1、12-05M 31 23 19 - 1 SECTION 31 23 19 DEWATERING SPEC WRITER NOTES: 1. Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. Surface water included in this work shall include water that appears on the s
2、urface as rainfall or snowmelt runoff, or ground water conditions below grades that appear at the surface in the form of weeps or springs. Dewatering of surface water from flowing streams, brooks, lakes, ponds, or rivers identified on USGS topographic maps or shown on the plans as flowing shall not
3、be included in this specification section. PART 1 - GENERAL 1.1 DESCRIPTION: This section specifies performance of dewatering required to lower and control ground water table levels and hydrostatic pressures to permit excavation, backfill, and construction to be performed in the dry. Control of surf
4、ace water shall be considered as part of the work under this specification. 1.2 SUMMARY: A. The work to be completed by the Contractor includes, but is not necessarily limited to the following: 1. Implementation of the Erosion and Sedimentation Control Plan. 2. Dewater excavations, including seepage
5、 and precipitation. B. The Contractor shall be responsible for providing all materials, equipment, labor, and services necessary for care of water and erosion control. Excavation work shall not begin before the Erosion and Sedimentation Control Plan is in place. 1.3 REQUIREMENT: A. Dewatering system
6、 shall be of sufficient size and capacity necessary to lower and maintain ground water table to an elevation at least / 300 mm (1 foot) / below lowest foundation subgrade or bottom of pipe trench and to allow material to be excavated in a reasonably dry condition. Materials to be removed shall be su
7、fficiently dry to permit excavation to grades shown and to stabilize excavation slopes where sheeting is not required. Operate dewatering system continuously until backfill work has been completed. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-12-0
8、5M 31 23 19 - 2 B. Reduce hydrostatic head below any excavation to the extent that water level in the construction area is a minimum of 300 mm (1 foot) below prevailing excavation surface. C. Prevent loss of fines, seepage, boils, quick conditions or softening of foundation strata. D. Maintain stabi
9、lity of sides and bottom of excavation. E. Construction operations are performed in the dry. F. Control of surface and subsurface water is part of dewatering requirements. Maintain adequate control so that: 1. The stability of excavated and constructed slopes are not adversely affected by saturated
10、soil, including water entering prepared subbase and subgrades where underlying materials are not free draining or are subject to swelling or freeze-thaw action. 2. Erosion is controlled. 3. Flooding of excavations or damage to structures does not occur. 4. Surface water drains away from excavations.
11、 5. Excavations are protected from becoming wet from surface water, or insure excavations are dry before additional work is undertaken. G. Permitting Requirements: The contractor shall comply with and obtain the required State and County permits where the work is performed. 1.4 RELATED WORK: A. Mate
12、rials testing and inspection during construction: Section 01 45 29, TESTING LABORATORY SERVICES. B. Safety Requirements: Section 00 72 00, GENERAL CONDITIONS, Article, ACCIDENT PREVENTION. C. Submittal requirements as specified in Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. D. Protect
13、ion of existing utilities, fire protection services, existing equipment, roads, and pavements: Section 01 00 00, GENERAL REQUIREMENTS. E. Subsurface Investigation: Section 01 00 00, GENERAL REQUIREMENTS, Article 1.11, PHYSICAL DATA. F. Excavation, backfilling, site grade and utilities: Section 31 20
14、 00, EARTH MOVING. 1.5 SUBMITTALS: A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Drawings and Design Data: 1. Submit drawings and data showing the method to be employed in dewatering excavated areas 30 days before commencement of excavation. Provided by
15、IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-12-05M 31 23 19 - 3 2. Material shall include: location, depth and size of wellpoints, headers, sumps, ditches, size and location of discharge lines, capacities of pumps and standby units, and detailed description
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA3123192005DEWATERINGPDF