GA 220-2006_en GYPSUM BOARD WINTER RELATED INSTALLATION RECOMMENDATIONS《石膏板冬天安装建议》.pdf
《GA 220-2006_en GYPSUM BOARD WINTER RELATED INSTALLATION RECOMMENDATIONS《石膏板冬天安装建议》.pdf》由会员分享,可在线阅读,更多相关《GA 220-2006_en GYPSUM BOARD WINTER RELATED INSTALLATION RECOMMENDATIONS《石膏板冬天安装建议》.pdf(1页珍藏版)》请在麦多课文档分享上搜索。
1、Printed in U.S.A. Copyright Gypsum Association 2006. All rights reserved. GYPSUM BOARD WINTER RELATED INSTALLATION RECOMMENDATIONS (GA-220-06) Cold and damp weather conditions can contribute to joint compound bond failure, delayed shrinkage, beading, nail popping, joint shadowing and board sagging.
2、Observing the following precautions during periods of cold and damp weather will reduce job problems. Gypsum board and joint treatment should not be applied to cold or damp surfaces. For mechanical installation of gypsum board, room temperature should be maintained at not less than 40oF (5oC). not l
3、ess than 50oF (10oC) for adhesive application of gypsum board and for joint treatment, texturing and decoration. Interior temperatures should be maintained at not less than 50oF (10oC) for a minimum of 48 hours and the gypsum board should be completely dry before taping and finishing. Subsequent fin
4、ishing and texturing should not proceed until previous applications are completely dry. Ready-mixed joint compounds and textures shall be protected against freezing in storage. Where materials are being mixed and used for joint treatment or the laminating of one layer of board to another, the temper
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GA2202006_ENGYPSUMBOARDWINTERRELATEDINSTALLATIONRECOMMENDATIONS 石膏板 冬天 安装 建议 PDF

链接地址:http://www.mydoc123.com/p-1228951.html