants and individual units in the plant. These option
9、s are:a) Retirementb) Continue operation as-isc) Redevelopmentd) RehabilitationThe first two options are self-explanatory. Option c), redevelopment, involves the construction of anessentially new plant by replacement of all or a major part of the plant equipment and structures in order tomake optimu
10、m use of the hydro resource.This guide will address option d), rehabilitation. Rehabilitation should result in extended life, improvedperformance, increased reliability, increased availability, reduced maintenance, and improved operations.This guide covers all generating equipment up to and includin
11、g the main transformer and typical auxiliaryequipment.All aspects of the power plant should be considered for rehabilitation including the typical structural,electrical, and mechanical systems shown in Figure 1. For example, improved performance can be achievedby replacement of the turbine runner wi
12、th a modern design, or by upgrading the generator or improvingauxiliary support systems. Increased reliability, reduced maintenance, and improved operations can beachieved by rehabilitation of appurtenant electrical equipment such as exciters, regulators, governors,transformers, and control systems.
13、 These and related subjects are addressed in this guide.Although this document covers civil, structural, mechanical, and hydraulic aspects of a hydroelectric powerplant, they are not covered in great detail. The intent is to provide sufficient information from these otherdisciplines to assist the re
14、ader of this document in the understanding of how the electrical aspects relate to orare affected by these other features. As an historical note, the initial first drafts of this guide were coordinated with the ASCE Hydro PowerDevelopment Committee and the ASME Hydro-Power Technical. During the late
15、st revision of the guide, itThis introduction is not part of IEEE Std 1147-2005, IEEE Guide for the Rehabilitation of Hydroelectric Power.Copyright 2006 IEEE. All rights reserved.vwas reviewed and commented upon by the ASME Hydropower Technical Committee (HPTC). TheWorking Group would like to thank
16、the HPTC for their time and helpful contributions made to this guide.This guide addresses conventional hydropower. Portions of this guide are relevant to pumped storage, butthe unique features of pumped storage are not covered in the guide.The plant owner should be aware of current safety codes and
17、standards during the plant assessment andrehabilitation.The plant owner should be aware that the rehabilitation of his plant may require the need for amending thelicense with the appropriate regulating agency. The owner should also investigate historical preservation andenvironmental regulations tha
18、t may impact the rehabilitation program.The bibliography is a listing of industry standards, recommended practices, and guides that may be used as aresource by the engineer engaged in power plant rehabilitation. The review of those documents that apply tothe desired area of rehabilitation is encoura
19、ged. The listing may not be the most recent edition but is meantto be an aid in starting the review process. If the referenced publications are superseded by an approvedrevision, the revision shall apply.WATERWAYSHEADWATERTUNNELS AND POWER CANALSSURGECHAMBERINTAKETURBINEGENEXCCBTA ILWATERDRAFT TUBEI
20、SO VALVEPENSTOCKTRANSFORMERINSTRUMENTATION ANDCONTROL SYSTEMSRU NN ERGAT ES/ NE EDLE SHE AD C OVER/HOUSINGBEA RI NGS /BUSHINGSGOVERNORSEA LSPRESS SURE RELIE F VALVEDR AFT TUBE DEPRESSI ONELECTRICAL ANCILLARIESCIRCUIT BREAKERSBUS / CUBICLESINSTRUMENT TRANSFORMERSDISCONNECTSGENERATOR ANDEXCITATIONSTAT
21、ORROTORCOOLI NG SYSTEMSSHAFT A ND COUPLINGBE ARINGSEX CI TERVOLTAGE REGULATORBRAK ESPROTECTIONTRASH RACKSINTAKE GATESCRANE SDRAFT TUBEGATESPROTECTIONCOOLING SYSTEMSFigure 1Typical hydroelectric power plant systemsviCopyright 2006 IEEE. All rights reserved.Notice to usersErrataErrata, if any, for thi
22、s and all other standards can be accessed at the following URL: http:/standards.ieee.org/reading/ieee/updates/errata/index.html. Users are encouraged to check this URL forerrata periodically.InterpretationsCurrent interpretations can be accessed at the following URL: http:/standards.ieee.org/reading
23、/ieee/interp/index.html.PatentsAttention is called to the possibility that implementation of this standard may require use of subject mattercovered by patent rights. By publication of this standard, no position is taken with respect to the existence orvalidity of any patent rights in connection ther
24、ewith. The IEEE shall not be responsible for identifyingpatents or patent applications for which a license may be required to implement an IEEE standard or forconducting inquiries into the legal validity or scope of those patents that are brought to its attention.Copyright 2006 IEEE. All rights rese
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- IEEE11472005ENGUIDEFORTHEREHABILITATIONOFHYDROELECTRICPOWERPLANTS 水力发电 设备 改造 指南 PDF

链接地址:http://www.mydoc123.com/p-1248047.html