1、09-11 28 23 00 - 1 SECTION 28 23 00 VIDEO SURVEILLANCE SPEC WRITER NOTE: Delete / _ / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. Insert additional provisions as required for this project. PART 1 GENERAL 1.1 DESCRIP
2、TION A. Provide and install a complete Video Surveillance System, which is identified as the Video Assessment and Surveillance System hereinafter referred to as the VASS System as specified in this section. B. This Section includes video surveillance system consisting of cameras, data transmission w
3、iring, and a control station with its associated equipment. SPEC WRITER NOTE: Retain paragraph below if video surveillance will be integrated with one or more of other systems and integration requirements are specified in one of those system Sections. If retaining below, edit both paragraph above an
4、d paragraph below to coordinate with the scope of the Section that includes systems integration requirements. C. Video surveillance system Video assessment drawing submittals shall be per the established project schedule. D. Pre-installation design and as-built packages shall include, but not be lim
5、ited to: 1. Index Sheet that shall: a. Define each page of the design package to include facility name, building name, floor, and sheet number. b. Provide a list of all security abbreviations and symbols. c. Reference all general notes that are utilized within the design package. d. Specification an
6、d scope of work pages for all security systems that are applicable to the design package that will: 1) Outline all general and job specific work required within the design package. 2) Provide a device identification table outlining device Identification (ID) and use for all security systems equipmen
7、t utilized in the design package. 2. Floor plans, site plans, and enlarged plans shall: a. Include a title block as defined above. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-11 28 23 00 - 6 b. Define the drawings scale in both standard and me
8、tric measurements. c. Provide device identification and location. d. Address all signal and power conduit runs and sizes that are associated with the design of the electronic security system and other security elements (e.g., barriers, etc.). e. Identify all pull box and conduit locations, sizes, an
9、d fill capacities. f. Address all general and drawing specific notes for a particular drawing sheet. 3. A riser drawing for each applicable security subsystem shall: a. Indicate the sequence of operation. b. Relationship of integrated components on one diagram. c. Include the number, size, identific
10、ation, and maximum lengths of interconnecting wires. d. Wire/cable types shall be defined by a wire and cable schedule. The schedule shall utilize a lettering system that will correspond to the wire/cable it represents (example: A = 18 AWG/1 Pair Twisted, Unshielded). This schedule shall also provid
11、e the manufacturers name and part number for the wire/cable being installed. 4. A system drawing for each applicable security system shall: a. Identify how all equipment within the system, from main panel to device, shall be laid out and connected. b. Provide full detail of all system components wir
12、ing from point-to-point. c. Identify wire types utilized for connection, interconnection with associate security subsystems. d. Show device locations that correspond to the floor plans. e. All general and drawing specific notes shall be included with the system drawings. 5. A schedule for all of the
13、 applicable security subsystems shall be included. All schedules shall provide the following information: a. Device ID. b. Device Location (e.g. site, building, floor, room number, location, and description). c. Mounting type (e.g. flush, wall, surface, etc.). d. Power supply or circuit breaker and
14、power panel number. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-11 28 23 00 - 7 e. In addition, for the VASS Systems, provide the camera ID, camera type (e.g. fixed or pan/tilt/zoom (P/T/Z), lens type (e.g. for fixed cameras only) and housing
15、model number. 6. Detail and elevation drawings for all devices that define how they were installed and mounted. E. Pre-installation design packages shall be reviewed by the Contractor along with a VA representative to ensure all work has been clearly defined and completed. All reviews shall be condu
16、cted in accordance with the project schedule. There shall be four (4) stages to the review process: 1. 35 percent 2. 65 percent 3. 90 percent 4. 100 percent F. Provide manufacturer security system product cut-sheets. Submit for approval at least 30 days prior to commencement of formal testing, a Sec
17、urity System Operational Test Plan. Include procedures for operational testing of each component and security subsystem, to include performance of an integrated system test. G. Submit manufactures certification of Underwriters Laboratories, Inc. (UL) listing as specified. Provide all maintenance and
18、 operating manuals per the VA General Requirements, Section 01 00 00, GENERAL REQUIREMENTS. H. Submit completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with th
19、e requirements of Section 28 08 00 COMMISSIONING OF ELECTRONIC SAFETY AND SECURITY SYSTEMS. 1.6 APPLICABLE PUBLICATIONS A. The publications listed below (including amendments, addenda, revisions, supplement, and errata) form a part of this specification to the extent referenced. The publications are
20、 referenced in the text by the basic designation only. B. American National Standards Institute (ANSI)/Electronic Industries Alliance (EIA): 330-09 . Electrical Performance Standards for CCTV Cameras Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09
21、-11 28 23 00 - 8 375A-76 Electrical Performance Standards for CCTV Monitors C. Institute of Electrical and Electronics Engineers (IEEE): C62.41-02 IEEE Recommended Practice on Surge Voltages in Low-Voltage AC Power Circuits 802.3af-08 . Power over Ethernet Standard D. Federal Communications Commisio
22、n (FCC): (47 CFR 15) Part 15 Limitations on the Use of Wireless Equipment/Systems E. National Electrical Contractors Association (NECA): 303-2005 . Installing Closed Circuit Television (CCTV) Systems F. National Fire Protection Association (NFPA): 70-08 Article 780-National Electrical Code G. Federa
23、l Information Processing Standard (FIPS): 140-2-02 . Security Requirements for Cryptographic Modules H. Underwriters Laboratories, Inc. (UL): 983-06 . Standard for Surveillance Camera Units 3044-01 Standard for Surveillance Closed Circuit Television Equipment 1.7 COORDINATION A. Coordinate arrangeme
24、nt, mounting, and support of video surveillance equipment: 1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated. 2. To provide for ease of disconnecting the equipment with minimum interference to other installations. 3. To allow right of way for p
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2823002011VIDEOSURVEILLANCEPDF