SANS 10120-5 MK-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section MK K.pdf
《SANS 10120-5 MK-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section MK K.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 MK-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section MK K.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause - SABS 0120 : Part 5 Section MK-1983 Kerbing and channelling PART 5 : CONTRACT ADMINISTRATION SECTION MK CONTENTS Page Numbrr START OF CONSTRUCTIO
4、N . 1 General 1 IMMEDIATELY AFTER THE HANDING OVER OF THE SITE . 3 General 1 DURING CONSTRUCTION 1 Methods of Construction . 1 Construction of truly straight and neatly jointed extruded kerbing . 1 Administration . 1 Control of the extrusion of concrete kerbing . 1 Concrete-lined open drains . 1 QUA
5、LITY CONTROL AND OTHER CONSIDERATIONS . 1 9 November 1983 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU 08 STANDARDS SABS 0120 : Part 5 section MK-1983 Kerbing and channelling SABS 1200 MK : KERBING AND CHANNELLING NOTE: The clause number(s) given at the beginning or after the heading of a cla
6、use is/are, unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 MK. START OF CONSTRUCTION GENERAL. For the purposes of this part of the code, contract administration starts with instructions to the contractor to commence work as set out in Subclause 4 of Section 0. IPWEDIAT
7、ELY AFTER THE HANDING OVER OF THE SITE. The engineer should give immediate attention to all matters necessary to ensure that the start of the contract is not adverse1.y affected by lack of information. In particular, for each curve in the kerbing, he should provide pegs or data from which finished a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205MK1983CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONMKKPDF

链接地址:http://www.mydoc123.com/p-1028624.html