1、Public Lessons Learned Entry: 3536Lesson Info:a71 Lesson Number: 3536 a71 Lesson Date: 2010-08-17 a71 Submitting Organization: JPL a71 Submitted by: David Oberhettinger Subject: Schedule a Lessons Learned Debriefing at Each Major Project Milestone Abstract: The JPL practice of issuing a request prio
2、r to major project milestones for flight projects to prepare a lessons learned briefing was first implemented prior to the WISE PLAR. It is unlikely that JPL would have obtained this WISE project performance information through the informal channels that furnish most JPL lesson learned candidates. T
3、he resultant information on WISE project preparations for launch campaign contingencies will likely be informative to flight projects entering the mission phase that WISE was reviewing at the PLAR. Description of Driving Event: The NASA/Caltech Jet Propulsion Laboratory (JPL) has been successful in
4、meeting NASA requirements (Reference (1) for collecting lessons learned, including both mishaps and instructive successes. JPL has a Lessons Learned Committee (LLC) that has met weekly since 1984 to screen and prioritize lesson learned candidates and to assure that the draft lessons are factual and
5、the recommendations are implementable. Most of the lesson learned candidates are drawn from informal sources because significant project events are usually widely known at JPL. Other, more formal sources include mishap investigation board reports and anomaly reports. However, it is possible that a t
6、op-down review of significant incidents conducted by the managers of spaceflight projects would elicit additional valuable lessons learned. Although JPL does formally require (Reference (2) projects to report lesson learned candidates to the LLC, compliance has been spotty. Recently, JPL implemented
7、 a new practice to facilitate the identification of lesson learned candidates by spaceflight projects. The JPL Associate Director for Flight Projects and Mission Success has directed the JPL Lessons Learned Manager (JPL Office of the Chief Engineer) to contact JPL spaceflight project managers prior
8、to major project technical reviews and milestones to request a debrief of lessons that were learned during the prior mission phase. This action is to be taken only for scheduled spacecraft-level or mission-level technical reviews- not for reviews of component systems like the Ground Data System. The
9、 subject milestones include the: a71 System Requirements Review (SRR) a71 Preliminary Design Review (PDR) a71 Critical Design Review (CDR) a71 Post-Launch Assessment Review (PLAR) a71 End of primary missionThis practice was first implemented prior to the PLAR held in January 2010 for the Wide-field
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS35362010LESSONSLEARNEDSCHEDULEALESSONSLEARNEDDEBRIEFINGATEACHMAJORPROJECTMILESTONEPDF

链接地址:http://www.mydoc123.com/p-1019427.html