REG NASA-LLIS-3617-2011 Lessons Learned - Performance Measurement Baseline (PMB) Implementation Reporting Expectations on Letter Contract Award.pdf
《REG NASA-LLIS-3617-2011 Lessons Learned - Performance Measurement Baseline (PMB) Implementation Reporting Expectations on Letter Contract Award.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-3617-2011 Lessons Learned - Performance Measurement Baseline (PMB) Implementation Reporting Expectations on Letter Contract Award.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Public Lessons Learned Entry: 3617 Lesson Info: Lesson Number: 3617 Submitting Organization: MSFC Submitted by: Kristen Kehrer Subject: Performance Measurement Baseline (PMB) Implementation Reporting Expectations on Letter Contract Award Abstract: The Earned Value Management (EVM) requirements, incl
2、uding Contract Performance Report (CPR) reporting, were included in the Constellation Program (CxP) Extravehicular Activity (EVA) Project prime contract. The Prime operated without a Performance Measurement Baseline (PMB) for a year while under letter contract. Letter contract definitization can tak
3、e months/years to occur, and during that time NASA projects have little insight into contract performance. Additionally, there is a tendency for contractors to delay establishing a PMB, even an interim PMB, prior to contract definitization. Without an interim PMB, it is difficult to determine curren
4、t performance, assess technical, cost or schedule risks/impacts and planning and control by both the prime contractor and the government is diminished. Description of Driving Event: The event driving this lesson learned was a pilot project conducted on the CxP Extravehicular Activity (EVA) Project a
5、s part of the Agencys EVM Capability Project. Lesson(s) Learned: Prime contractors must comply with the EVM System and reporting requirements included in Letter Contract awards and projects should only allow waivers to these requirements due to extreme circumstances. This includes the initialization
6、 of the PMB, submission of the CPR and the Integrated Master Schedule (IMS), and conduct of the Integrated Baseline Review (IBR) to the extent practical within 180 days after award (in accordance with the contract EVM clause). Additionally, Projects should strive for timely contract definitization o
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS36172011LESSONSLEARNEDPERFORMANCEMEASUREMENTBASELINEPMBIMPLEMENTATIONREPORTINGEXPECTATIONSONLETTERCONTRACTAWARDPDF

链接地址:http://www.mydoc123.com/p-1019428.html