SANS 10120-4 H-1990 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 4 Typical schedule of quantities Sectio.pdf
《SANS 10120-4 H-1990 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 4 Typical schedule of quantities Sectio.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-4 H-1990 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 4 Typical schedule of quantities Sectio.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 4 Section H-1990 Structural steelwork PART 4 : TYPICAL SCHEDULES OF QUANTITIES SECTION H CONTENTS Clause Page Number 1. DRAWINGS WITH SC
4、HEDULE 1 2. BASIS FOR SELECTION OF SCHEDULED ITEMS 1 3. SEPARATE ITEMS 1 SCHEDULE SECTION : STRUCTURAL STEELWORK 2 DRAW I NGS Drawing H-4.1 - Plan 5 Drawing H-4.2 - Elevation . 6 Drawing H-4.3 - Section . 7 Second Revision August 1990 This section of the code supersedes SABS 0120 : Part 4 : Section
5、H-1983 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS 1 SABS 0120 : Part 4 Section H-1990 Structural steel work SABS 1200 H : STRUCTURAL STEELWORK 1. DRAWINGS WITH SCHEDULE 1.1 Ensure that tender drawings are issued with the schedule of quantities. The drawings may be to any approp
6、riate scale and size and must give at least the infor- mation set out on Drawings H-4.1 - H-4.3. 2. BASIS FOR SELECTION OF SCHEDULED ITEMS 2.1 Subclause 8.3 of SABS 1200 H provides the necessary headings under which i tems for the schedule may be formulated to present, as closely as possible, a true
7、 reflec- tion of the contractors costs. Such items should ensure a soundly based relation- ship between actual costs and tendered prices, thus leading to better pricing, a realistlc basis for the evaluation of variation orders, and a smaller possibility of claims being submitted. The different eleme
8、nts and members of the structure shown on Drawings H-4.1 - H-4.3 have been grouped by types and sizes of elements1 members in the items set out on pages 2, 3 and 4 of the typical schedule in such a manner that the contractor may enter a different price for each level of his unit costs, ranging from
9、heavy steelwork involving a minimum of man-hours and plant- hours per unit mass of steelwork to light steelwork involving a maximum of man- hours arid plant-hours per unit mass of steelwork. 3. SEPARATE ITEMS 3.1 Provide separate items in the schedule for each of the following types of units, as app
10、licable (set the items out in the manner shown in the typical schedule on pages 2, 3 and 4): Beam Girders CraneArder KCx3mS- EiTKersaTbeam type P1 ate girders Compound type Lattice gi rders Plate girder type Compound girders Surge girders Uni versa1 beams Crane rail S Channel S Caste1 l ated beams S
11、i mpl e beams Columns- ETE51 umns Lattice columns Fabricated columns Universal columns Simple columns Sundr Items FfEdTims Conveyor gantries Trestles Wal kways Towers P1 atforms Stairways Cat l adders Fabricated doors P1 ate gutters Crawl beams (straight) Crawl beams (curved) Open grid floors Bolts
12、G3ion bolts Hol dl ng-down bolts Braci n dangl e Double angle Starred angle Silos Bunkers Handrail S Roof trusses Fa1 se rafters Purl ins Gi rts Window posts Door posts Venti l ator frames Trimmers Sag rods Chequer p1 ates SABS 0120 : Part 4 2 Section 1-1-1990 Structural steel work SABS 1200 H : STR
13、UCTURAL STEELWORK NOTE: See Clause 5 of the introduction. P- I tem No. - - .l .2 .2.1 -2.2 .2.3 .2.4 .2.5 .2.6 .2.7 .2.8 .2.9 .2*10 .2.11 .2.12 .2.13 .2.14 .2.15 .2.16 .2.17 .2,18 .2.19 .2.20 .2.21 .2.22 .2.23 .2.24 .2.25 .2.26 “2.27 .2.28 .2.29 .2.30 .2.31 .2.32 -2.33 .2.34 .2.35 .2.36 .2.37 -2.38
14、-2.39 -2.40 ,2.111 P- - Payment refers SABS 1200 AH 8.3.1 1200 H 8.3.1 8.3.1.1 8.3.1.2 PRELIMINARY AND GENERAL p- - - SUPPLY AND FABRICATION Preparation of shop detail drawings Supply and fabrication of steelwork (see Drawings W-4.1, H-4.2 and H-4.3) complete with a1 l the necessarv cleats, brackets
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101204H1990CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART4TYPICALSCHEDULEOFQUANTITIESSECTIOPDF

链接地址:http://www.mydoc123.com/p-1028564.html