REG NASA-LLIS-5936-2011 Lessons Learned Fire Protection System (FPS) Failure at the Launch Control Center (LCC).pdf
《REG NASA-LLIS-5936-2011 Lessons Learned Fire Protection System (FPS) Failure at the Launch Control Center (LCC).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-5936-2011 Lessons Learned Fire Protection System (FPS) Failure at the Launch Control Center (LCC).pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Public Lessons Learned Entry: 5936 Lesson Info: Lesson Number: 5936 Lesson Date: 2011-6-27 Submitting Organization: KSC Submitted by: Amber Porter Subject: Fire Protection System (FPS) Failure at the Launch Control Center (LCC) Abstract: At approximately 9:00 p.m., on 28 January 2010, a six-inch dia
2、meter fire suppression (Firex) main supply pipe coupling separated from a pipe elbow releasing approximately 29,000 gallons of water into the Kennedy Space Center (KSC) Launch Control Center (LCC), Building K6-900, I.R.I.S. case number S-2010-029-00002. The water was released into the fourth-floor R
3、 stairwell, cascading down to all floors below. Much of the facility was flooded with the dirty, brackish water. System reviews should be conducted after major contract changes to ensure all required inspection and maintenance activities are scheduled in accordance with NASA, NFPA and manufacturer r
4、equirements. Description of Driving Event: During a weekly fire pump run for the 3 diesel fire pumps located in the VAB Utility Annex one of the low side pressure reducing valves failed to regulate the pressure from 330 psig to 140 10 psig. The LCC fire suppression water supply loop and all the subs
5、equent wt pipe suppression systems directly connected to the building supply loop were over pressurized in excess of 300 psig. The over pressurization of the entire LCC fire suppression system caused numerous mechanical couplings to partially fail. 28 January 2010, six-inch fire suppression supply p
6、ipe coupling separated from elbow at coupling joint in LCC Stairwell 4R99C. Smaller leaks were in LCC firing rooms, hallways, and offices. 300-500 gallons of water released in VAB Low Bay from ruptured sight glass. Immediately prior to the pipe coupling separation, smaller leaks were observed in the
7、 LCC launch control firing rooms, as well as in the nearby Vehicle Assembly Building (VAB), Building K6-848. Although no critical electronic launch equipment was damaged, facility damages were estimated at over $706,000, and this does not include repair of LCC Firex system as it was a pre-existing c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS59362011LESSONSLEARNEDFIREPROTECTIONSYSTEMFPSFAILUREATTHELAUNCHCONTROLCENTERLCCPDF

链接地址:http://www.mydoc123.com/p-1019510.html