1、10-11 07 53 23 - 1 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING SPEC WRITER NOTES: 1. Delete between /_/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. Slopes: Do not use on slopes over 1:10 (one inch p
2、er foot). Provide 1:50 (1/4 inch per foot) minimum to drains without any “Gutters“ (no slopes between drains). Slope crickets 1:50 (1/4-inch per foot). NO EXCEPTION TO MINIMUM SLOPE. 3. Coordinate with plumbing requirements for roof drains and drain locations at low points and mid span where maximum
3、 deflection occurs. Do not put drain at columns or on slopes. Coordinate with insulation to provide “dishes“ at drains. 4. Coordinate details and systems used to provide code required fire rated roofing system. Do not use unsurfaced membranes over combustible insulation on decks. 5. Use of adhered s
4、ystem is preferred over mechanically anchored or a ballasted system. 6. When a ballasted system is used: a. Coordinate to insure structural design provides for square foot dead load of ballast for aggregate and paving units. Do not use on an existing structure where the structural system will not ta
5、ke the ballast dead load. b. Design for wind uplift at site. c. Select rate of ballast in accordance with FM Data Sheets 1-7, 1-28, and Technical Advisory Bulletin (TAB) 1-29. d. Use pavers or loose aggregate or both over membrane. e. Coordinate details to provide raised roof edge 200 mm (8 inches)
6、minimum above surface of aggregate ballast or clamping device for pavers at edge and strapping where necessary when parapet walls over 600 mm (24 inches) high do not occur. f. Do not use over loose laid insulation. 7. Coordinate with Section 07 22 00, ROOF AND DECK INSULATION for roof insulation und
7、er the membrane. Decrease “R“ value 5 percent when mechanical fasteners are used through the insulation to compensate for parallel heat flow. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 07 53 23 - 2 8. Do not use over polystyrene, urethane,
8、 or wood fiberboard insulation under the membrane. 9. Do not use over bituminous materials where direct contact occurs, including grease, oil, or other substances not compatible with EPDM. Use a thin layer of insulation, slip sheet or separator sheet depending upon method of attachment. 10. Terminat
9、e base flashings not less than 200 mm (8 inches) above roof surface including curb for building expansion joints. 11. Do not put expansion joints at roof surface level. 12. Do not use “pitch pocket“ or “sealant pocket“ in lieu of base flashings and cap flashings. 13. This specification is for use ov
10、er cellular insulating concrete decks, concrete decks or insulation. Insert additional text when installed directly to other decks or insulation systems not specified in Section 07 22 00, ROOF AND DECK INSULATION. 14. Do not use pipe boots that do not provide less than 100 mm (4 inch) height above r
11、oof. PART 1 GENERAL 1.1 DESCRIPTION A. Ethylene Propylene Diene Monomer (EPDM) sheet roofing / adhered / mechanically fastened / ballasted / to roof deck. B. Fire rated roof system. 1.2 RELATED WORK A. Treated wood framing, blocking, and nailers: Section 06 10 00, ROUGH CARPENTRY. B. Roof Insulation
12、: Section 07 22 00, ROOF AND DECK INSULATION. C. Metal cap flashings, copings, fascias, and expansion joints: Section 07 60 00, FLASHING AND SHEET METAL. D. Roof hatches, equipment supports, dome type skylights, and gravity ventilators: Section 07 72 00, ROOF ACCESORIES. E. Mechanical equipment supp
13、orts: Section 23 34 00, HVAC FANS and Section 23 31 00, HVAC DUCTS AND CASINGS, Section 23 37 00, AIR OUTLETS AND INLETS. 1.3 QUALITY ASSURANCE A. Approved applicator by the membrane roofing system manufacturer, and certified by the manufacturer as having the necessary expertise to install the speci
14、fic system. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 07 53 23 - 3 B. Pre-Roofing Meeting: 1. Upon completion of roof deck installation and prior to any roofing application, hold a pre-roofing meeting arranged by the Contractor and attend
15、ed by the Roofing Inspector, Material Manufacturers Technical Representative, Roofing Applicator, Contractor, and Resident Engineer, 2. Discuss specific expectations and responsibilities, construction procedures, specification requirements, application, environmental conditions, job and surface read
16、iness, material storage, and protection. 3. Inspect roof deck at this time to: a. Verify that work of other trades which penetrates roof deck is completed. b. Determine adequacy of deck anchorage, presence of foreign material, moisture and unlevel surfaces, or other conditions that would prevent app
17、lication of roofing system from commencing or cause a roof failure. c. Examine samples and installation instructions of manufacturer. d. Perform pull out test of fasteners (See paragraph 3.2). 1.4 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B.
18、Applicators approval certification by manufacturer. C. Shop Drawings: 1. Sheet membrane layout. 2. Fastener pattern, layout, and spacing requirements. 3. Termination details. D. Manufacturers installation instructions revised for project. E. Samples: 1. Sheet membrane: One 150 mm (6 inch) square pie
19、ce. 2. Sheet flashing: One 150 mm (6 inch) square piece. 3. Fasteners: Two, each type. 4. Welded seam: Two 300 mm (12 inch) square samples of welded seams to represent quality of field welded seams. 1.5 DELIVERY, STORAGE AND HANDLING A. Deliver, store, and handle materials as specified by manufactur
20、er. B. Store volatile materials separate from other materials with separation to prevent fire from damaging the work, or other materials. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-11 07 53 23 - 4 1.6 WARRANTY Roofing work subject to the term
21、s of the Article “Warranty of Construction”, FAR clause 52.246-21, except extend the warranty period to five years. 1.7 APPLICABLE PUBLICATIONS A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation on
22、ly. B. American Society for Testing and Materials (ASTM): A167-99(R2009) . Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet and Strip B209-07 Aluminum and Aluminum-Alloy Sheet and Plate D751-06 Coated Fabrics D2103-10 . Polyethylene Film and Sheeting D2240-05(R2010) Rubber Property -
23、Durometer Hardness D3884-09 . Abrasive Resistance of Textile Fabrics (Rotary Platform, Double-Head Method) D4637-10 . EPDM Sheet Used in Single-Ply Roof Membrane D4586-07 . Asphalt Roof Cement, Asbestos Free E96-10 . Water Vapor Transmission of Materials E108-10 Fire Tests of Roof Coverings G21-09 .
24、 Resistance of Synthetic Polymeric Materials to Fungi C. National Roofing Contractors Association (NRCA): Fifth Edition - 05 . The NRCA Roofing and Waterproofing Manual. D. Federal Specifications (Fed. Spec.) FF-S-107C(2) . Screws, Tapping and Drive FF-S-111D(1) . Screw, Wood UU-B-790A Building Pape
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0753232011ETHYLENEPROPYLENEDIENEMONOMERROOFINGPDF

链接地址:http://www.mydoc123.com/p-1074722.html