SANS 10120-5 DK-1996 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DK G.pdf
《SANS 10120-5 DK-1996 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DK G.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 DK-1996 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section DK G.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 01 20-5 Section DK:l996 Gabions and pitching First revision Part 5 : Contract administration Section DK Contents 1 Startofconstruction . 1.1 General
4、 2 Immediately after the handing over of the site . . 2.1 General 2.2 Geotextile or geomembrane 3 Duringconstruction . 3.1 Methods of construction 3.1.1 Qualityofstone . 3.1.2 Constructionofagabion 3.1.3 Quality of finished work . 3.1.4 Examples of gabion structures 3.1.5 Stonequalityandtests . 3.2
5、Administration 3.2.1 Preparation of foundation for gabion construction . 3.2.2 Toe french for pitching 3.2.3 Testingstone 3.2.4 Field tests on lacing 4 Quality control and other considerations . 4.1 Quality control 4.2 Disputes 4.2.1 Preparation of bedding for gabion construction Drawings Gabion box
6、 construction (Figures 1 to 11) Gabion mattress construction (Figures 12 to 22) First revision 24 June 1996 This section of the code supersedes SAW 0120-5 : Section DK:1984 Approved by the PRESIDENT OF THE SOUTH AFRICAN BUREAU OF STANDARDS CODE OF PRACTICE SABS 01 20-5 : Sectlon DK:1996 SABS 1200 DK
7、 : Gabions and pitching NOTE - The clause number(s) given in brackets at the beginning or after the heading of a clause idare, unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 DK. 1 Start of construction 1.1 General For the purposes of this part of the code, contract adm
8、inistration starts with instructions to the contractor to commence work as set out in 4.1 of the Introduction to the code. 2 Immediately after the handing over of the site 2.1 General The engineer and the contractor should agree on the arrangements to be made for approval of excavated foundations as
9、 soon as the foundations are ready to receive gabions or toes for pitching, as applicable, and the engineer should give immediate attention to all other matters necessary to ensure that the start of the contract is not adversely affected by lack of information. 2.2 Geotextiie or geomembrane (3.1.3 a
10、nd 3.1.4) Where the contract requires that the contractor provide a geotextile or a geomembrane, he should (immediately after the award of the contract) advise the engineer of the make and grade of geotextile or geomembrane which he proposes to use, and obtain the engineers approval before placing t
11、he order for the delivery of the material. (See also l .l and 3.2.2 of section DK of SABS 0120-2.) 3 During construction 3.1 Methods of construction 3.1 .l Quality of stone (3.1 .l, 7.3 and 7.4) The contractor is required to supply stone that complies with the specification and, should he have any d
12、oubts as to its durability or its ability to withstand weathering, he should, at his own expense, carry out the appropriate tests. The engineer is entitled to expect that the stone being used will comply with the relevant requirements. He may, if he so wishes, arrange for the appropriate tests to be
13、 carried out and the costs of these tests must be borne by the contractor if the stone fails to comply with the relevant requirements, and by the employer if it does comply. 3.1.2 Construction of a gabion (5.2.3) 3.1.2.1 General In general, tightness of mesh, well-packed filling, and tightness of la
14、cing are essential in all gabion structures. Pairs of wire braces, each wire of nominal diameter 2 mm, are generally sufficient to prevent the deformation of a cage if they are provided at the rate of 4 braces per cubic metre of gabion volume for gabions of depth up to 1 m. Gabion cages of de th exc
15、eeding 1 m should not be constructed. Details of a manufacturels recommended method of P construction ) of a gabion box and a gabion mattress are set out in 3.1.2.2 and 3.1.2.3, respectively, below. 3.1.2.2 Gabion box 3.1.2.2.1 Assembly Unfold each gabion on a hard, flat surface. Stretch it out and
16、stamp out any unnecessary kinks. Make sure that all creases are in the correct positions for forming the box: one for the edge of each end, back and side panel and the lid, and one for each diaphragm (see figure 1). Fold the back, front and end panels into the upright position to form a rectangular
17、box. Join together the top corners of the box with the thick selvage wire sticking out from the corners of each panel. This ensures that the tops of all four sides of the box are level (see figure 2). Begin wiring-up by looping an erid of the binding wire through the top corners of the panels to be
18、joined and twisting the end around the binding wire to secure it. Then lace the wire around the selvages with alternate single loops and double loops at 100 mm intervals (see figure 3). Finally, fasten the wire securely at the bottom corner and poke the loose end inside the gabion. 1) Abstracted and
19、 reproduced with permission from a manufacturer of gabions. SABS 0120-5 Section DK:IW6 Gabions and pitching First revision Next, lift the diaphragms into the vertical position and wire them up to the back and front panels in exactly the same way. NOTE - Tightness of the mesh and wiring is essential
20、at all times. 3.1.2.2.2 Forming the structure Before placing the empty gabions in position, level the site of the structure as much as possible. Once the gabions are in place, it is difficult to remove unwanted material from underneath them. Where possible, wire small groups of empty gabions togethe
21、r off the site, and then carry them to the structure as complete sections for joining to other gabions already in position. This is easier than wiring all of them on site, especially when working in water. Wire the gabions together, using exactiy the same method as for assembling single gabions (see
22、 figure 4). Place them front to front and back to back, so that pairs of facing lids can later be wired down at the same time (see figure 5). 3.1.2.2.3 Stretching gablons before filllng Place the empty gabion or group of gabions in position. By means of rods driven through the two corners into the g
23、round and tied firmly to a good anchorage (see figure 6), secure the end from which work is to start. To prevent the gabion from collapsing, it is important that the length of the rods be such that the rods extend to at least the height of the gabion. Wire the remaining empty gabions one to another
24、as work proceeds (see figure 4). Stretch the opposite side or end of each gabion by inserting bars into the bottom corners and levering them forwards. Keep the top and bottom stretched by tying them firmly to a good anchorage (e.g. a stake driven into the ground) until the gabion has been wired to t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205DK1996CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONDKGPDF

链接地址:http://www.mydoc123.com/p-1028595.html