1、Designation: C1618 13C1618 19Standard Test Method forConcrete Sanitary Sewer Pipe by Negative (Vacuum) orPositive Air Pressure1This standard is issued under the fixed designation C1618; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revisio
2、n, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers procedures for testing of precast concrete pipe sections, prior to delivery, wh
3、ere maximum fieldleakage rates are specified.1.2 Tests described in this standard are intended to be used at the point of manufacture of the concrete pipe and are not intendedfor testing installed pipe (for field tests see Practices C924, C969, and C1214). The user of this specification is advised t
4、hatindividual or multiple pipe sections may be tested for the purpose of testing the pipe barrel and additionally the joints in straightalignment when multiple pipe sections are tested.1.3 Test times are based on leakage rates and therefore are proportional only to the pipe diameter and are constant
5、 for any lengthof test pipe or pipeline.1.4 Test times tabulated and the rate of air loss in this standard are based on successful testing of installed pipelines. However,since air and water have different physical properties, retests of some pipelines not meeting field air tests have been successfu
6、lwhen tested with water. The leakage rates of 0.0017 CFM/ft2 and 0.0003 CFM/ft2, were determined empirically as the maximumsfor pipe to meet the 50 and 200 gal/(in. of internal diameter) (mile of sewer) (24h) test rates, respectively.1.5 The values stated in inch-pound units are to be regarded as st
7、andard. No other units of measurement are included in thisstandard.NOTE 1The availability of this test procedure for concrete pipe varies from location to location. Check with local supplier(s) for availability andrecommendations.1.6 This standard does not purport to address all of the safety concer
8、ns, if any, associated with its use. It is the responsibilityof the user of this standard to establish the appropriate safety safety, health, and healthenvironmental practices and to determinethe applicability of regulatory limitations prior to its use. See Section 6 for specific safety precautions.
9、1.7 This international standard was developed in accordance with internationally recognized principles on standardizationestablished in the Decision on Principles for the Development of International Standards, Guides and Recommendations issuedby the World Trade Organization Technical Barriers to Tr
10、ade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2C822 Terminology Relating to Concrete Pipe and Related ProductsC924 Practice for Testing Concrete Pipe Sewer Lines by Low-Pressure Air Test Method (Withdrawn 2013)3C969 Practice for Infiltration and Exfiltration Acceptance Testing of Ins
11、talled Precast Concrete Pipe Sewer LinesC1214 Test Method for Concrete Pipe Sewerlines by Negative Air Pressure (Vacuum) Test Method3. Terminology3.1 DefinitionsFor definitions of terms related to precast concrete pipe, see Terminology C822.1 This test method is under the jurisdiction of ASTM Commit
12、tee C13 on Concrete Pipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.Current edition approved July 1, 2013Jan. 1, 2019. Published December 2013January 2019. Originally approved in 2005. Last previous edition approved in 2013 asC1618 05C1618 13.(2013). DOI: 10.1520/C161
13、8-13.10.1520/C1618-19.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. ForAnnual Book ofASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.This document is not an ASTM standard and
14、 is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only t
15、he current versionof the standard as published by ASTM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States14. Summary of Test Method4.1 The pipe to be tested shall be sealed at the outer ends with
16、 suitable airtight bulkheads. The manufacturer shall choose touse either low-pressure air or negative pressure air (vacuum) test methods to evaluate the condition of the pipe before delivery.The change in the internal pressure during a specified time is used to determine the acceptability of the pip
17、e.5. Significance and Use5.1 This is a quality control test performed at the manufacturing plant to establish that the finished, shippable pipe meets theleakage limits stated in the specifications.6. Safety Precautions6.1 The user of this specification is advised of the following:6.1.1 This test may
18、 be dangerous if a pipe is not prepared properly and proper procedures are not followed.6.1.2 No one should be allowed near the ends of the pipe or test bulkheads during the test.7. Apparatus7.1 For positive air pressure test, one bulkhead shall include a remote controlled valve that will release th
19、e internal test pressure.7.1 For the low-pressure air test, tie rods or an external test frame that is designed to resist the force caused by internal airpressure shall be used to restrain the bulkheads. The low-pressure air test assembly shall be protected by a relief valve set to releaseat a press
20、ure no greater than 6 psi. The The bulkheads used for negative pressure air tests do not require external restraints.7.2 The pressure or vacuum pumps shall have adequate capacity to obtain the required test pressure.7.3 The test pressure shall be measured with a gage or manometer that is precise eno
21、ugh to measure the increments of pressurechange specified by this standard.7.4 The pressure measuring devices shall be located in a safe area where they can be observed without danger to test personnel.8. Preparation of the Pipe8.1 Allow the test pipe to cool to ambient air temperature.NOTE 2A wette
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC16182019STANDARDTESTMETHODFORCONCRETESANITARYSEWERPIPEBYNEGATIVEVACUUMAIRPRESSUREPDF

链接地址:http://www.mydoc123.com/p-1243479.html