1、09-08M 31 20 11 - 1 SECTION 31 20 11 EARTH MOVING (SHORT FORM) SPEC WRITER NOTES: 1. Use this section for small projects where earthwork is not extensive and site work restoration only is required. 2. Where materials are specified, substitute readily available materials meeting local State DOT stand
2、ards, if possible. Contact local quarries regarding availability of local materials meeting State DOT standards. 3. Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1:DESCRIPTION:
3、This section specifies the requirements for furnishing all equipment, materials, labor and techniques for earthwork including excavation, fill, backfill and site restoration utilizing fertilizer, seed and/or sod. 1.2 DEFINITIONS: A. Unsuitable Materials: 1. Fills: Topsoil, frozen materials; construc
4、tion materials and materials subject to decomposition; clods of clay and stones larger than 75 mm (3 inches); organic materials, including silts, which are unstable; and inorganic materials, including silts, too wet to be stable. 2. Existing Subgrade (except footings): Same materials as above paragr
5、aph, that are not capable of direct support of slabs, pavement, and similar items, with the possible exception of improvement by compaction, proofrolling, or similar methods of improvement. 3. Existing Subgrade (footings only): Same as Paragraph 1, but no fill or backfill. If materials differ from /
6、 reference borings and / design requirements, excavate to acceptable strata subject to Resident Engineers approval. B. Earthwork: Earthwork operations required within the new construction area. It also includes earthwork required for auxiliary structures and buildings and sewer and other trenchwork
7、throughout the job site. C. Degree of Compaction: Degree of compaction is expressed as a percentage of maximum density obtained by the test procedure presented in / AASHTO / T99 / T180 / Method A. / ASTM / D698 / D1557 / Method A. / D. The term fill means fill or backfill as appropriate. Provided by
8、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-08M 31 20 11 - 2 1.3 RELATED WORK: A. Materials testing and inspection during construction: Section 01 45 29, TESTING LABORATORY SERVICES. B. Safety Requirements / and blasting operations /: Section 00 72 00, G
9、ENERAL CONDITIONS, Article, ACCIDENT PREVENTION. C. Protection of existing utilities, fire protection services, existing equipment, roads, and pavements: Section 01 00 00, GENERAL REQUIREMENTS. D. Subsurface Investigation: Section 01 00 00, GENERAL REQUIREMENTS, Article, PHYSICAL DATA. /E. Foundatio
10、n System Requirements: Section 31 62 00, DRIVEN PILES, Section 31 63 16, AUGER CAST GROUT PILES, Section 31 63 26, DRILLED CAISSONS, FLOWABLE FILL, Section 31 23 23.33. / 1.4 CLASSIFICATION OF EXCAVATION: A. Unclassified Excavation: Removal and disposal of pavements and other man-made obstructions v
11、isible on the surface; utilities, and other items including underground structures indicated to be demolished and removed; together with any type of materials regardless of character of material and obstructions encountered. SPEC WRITER NOTE: Retain either Unclassified excavation above or classified
12、 excavation below. B. Classified Excavation: Removal and disposal of all material not defined as rock. C. Rock Excavation: 1. Solid ledge rock (igneous, metamorphic, and sedimentary rock). 2. Bedded or conglomerate deposits so cemented as to present characteristics of solid rock which cannot be exca
13、vated without blasting; or the use of a modern power excavator (shovel, backhoe, or similar power excavators) of no less than 0.75 m3 (1 cubic yard) capacity, properly used, having adequate power and in good running condition. 3. Boulders or other detached stones each having a volume of 0.4 m3 (1/2
14、cubic yard) or more. 1.5 MEASUREMENT AND PAYMENT FOR ROCK EXCAVATION: A. Measurement: Cross section and measure the uncovered and separated materials, and compute quantities by the Registered Professional Land Surveyor or Registered Civil Engineer, specified in Section 01 00 00, GENERAL REQUIREMENTS
15、. Do not measure quantities beyond the following limits: 1. 300 mm (12 inches) outside of the perimeter of formed footings. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-08M 31 20 11 - 3 2. 600 mm (24 inches) outside the face of concrete work fo
16、r which forms are required, except for footings. 3. 150 mm (6 inches) below the bottom of pipe and not more than the pipe diameter plus 600 mm (24 inches) in width for pipe trenches. 4. The outside dimensions of concrete work for which no forms are required (trenches, conduits, and similar items not
17、 requiring forms). /B. Payment: No separate payment shall be made for rock excavation quantities shown. The contract price and time will be adjusted for overruns or underruns in accordance with Articles, DIFFERING SITE CONDITIONS, CHANGES and CHANGES-SUPPLEMENT of the GENERAL CONDITIONS as applicabl
18、e. / /B. Payment for Differing Site Conditions: When rock excavation, as classified, is encountered, the contract price and time will be adjusted in accordance with Articles, DIFFERING SITE CONDITIONS, CHANGES and CHANGES-SUPPLEMENT of the GENERAL CONDITIONS as applicable. / 1.6 SUBMITTALS: A. Submi
19、t in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Rock Excavation Report: 1. Certification of rock quantities excavated. 2. Excavation method. 3. Labor. 4. Equipment. 5. Land Surveyors or Civil Engineers name and official registration stamp. 6. Plot plan showing ele
20、vations. SPEC WRITER NOTE: Use only when there is a VA Retained Testing Laboratory. C. Furnish to Resident Engineer, soil samples, suitable for laboratory tests, of proposed off site or on site fill material. 1.7 APPLICABLE PUBLICATIONS: A. Publications listed below form a part of this specification
21、 to the extent referenced. Publications are referenced in the text by the basic designation only. B. American Nursery and Landscape Association (ANLA): 2004. American Standard for Nursery Stock C. American Association of State Highway and Transportation Officials (AASHTO): T99-01 (R2004). Moisture-D
22、ensity Relations of Soils Using a 2.5 kg (5.5 lb) Rammer and a 305 mm (12 inch) Drop Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-08M 31 20 11 - 4 T180-01 (2004). Moisture-Density Relations of Soils Using a 4.54-kg 10 lb Rammer and a 457 mm (18
23、 inch) Drop D. American Society for Testing and Materials (ASTM): D698-07 Laboratory Compaction Characteristics of Soil Using Standard Effort D1557-02. Laboratory Compaction Characteristics of Soil Using Modified Effort E. Standard Specifications of (Insert name of local state) State Department of T
24、ransportation, latest revision. PART 2 - PRODUCTS 2.1 MATERIALS: SPEC WRITER NOTE: Make material requirements agree with applicable requirements specified in the referenced Applicable Publications. Update and specify only that which applies to the project. A. Fills: Materials approved from on site a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA3120112008EARTHMOVINGSHORTFORMPDF