1、Lessons Learned Entry: 1529Lesson Info:a71 Lesson Number: 1529a71 Lesson Date: 2004-10-11a71 Submitting Organization: JPLa71 Submitted by: David J. OberhettingerSubject: Ensure Test Monitoring Software Imposes Limits to Prevent Overtest (2003) Abstract: When a GSE power meter registered zero due to
2、an AC power glitch, the test monitoring and control software interpreted this as a loss of power and increased the test level past the maximum rating of the test article. This ground test error could have damaged flight hardware. Perform FMEA on test equipment to identify all potential GSE-induced f
3、ailure modes. Either program the test control software or insert a limiting hardware device to prevent overtest.Description of Driving Event: Vacuum testing of the Mars Reconnaissance Orbiter (MRO) telecommunications subsystem at JPL included a multipaction test of the diplexer, which is conducted w
4、ith the equipment powered. (“Multipaction” is a phenomenon that occurs when radio frequency (RF) transmit power accelerates electrons in a vacuum, causing a corona discharge and possible RF system failure.) During this test, an accurate indication of the power output of the test equipment was not pr
5、ovided to the test monitoring software. This caused the test monitoring software to command the test equipment to increase the transmitter output to a potentially harmful level. Analysis showed that the GSE power meter stopped taking measurements, possibly due to an AC power anomaly. The test monito
6、ring software then interpreted the zero reading from the power meter as a loss of power, and responded by increasing the drive level of the X-Band Synthesizer to a level sufficient to drive the Traveling Wave Tube Amplifier (TWTA) to maximum output power. To prevent a recurrence, an attenuator or li
7、miter was inserted to maintain the RF output below a specified level, preventing the TWTA from providing more power than the maximum rating of the test article should the power measurements fail. References: (1) Jet Propulsion Laboratory Problem/Failure Report No. Z82462, November 12, 2003. (2) LLIS
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS15292004LESSONSLEARNEDENSURETESTMONITORINGSOFTWAREIMPOSESLIMITSTOPREVENTOVERTEST2003PDF

链接地址:http://www.mydoc123.com/p-1019167.html