UL 1610 CRD-2010 UL Standard for Safety Central-Station Burglar-Alarm Units - Section Paragraph Reference New 25A Subject Requirements for Central Supervisory Station Equipment Ce.pdf
《UL 1610 CRD-2010 UL Standard for Safety Central-Station Burglar-Alarm Units - Section Paragraph Reference New 25A Subject Requirements for Central Supervisory Station Equipment Ce.pdf》由会员分享,可在线阅读,更多相关《UL 1610 CRD-2010 UL Standard for Safety Central-Station Burglar-Alarm Units - Section Paragraph Reference New 25A Subject Requirements for Central Supervisory Station Equipment Ce.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULUNDERWRITERS LABORATORIES INC. CERTIFICATION REQUIREMENT DECISIONThis Certification Requirement Decision is prepared and published by Underwriters Laboratories Inc.(UL). It is normative for the a
2、pplicable UL Product Certification Program(s); however, it is currently notpart of the UL Standard(s) referenced below.Product Category (CCN): AMCXStandard Number: UL 1610Edition Date: October 26, 2012Edition Number: 3Section / Paragraph Reference: New 25ASubject: Requirements for Central Supervisor
3、y Station Equipment Central StationBurglar Alarm UnitsDECISION:To address the use of receiver software and consistent with the existing UL 1610 Standards proposal andthe existing requirements of UL 1076, Section 25A , Central Supervisory Station Equipment, the followingrequirement should be applied
4、to UL 1610 receiver equipment utilizing redundant receiver computersystems.NEW 25A Central Supervisory Station Equipment25A.1 This section describes alternate methods for the evaluation of central supervisory station equipmentmeeting the conditions specified in 25A.2. This section does not apply to
5、equipment intended for use atthe protected premise such as control units, intrusion detection units, and the like.25A.2 Receiving equipment meeting all the conditions specified in 25A.2 (a) (m) need not be subjectedto Sections 27 29 and 31-51.a) Data processing equipment and office appliance and bus
6、iness equipment used as centralsupervisory station equipment shall comply with The Standard for Information TechnologyEquipment, UL 60950.b) The manufacturer specifies the minimum system configuration consisting of the following:1) Operating system and revision level.2) Microprocessor type, minimum
7、revision level and minimum clock speed.3) Minimum disk storage.4) Minimum memory requirements.5) Monitoring software revision level.c) A system meeting, but not exceeding the specifications of 25A.2 (b), shall be submitted forcompliance with those tests not specified in this paragraph.d) The install
8、ation instructions shall specify supply line transient protection complying with theStandard for Transient Voltage Surge Suppressors, UL 1449, with a maximum marked rating of330 V.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULe) The installa
9、tion instructions shall specify signal line transient protection complying with theStandard for Protectors for Data Communications and Fire Alarm Circuits, UL 497B, with amaximum marked rating of 50 V.f) The installation instructions shall specify that communication circuits and networkcomponents co
10、nnected to the telecommunications network shall be protected by secondaryprotectors for communication circuits. These protectors shall comply with the Standard forSecondary Protectors For Communications Circuits, UL 497A. These protectors shall be usedonly in the protected side of the telecommunicat
11、ions network.g) The installation instructions shall indicate that equipment be installed in a temperaturecontrolled environment. A temperature controlled environment is defined as one that can bemaintained between 13 35C (55 95F) by the HVAC system. Twenty-four hours of standbypower shall be provide
12、d for the HVAC system. The standby power system for the HVAC systemmay be supplied by an engine driven generator alone. A standby battery is not required to beused.h) All receiving equipment shall be completely duplicated with provision for switchover to thebackup system within 30 seconds. The backu
13、p system shall be fully operational within 6minutes of the loss of the primary system. This allows 30 seconds for the backup system to befully energized and connected to necessary communication lines and other devices, followed by5-1/2 minutes for the system to boot up, conduct memory tests, file sy
14、stem check, securityverifications and prepare for full system operation. The backup computer shall have equivalentor greater capabilities of the primary, such as memory, speed and the like.i) Failure of the main computer system, hard disk, and alarm monitor shall result in switchoverto the backup sy
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UL1610CRD2010ULSTANDARDFORSAFETYCENTRALSTATIONBURGLARALARMUNITSSECTIONPARAGRAPHREFERENCENEW25ASUBJECTREQUIREMENTSFORCENTRALSUPERVISORYSTATIONEQUIPMENTCEPDF

链接地址:http://www.mydoc123.com/p-1067577.html